Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Alignment and Differences between the Australian Water Accounting Standard and the Water Accounting Framework for the Minerals IndustryBy A Woodley, A N. Danoucaras
In 2012 the Bureau of Meteorology, under the banner of the Water Accounting Standards Board, released the Australian Water Accounting Standard 1 (AWAS 1). This standard has been in development since 2
Nov 26, 2013
-
Low-Grade Concentrator Regrind Circuit Upgrade at NewcrestÆs Cadia Valley OperationsBy B Clements, R Dunne, J Dioses, S Hart
In April 2003 plant upgrades in the æLow GradeÆ Cadia Hill circuit were undertaken in order to improve concentrate quality and metal recoveries from the flotation circuit. The major changes involved:
Jan 1, 2005
-
Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold ConcentratorBy A Murphy, D Lauder, J Miranda
Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro
Jan 1, 2000
-
The Influence of Solar Radiation on Evaporation for Three-Dimensional Flux Boundary Modelling of Soil Cover Systems on Waste Rock DumpsBy G W. Wilson
Net solar radiation is one of the key factors affecting evaporation from soil covers on waste rock dumps. While net solar radiation is normally taken as a uniform parameter over a site for modelling p
Jan 1, 2003
-
Fluorine Removal From Ok Tedi Copper/Gold ConcentratesBy J W. Glatthaar, M Mavotoi
The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho
Jan 1, 2003
-
Plan Implementation ù How Communication Impacts on Securing Organisational Success in the 21st CenturyBy W Roy
When it comes to plan implementation and securing success in organisations in the 21st century, if there was such a thing as the secret to success it would be effective communication. Commoditisation
Jan 1, 2006
-
A Combined Sorption-Flotation Technology for Gold Recovery From Cyanide Solutions and PulpsA viable flow sheet of the sorption-flotation technology for gold recovery from low-grade ores and concentrates using powdered activated carbon modified by organic compounds as the sorbent-bearer has
Jan 1, 2005
-
Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West QueenslandBy T Baumgartl, C Gonzales, A Soliman, M Edraki
A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b
Jul 16, 2014
-
An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating OperationsBy S Q. Liu, E Kozan
This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is
Nov 24, 2014
-
Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation ToolBy B Maybee, L Fava, D Millar
In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises
May 24, 2012
-
Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin MineBy M S. Kizil, T OÆConnor
It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At
Jul 1, 2013
-
Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six SigmaBy O Bøckman, E Thisted, K H. Esbensen, U Thisted
Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with
May 9, 2017
-
Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine (d53b2c09-d9ab-48b2-94c6-0c6f856d783f)By Bawden WF, Paynter JT
This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxia
Jan 1, 1998
-
Paste Backfill for Enterprise MineBy D Morrison, P Goodman
The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur
Jan 1, 1998
-
"The Business Case for Early-stage Implementation of Geometallurgy– an Example from the Productora Cu-Mo-Au Deposit, Chile"By J L. Macdonald, G S. King
"The development of a predictive geometallurgical model is a multidisciplinary and iterative task that involves both discovery and integration aspects. In this paper, the authors discuss the concepts
Jun 15, 2016
-
Use of Mineralogy to Interpret Laboratory-Scale Acid Rock Drainage Prediction Tests - A Gold Case StudyBy S T. L Harrison, J-P Franzidis, M Becker, N Dyantyi, J L. Broadhurst
Gold mining is a major contributor to the South African economy, but is associated with several environmental issues such as acid rock drainage (ARD). ARD is due to the oxidation of sulfides in gold t
Sep 26, 2013
-
Optimisation of Wash Water on an Iron Ore Spiral to Improve GradeBy C M. Ramotsabi, F Bornman, W Erasmus
Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine
Jul 13, 2015
-
Opening Supports to Segmental Linings – A Novel Shotcrete Support SolutionBy M Burdick, A Harding, M Krulc, M Chappell
Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How
Sep 17, 2014
-
A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century MineBy R Wynn, N Stoitis, R A. Lauten, H Liang
At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a
Sep 1, 2014
-
Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)By L Stitz, S Kinnear, L D. Fabbro
Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further
Nov 26, 2013