Heat Load Estimation from Conveyor Systems in Mass MinesBy R Moreby, J Kok, L van den Berg
The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems
Aug 31, 2015
-
Operational readiness – what is it and how to get it done?By A G. L Pratt
Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f
Mar 29, 2023
-
Ventilation Officers or Mine Managers? Who should Ultimately be Responsible for Mine Ventilation? A Comparison between Western Australia and QueenslandBy A Halim
"There is still debate about who should ultimately be responsible for the ventilation system in anunderground mine. The Queensland Coal Mining Safety and Health Regulation 2001, states that adedicated
Jun 1, 2012
-
The Use and Optimisation of Ferrous Feed at the Whyalla Blast FurnaceBy G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis
Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability
Jul 13, 2015
-
Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventoryBy J Penman, N Turner, H Liu
This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s
Jul 1, 2021
-
Optimising the Long Term Profit base for Consolidated Rutile LimitedConsolidated Rutile Limited (CRL) was one of the best performing mining stocks of the turbulent 1980s, having a very high payout of franked dividends. In contrast to some other mining groups, it was
Jan 1, 1991
-
Ausenco Carbon Reactivation Design CriteriaBy D Preedy, J K. Claflin, S R. J La Brooy
This paper summarises the lessons learned during a recent carbon reactivation kiln upgrade project at the Sukari Gold Mine in Egypt. The kiln is being replaced to ensure that the plant achieves full v
Sep 26, 2013
-
Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy SystemABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region
Jan 1, 1971
-
Use of Landform Evolution Models to Assess Uncertainty in Long-term Evolution of Post-mining LandscapesBy G R. Hancock, J B. C Lowry, T J. Coulthard
A reconstructed landscape may exert long-term influences on its surrounds and behave in ways that may not be predictable given uncertainties regarding climate, soil and vegetation interactions (Evans,
Jun 28, 2016
-
Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal ChainBy B Olsson, R Norman, M Volz
Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press
Sep 26, 2011
-
Manufacturing of FeSiB high-temperature phase change material by silicothermic reductionBy W Polkowski, M Tangstad, M Wallin, J Jiao
Fe-26Si-9B (wt per cent) alloy has been identified as a potential high-temperature phase change material (PCM) due to its attractive properties, such as its high latent heat of fusion and low volumetr
Jun 19, 2024
-
Systems Modelling for Water Management in Mining and Minerals ù Bowen Basin CoalBy C Hedemann, N Silveste, H Davis, C J. Moran
For nearly two decades water scientists have been debating the need to use appropriate models for the questions being asked and the data available. This paper puts forward a rationale for a hierarchic
Jan 1, 2006
-
Planning for underground mining at Savage River Iron Ore MineBy U Singh
This paper presents the evolution of the studies and strategic plans to extend the life of operations at the Savage River iron ore project in north-western Tasmania. The current Life-of-Mine (LOM) pla
Mar 29, 2023
-
Laboratory Flash Flotation Trends for a Variety of Gold ParticlesBy T D. H McGrath, J P. Vaughan, J Heath, J J. Eksteen
A reliable laboratory method to characterise the response of free gold particles when subjected to flash flotation conditions has been developed by AMIRA P420 researchers at Curtin University. This te
Sep 26, 2013
-
Mining Scenario Analysis and Mine Variable ValueBy B E. Hall, J Poniewierski, A J. Hills
Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea
Mar 24, 2014
-
A Hybrid Life Cycle Assessment and Geographical Information System Model for Sustainable Recycled Aggregate Chain Management in Turin (Italy)By E Garbarino, P Molina, V Badino
Given the ever increasing quantity of construction and demolition waste (C&DW), one of the most challenging issues presently facing policymakers and public administrators in Italy concerns how to
Jan 1, 2009
-
Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.By W. M. LONIE
Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc
Jan 1, 1979
-
The Transition from Semi-autogenous to Autogenous Milling at Waihi GoldBy D Bertoldi, C Haines
"The Waihi Gold Mine (WGM) operated by OceanaGold New Zealand Limited is a wholly owned subsidiary of the OceanaGold Corporation of Australia. Traditionally WGM has stockpiled and processed separate c
Oct 10, 2016
-
Design and Engineering of Flotation Circuits (in Australia)By D Mcleod, S Brindley, S Green
The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit
Jan 1, 2005
-
Introducing HPGR quaternary crushers in a Russian magnetite operation – challenges and solutionsBy B C. Povey, K Lagutin, M Mryasov, V Noll
The current Stoilensky magnetite concentrator comprises a three-stage crushing circuit followed by three stages of ball milling, grinding and concentration to produce a magnetite concentrate with 66.5
Sep 11, 2017