Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered RockBy S Kowalczuk, S V. L Barrett
The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to
Sep 17, 2014
-
Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG millBy N S. Weerasekara, S Town, E Lessing, J A. De Torres
Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi
Aug 29, 2018
-
Reducing Bench Turnover Time and Improving Shovel DigabilityBy D Kavanagh, C Michaud
"A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im
Nov 15, 2016
-
How the Use of Market-Based Risk Metrics can Undervalue Good Mining Projects and Overvalue Poor OnesBy T Y. Dube
In this paper current net present value (NPV) based mine valuation techniques that take into account market and private risk are discussed and analysed. Potential pitfalls that arise from the applicat
May 24, 2012
-
Origin of Sedimentary Rock-Hosted Gold Mineralisation at Kyaukpahto, Kawlin-Wuntho District, Northern MyanmarThe Kyaukpahto gold deposit is located at latitude 23¦ 47Æ 55" N and longitude 95¦ 56Æ 35" E in the Kawlin-Wuntho district, Sagaing Division, Myanmar. Gold mineralisation is hosted in sandstone of the
Jan 1, 2008
-
Getting Optimum Value from Ore Characterisation Programs in Design and Geometallurgical Projects Associated with Comminution CircuitsInevitably the 'post-boom' era has changed the emphasis of many mining companies away from new project development and expansion to optimisation of existing operations. However, regardless o
Jan 1, 2009
-
Cities as Mine Sites of the FutureBy M Warnken
Major cities are not only the focal point for AustralianÆs work, leisure and homes, they also are the focal point for the flow of resources into the built environment, motor cars and transportation an
Jan 1, 2006
-
Mixed Media Grinding - A Refractory Gold Case StudyBy C Bartle
In many operations the use of less electrochemically reactive grinding media in the first grinding stage (for example, rod milling and high aspect ratio SAG milling) is rarely considered. Therefore, i
Jan 1, 2008
-
Julius Kruttschnitt Mineral Separation Index - Small-Scale Test to Characterise the Flotation Response of an Ore TypeBy S Morgan, D J. Bradshaw, S Schwarz
The characterisation of the flotation kinetic response in future mining deposits is important because the flotation response is affected by changes in ore mineralogy. Current methods for characterisin
Oct 29, 2012
-
The synergistic interaction between hexanol and dithiophosphate at the air-water and galena-water interfaceBy D Pienaar, B McFadzean, C T. O’Connor
Collector and frother molecules in sulfide mineral flotation are thought to have separate roles in the flotation process, where the collector selectively hydrophobizes the mineral surface and the frot
Aug 24, 2022
-
Thermodynamics of Indium Cadmium MeltsBy Iwu GO, Almond DP, Joasoo _
The gravimetric integral Knudsen effusion method was used to measure cadmium activity values in binary liquid In-Cd alloys in the range 523 to 573 K. The activity measurements together with other s
Jan 1, 1980
-
The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case studyBy D A. Williams, P J. Chapman
The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus
Jul 23, 2018
-
On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant PerformanceBy D Morgan, K Jones
"In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co
Oct 10, 2016
-
Study on change in mould slag characteristics during casting Ti containing steel gradesBy M Ranjan, C R. Borra, P Palai, P P. Sahoo
Change in mould slag composition during casting of medium alloy steel is caused by the redox reaction between molten steel and mould flux. Mould flux generally contains a certain amount of SiO2, but e
Aug 21, 2024
-
A New Reagent for Selective Flotation of Copper SulphidesBy Alesse V, Belardi G
A new class of collectors, Mercapto-Benzo-Oxazoles (MBO), exerting selective action on copper sulphides in the presence of Pb, Zn and Fe sulphides (galena, sphalerite and pyrite), has been synthesis
Jan 1, 1993
-
Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, AustraliaBy A Fowler
The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit
Aug 22, 2011
-
Thin spray liners for face support at KanmantooBy B Roache
Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers
Mar 29, 2023
-
Driving Haulage Productivity Improvements through Industry–Academia CollaborationBy R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch
"The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e
Nov 15, 2016
-
Adding value with reverse circulation drilling at Pueblo ViejoBy L Ventura, M Almond
The Pueblo Viejo project in the Dominican Republic installed an innovative sample system on its reverse circulation (RC) drilling rig during commissioning and subsequent commencement of operations. As
Sep 20, 2017
-
Development of a Pyrite Regrind Circuit at Telfer Gold MineBy D R. Seaman, Y Peng, F Burns, D J. Bradshaw
Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh
Oct 29, 2012