Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geology and Nickel Sulphide Mineralization, Honeymoon Well, Western Australia

    By Woodhouse M, Andrews D, Drew G

    The nickel deposits within the Honeymoon Well project area (26¦ 40'S, 120¦ 25'E), located 45 km south of Wiluna, occur in the northern part of the Agnew-Wiluna belt (Figure 1; Hill et at,

    Jan 1, 1996

  • AUSIMM
    Novel Online Analysis Applications in the Iron Ore Industry

    Thermo Fisher Scientific is the worldÆs leading supplier of analysers for laboratories and process industries. The companyÆs X-ray fluorescence (XRF)-based slurry immersion probes were originally deve

    Jan 1, 2007

  • AUSIMM
    New Characterisation of Deep Crustal Structure in the Taupo Volcanic Zone and its Implications for Ongoing Gold Exploration by Glass Earth Limited

    By D Henderson, K Howie

    In 2005, Glass Earth Limited (GEL) commissioned two large area detailed airborne geophysical programmes in the Taupo Volcanic Zone (TVZ). In the first survey Bell Geospace Ltd of Scotland conducted an

    Jan 1, 2007

  • AUSIMM
    A New Method for Rapid Vertical Development of Underground Ventilation Shafts

    By R Markoski, P Grealish

    The requirement for rapid vertical development for underground ventilation is often a factor when dealing with dynamic mine plans, with short vertical developments being used to optimise ventilation s

    Sep 17, 2014

  • AUSIMM
    Parameters Affecting the Shield Support Efficiency in Longwall Mining

    By Hsiung SM, Jiang YM

    The orientation and location of the hydraulic legs are two very important parameters for the design of shield supports in longwall mining. Studies have shown that leg orientations and locations of

    Jan 1, 1988

  • AUSIMM
    Composition, Lithochemistry and Radiogenic Isotopes of Porphyritic and Equigranular Intrusions in the Ertsberg Mining District, Papua, Indonesia

    By G de Jong, W Sunyoto, M Cloos

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Ertsberg mining district is a 100 km2 area in the highlands of Papua, Indonesia. The di

    Mar 18, 2015

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    Dependence of Flame Front Speed on Iron Ore Sintering Conditions

    By J Zhao, C E. Loo

    The flame front is a narrow region in the iron ore sintering bed where coke particles combust. The maximum flame front temperature is as high as 1400°C. At high temperatures, the sinter mix compo

    Jul 13, 2015

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Back to basics: resourcing the mining industry

    By S Dunbar, S Harrison, J Cilliers

    ‘Those who cannot remember the past are condemned to repeat it.’George Santayana (16 December 1863 in Madrid, Spain to 26 September 1952 in Rome, Italy). Philosopher, essayist, poet and novelist.The m

    Aug 29, 2018

  • AUSIMM
    On the flipside: why cost cutting is out; revenue maximization is in and value is always king

    By H Allday

    The mining industry’s attention has shifted over the last decade with the recovery from the downturn resulting in greater development of innovation and new work methods in a bid to remain competitive

    Mar 15, 2021

  • AUSIMM
    Rethinking variogram modelling

    By A Boucher, M Baudin, P Androszczuk, I Minniakhmetov, A Rigby, P Machado, M Wright, B Van Dijken

    IGO Ltd’s (IGO’s) Nova Operation (Nova), which is 160 km east-north-east of the town of Norseman in Western Australia (WA), mines and processes nickel-copper-cobalt (Ni-Cu-Co) sulfide ore from the mag

    Mar 22, 2022

  • AUSIMM
    Effects of Initiation Delay Time on Narrow Reef Stope Blasting

    By Brinkmann J. R

    In the narrow stopes of South African gold mines, rockbreaking is carried out by drilling and blasting with safety fuse and igniter cord being used as the initiation system. The fuse/gniter cord sys

    Jan 1, 1990

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Improved Planning and Scheduling by Integration of Mining Application Softrware

    By Aspinall T. O, Just G. D

    Computer software systems have been developed to assist in a wide range of specific mine planning and scheduling applications. In selecting appropriate systems for any mining operation it is apparent

    Jan 1, 1992

  • AUSIMM
    Building Safe, Productive Cultures and Leadership

    By M I. Roberts

    Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme

    Jun 22, 2016

  • AUSIMM
    Integrating Measurement, Systems and Leadership to Build Safe, Productive Cultures

    By M I. Roberts

    As Australia’s mining industry painfully retrenches, mining executives and managers strive to remain viable by seeking significant productivity increases directly through process improvement and indir

    Nov 4, 2015

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Kelian Case Study

    By Barlow S

    The Kelian Gold mine project won two excellence awards from the Victorian Division of the Institution of Engineers, Australia. It was a challenging project, fast tracked in a remote and inhospitabl

    Jan 1, 1997

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014