Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Delineate Three-Dimensional Iron Ore Geology and Resource Models Using the Potential Field Method

    By A Guillen, J-P ChilFs

    Most 3D geological modelling tools were designed for the needs of the oil industry or detailed mine planning and are not suited to the variety of situations encountered in other application domains. M

    Jan 1, 2009

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    Coke and its Influence on Blast Furnace Aerodynamics

    By Hyslop W

    It is shown that coke has a major influence on the pattern of operation and on the aerodynamics of the blast furnace and that the physical and chemical characteristics of coke, at each stage in the f

    Jan 1, 1975

  • AUSIMM
    Development and implementation of a long tendon bolting system utilising resin grouting technology

    By T Sprague, D Pateman

    "The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro

    Oct 16, 2017

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    "A Geometallurgical Proxy for Nickel Laterite Heap Leaching"

    By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman

    "Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long

    Jun 15, 2016

  • AUSIMM
    Development of a nitrogen prediction model for 320 tonne converter

    By Y D. Jeon, K S. Kim, C-H Eom, C M. Yoon

    The carbon neutrality continues to require reduction of carbon usage in ironmaking and steelmaking processes. Specially, it is expected that the hot metal ratio (HMR) in the steelmaking process should

    Aug 21, 2024

  • AUSIMM
    The critical role of mine planners in the evolution of closure at BHP

    By J Heyes, R Getty, M Sanapala

    Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti

    Sep 18, 2023

  • AUSIMM
    Assessing corrosion of reinforcement on a large scale

    By N Power, R Hassell, E Jones

    Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels

    Nov 29, 2022

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015

  • AUSIMM
    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    The necessity of 3D analysis in open pit, rock slope, stability analysis – in theory and practice

    By A Mcquillan, N Bar

    Geotechnical models developed during the open pit mine planning stage are generally three-dimensional (3D) in component to capture the spatial variation in geological, structural, hydrogeological and

    Nov 29, 2022

  • AUSIMM
    Improving crusher throughput using a problematic ore index based on simple, first principles geology

    By T Walton, C Perring, M Pepper, G Gerber

    The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st

    Mar 22, 2022

  • AUSIMM
    Energy complexities in complex orebodies

    By M Ziemski

    The provision and management of energy in both fuel and electricity forms is an increasingly important consideration for mines. Pressures from communities, governments and markets are increasing towar

    Nov 21, 2018

  • AUSIMM
    Experimental study on the mechanism of gas-coal dust synergistic control based on compound reagents enhanced water spray technology

    By B Zhao

    Gas and coal dust, as potential harmful elements (PHEs) produced during mining, are considered two serious threats to the safe mining and the health of miners because of its explosive and pathogenic p

    Oct 12, 2022

  • AUSIMM
    Improving drill productivity and delivering better geophysical data faster

    By T A. J Hopper, S Mukkisa, K-O Ott, D Palmer

    RIG Technologies has developed new technology that can successfully acquire high quality natural gamma ray (GR) and hole deviations, downhole while drilling, on reverse circulation drills. This techno

    Nov 8, 2021

  • AUSIMM
    Strain-dependent Stiffness of the Weathered Melbourne Formation

    By Z Terzic, M Schult, D Chu, S Macklin

    The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be

    Sep 17, 2014

  • AUSIMM
    On equitable distribution of mining wealth and the social licence to operate imperative – an African case study

    By S Roberston, G Batt, R Shanahan, B Shah, A Trench, H Bromfield

    The geographic imperative of ore systems leaves mining, more so than virtually any other aspect of modern industry, heavily dependent on obtaining and maintaining social licence to operate. A prospect

    Nov 21, 2018

  • AUSIMM
    An Occupational Health and Safety Perspective on the Water Systems in Mining

    By J Field

    Many aspects of water use in mining are driven by the technical requirements for water. There has been little consideration given to both the safety and the health requirements. Workers in the mining

    Jan 1, 2006

  • AUSIMM
    A quantitative risk assessment tool for geothermal outbursts at Lihir Gold Mine

    By M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr

    Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the

    Nov 29, 2022