Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availabilityBy E Shilov, R Dixon, L Tovey
BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit
Nov 29, 2022
-
Geology of Perseverance Nickel Deposit, Western AustraliaBy Alichurch P. D
Perseverance nickel deposit is located at latitude 27¦ 491S, longitude 1200 42'E, 330 km north of Kalgoorlie, Western Australia. Gossanous outcrops were discovered in April, 1971, and after fur
Jan 1, 1973
-
Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation DrillingBy M Goers, M Almond
"The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w
Aug 21, 2012
-
Modern Mining GeologyBy G Fahey, S Rose
"Mining geology as a defined profession is only about 100 years old. The successful modern mine geologist needs to be a multidisciplinarian, but also needs to maintain a focus on the key outputs of th
Aug 18, 2014
-
Blasting Physics-What the Operator Can Use in 1975Blasting effectiveness must be gauged by total production costs. ANFO charges made up in polythene "sausages" are not as profitable as is indicated by the price of ANFO. All-slurry charges are wa
Jan 1, 1975
-
Sensible Cost Cutting for Resource ProjectsBy D Connelly
As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c
Aug 8, 2011
-
Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation ObjectivesBy A A. Puhalovich
The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca
Jul 10, 2012
-
Predicting Variations in Mill FeedBy P McCarthy
The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction
Aug 8, 2011
-
Influence of the occurrence state of Al2O3 on the metallurgical performance of product sinterBy J Pan, Q H. Li, D Q. Zhu, C C. Yang, X Wang, Z Q. Guo
Al2O3 in natural iron ores generally occurs in goethite, kaolinite, gibbsite, hematite and iron carbonate. When the content of alumina in sinter increases from 1.11 per cent to 3.50 per cent, the redu
Nov 8, 2021
-
Analysing reduced conveying capability of the orepass systems in Malmberget mineBy T Wettainen, G Shekhar, M Stromsten, B Skawina
The aim of a transportation system in an underground mine is to move the rock masses from one location to another in the most preferable manner by minimising the long and short-term operational costs.
Mar 15, 2021
-
Drill hole spacing analysis for classification and cost optimisation – a critical review of techniquesBy J Levett, O Rondon, I Glacken
Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl
May 24, 2023
-
The Application of AS 61508 to Road Tunnel Fire and Life Safety SystemsBy M Taylor
The Project Specification and Technical Requirements documents associated with several recent large road tunnel projects within Australia have specified the application of AS/IEC 61508 – FunctionalSaf
Mar 8, 2011
-
A Review of the Influence of Gas Pressure on Block Stability during Rock BlastingBlasting is an essential component of most mining operations, and is used to reduce the rock mass to a workable size distribution, as well as to create stable openings and pit walls. Frequently, there
Jan 1, 1999
-
Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracyBy D Reid, J McKibben, M Noppe
International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo
Mar 22, 2022
-
Acid Mine Drainage Treatment at Herbert Stream, StocktonBy M Watts, P Lindsay
Herbert Stream, a tributary of the Waimangaroa River on the Stockton Plateau, has elevated metal concentrations and low pH characteristic of acid mine drainage (AMD). Dissolved aluminium concentration
Jan 1, 2007
-
Professional Engineering Competency Standards in the Queensland Mining IndustryA key issue in maintaining the mining industryÆs social contract to access community-owned resources, is the need to be able to demonstrate professional management of resource extraction and the risk
Jan 1, 2009
-
Are Your Megaproject Schedules and Costs Under – or Out of – Control?By P Mitchell, S Pushpan, G Ferres, K Bobbermien, L Hudson
"Falling commodity prices and a rising supply surplus have ushered in a period of restraint in capital project investment across the global mining and metals sector. Competition for capital project fu
Mar 8, 2016
-
In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case studyBy K Grohs, A Satriawan, S R. Pearce
Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi
Aug 2, 2023
-
DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First PrinciplesBy P Vass, C Butler, J Condon, B Hooper
DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing
Sep 29, 2013
-
Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnaceBy S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka
The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of
Jun 19, 2024