Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Study of the Hydrochlorination Reactions of the Nickel Segregation Process

    By Young D. R, Webb I. D

    The hydro-chlorination of Fe2O3 and Fe304 has been investigated in the range 850-950¦C in order to elucidate the role of iron in the segregation process for nickeliferous laterites. The kinetics o

    Jan 1, 1987

  • AUSIMM
    Fluxing options and slag operating window for Metso’s DRI smelting furnace

    By K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye

    Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace

    Jun 19, 2024

  • AUSIMM
    Applicability of Categorical Simulation Methods for Assessment of Mine Plan Risk

    By A Jewbali, R Perry, R Inglis, L Allen

    "The use of conditional simulation to characterise mine plan uncertainty is increasing for the assessment of risk in mining projects. While the development of grade uncertainty profiles is relatively

    Nov 24, 2014

  • AUSIMM
    Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical Techniques

    By D J. Bradshaw, B Lottermoser, A Parbhakar-Fox

    "Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency

    Sep 29, 2013

  • AUSIMM
    Processing Copper-Gold Ores with Ammonia or Ammonia-Cyanide Solutions

    By La Brooy S R, Fenton K

    A low grade copper flotation tailing from Telfer containing 1.2% Cu as chalcocite and cuprite and 5 gt-t Au was leached with ammonia, cyanide and ammonia-cyanide mixtures to extract copper and/or go

    Jan 1, 1991

  • AUSIMM
    Trigger Release Mechanism for Release of Mine Water to Magela Creek

    By McGill RA

    The Ranger Uranium Mine is surrounded by a World Heritage National Park. The strict environmental controls under which the mine operates are based on scientific and social requirements. Release of n

    Jan 1, 1988

  • AUSIMM
    Bucket Fill Factors - A Laboratory and Field Study with Implications for Blasting

    By M Noy, P Hawkes

    Improvements in the drill and blast process can impact on loader performance in a number of ways. The main effects being improved loading cycle times, less non-productive cycles such as oversize remov

    Jan 1, 1999

  • AUSIMM
    An Investigation into a Water Inflow at Wongawilli Colliery, Southern Coalfield, New South Wales

    By Poole GR

    An unusually high flow of water from an oxtr.iction panel in Wongawilli Colliery pr,;npted the investigation of the possible sources of the water. It is more probable that water is derived f r,m s

    Jan 1, 1986

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Solomon Iron Deposits – Continued Growth and Development

    By C Simpson

    In 2011 the forecasted world demand for iron ore continues to grow, and during this time Australia is looked upon as a reliable supplier of high quality ore. The expansion of the current Australian mi

    Jul 11, 2011

  • AUSIMM
    Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, Australia

    The Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi

    Jan 1, 2005

  • AUSIMM
    Needed New Technologies for the Development of Earth Resources: Energy, Water, Wastes, Mining (fb564f69-f9d2-4e41-b882-2e207532a0de)

    Our ultimate resources come from the Sun and the Earth System. At this time we face a world crisis in energy, water and soil resources. Global pollution problems are increasing in almost all nations.

    Jan 1, 1995

  • AUSIMM
    Soft Computing Approach to Predict Blast-induced Flyrock

    By N Gupta, R Trivedi, S Bhandari

    Managing blasting operations in four mines surrounded by villages is a challenging task. This study aims to compare the blast-induced flyrock as observed in opencast mines by predicting flyrock distan

    Aug 24, 2015

  • AUSIMM
    Research Organization

    In considering the organization of research, it is necessary to know just what research is, what objects are in mind when setting out to conduct research, and what are the functional units which are r

    Jan 1, 1950

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and Future

    By M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken

    "BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to

    Sep 29, 2013

  • AUSIMM
    Bankshooting Techniques at Moura Open Cut Coal Mine, Queensland

    By Hoppe AJ

    Drilling and shooting techniques at Moura open-cut have evolved over a period of 16 years and are the result of hard earned experience combined with established practices and consul- tation with pro

    Jan 1, 1978

  • AUSIMM
    Challenges in Developing Integrated Process Models Based on Industrial Survey Data

    By M Yahyaei, F Vos, J Siliezar

    Site-based case studies (including data collected from industrial surveys) and their application in evaluating circuit performance, have a significant role in developing reliable process models. Such

    Sep 1, 2014

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011