Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring Locations

    By J Loeb, D Thornton

    Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste

    Aug 18, 2014

  • AUSIMM
    Critical state soil mechanics in filtered TSF design

    By J Rola

    This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro

    Jul 1, 2021

  • AUSIMM
    Airborne Gravity Gradiometry and Magnetics in the Search for Economic Iron Ore Deposits

    By R Miller

    The enrichment of magnetite to haematite and haematite-goethite leads to a coincident magnetic low and gravity high within the banded iron formation. Palaeochannel deposits of pisolitic limonite can b

    Jul 11, 2011

  • AUSIMM
    A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine Closure

    By B N. Noller, J C. Ng, S L. Bruce

    Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc

    Jul 16, 2014

  • AUSIMM
    Ore Reserve Systems-Principles and Practice

    By Gooday PE, Brech GE

    Ore reserve categories used by Pancontinental Mining fall into one of three fundamental groupings: Geological In Situ Reserves Mining Reserves Production Estimates The first of these describes the

    Jan 1, 1987

  • AUSIMM
    Comparison of Vein Styles and Distributions Between Rhyolite- and Andesite-Hosted Epithermal Gold-Silver Deposits of the Hauraki Goldfield, New Zealand (06c3b072-9151-48ab-ab31-f3f90e69a1e6)

    By Christie A. B, Swain A, Brathwaite R. L

    This study provides quantitative data on vein distributions within seven selected epithermal systems, four deposits hosted predominantly in rhyolitic rocks: Ohui, Wharekirauponga, Neavesville and Kom

    Jan 1, 1995

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Modelling Dust Plume Movement Resulting from Surface Blasting Operations

    By S Bhandari

    A model for predicting dust plume dispersion from blasting operations using the Eulerian mathematical algorithm has been developed. This model considers atmospheric stability, and wind velocity and di

    Nov 8, 2011

  • AUSIMM
    Tunnel Design in an Alliance for Waterview Connection, New Zealand

    By D Maconochie, S Pradhan, M Reed

    The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi

    Sep 17, 2014

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Acousto Ultrasonic-Echo (AU-E) and Ultrasound Technology ù Determination of the Lining and Cooling Element Condition of Operational Furnaces

    By A Sadri, S Smith

    In the metal and mineral industry, different empirical techniques are used to estimate the remaining thickness of the lining within an operating furnace. The disadvantage and costly factor when using

    Jan 1, 2006

  • AUSIMM
    Bauxite in the Darling Range, Western Australia (b4228c9e-6550-4c4e-a51f-91a512d00dff)

    Bauxitic laterite of variable thickness and grade is best developed in the Darling Range but covers a large part of the southwest corner of Western Australia. Its limits are defined by the rainfall is

    Jan 1, 1964

  • AUSIMM
    Resource Evaluation of Nuggety Slate-Hosted Gold-Quartz Reefs

    By A E. Annels, G F. Johansen, B W. Cuffley

    Nuggety gold-quartz reefs are characterised by localised, high-grades and in many cases coarse free-gold. Geometrical and grade complexities are often observed. The high-grade regions are generally er

    Jan 1, 2000

  • AUSIMM
    Chemical Enhancement to Magnetic Separation for Effective Separation of Silicates from Titanium Phases at Finer Particle Size Fraction

    By S A. Ravishankar

    In heavy minerals separation, the titanium and iron oxide phases are separated from silicates in the coarser particle size range (80 - 150 mm) using magnetic and electrostatic separators. With the ong

    Oct 5, 2011

  • AUSIMM
    Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame Them

    By J Paradis, K Dudgeon, M Topping

    At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon

    Aug 18, 2014

  • AUSIMM
    Environmental Management of Sulphidic Waste Rock at Mt Lyell, Tasmania

    By Stanley I. M, Brett D, Dickson R

    The Mt Lyell Mine, situated in Queenstown on the west coast of Tasmania, has a production history of more than 100 years. Previous mining activities have resulted in substantial modifications to en

    Jan 1, 1997

  • AUSIMM
    Is Ion-Exchange Technology for Gold Extraction Ready for Commercialisation?

    By J S. J van Deventer, D C. Shallcross

    New developments are taking place in the recovery of gold from leached pulps that are based upon the adsorption of the metal cyanide species onto ion exchange resins. Despite the success of several re

    Jan 1, 1998

  • AUSIMM
    Probablistic Analysis of Risk in Mining Projects - As Easy as 123

    By Dorricott M. G, McAllister J

    This paper is concerned with the application of a probabilistic approach to the risk assessment of mining projects.In current practice, sensitivity analysis is the most commonly used deterministic app

    Jan 1, 1992