Search Documents

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • SME-ICGCM
    Dynamic rock anchors

    By James J. Scott

    Dynamic rock anchors are interior fixtures developed by the author which promise to be a revolutionary development in the field of ground control. The fixtures are designed to be placed in the ground

    Jan 1, 1989

  • AUSIMM
    A revised stratigraphy of Muyua (Woodlark Island)

    By Finlayson EJ

    New detailed mapping, micropalaeont- ology and isotopic dating have been successful in revising the stratigraphy of Woodlark Island. All Middle to Late Miocene intrusives and volcanic rocks have be

    Jan 1, 1991

  • AUSIMM
    Alternative Dispute Resolution and Conflict Management Issues for Minerals Industry Professionals û An Australian Perspective

    Technical disputes, commercial negotiations and workplace/societal conflict are a natural part of doing business and just living itself. Conflict is everywhere û at home (between family and neighbours

    Jan 1, 2006

  • DFI
    Use of CSM to Support a Heritage Building

    By Chris G. Leach

    "Abstract A seven storey Northbridge area of Perth, Western Australia presented residential apartment complex located in the an opportunity for a novel application of Cutter Soil Mix technology (CSM).

    Jan 1, 2014

  • AUSIMM
    Operations at Mount Isa Copper Smelter

    Operations of the new copper smelter at Mount Isa commenced on the 6th February, 1953. Prior to this date a paper by R. V. Anderson (1953) outlined the smelter layout, proposed operation and expected

    Jan 1, 1957

  • AUSIMM
    Achieving Acceptable Dredge Availability at Grey River Gold Mining Limited

    The achievement of high availability of the Grey River Gold Mining Limited's alluvial gold dredge is a tortuous task which will rely upon the dedication of all staff employed at Grey River Gold M

    Jan 1, 1989

  • SME-ICGCM
    The Effect Of Gas Pressure On Coal Strength

    By Najdat I. Aziz

    There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens

    Jan 1, 1996

  • ISEE
    Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA

    By William C. B. Gates

    Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re

    Jan 1, 2016

  • IOM3
    Prediction of drill-bit performance using multi-variable linear regression analysis

    By A. Ersoy, M. D. Waller

    The principal factors which require consideration in predicting drilling rates are the bit-type, the bit operating parameters and the characteristics of the penetrated rock. A single index is not a su

    Aug 1, 1995

  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987

  • ISEE
    Analysis of Marine Blast-Induced Ground Vibrations in the Sudeste Port Project

    By Eraldo Florêncio, Paulo Couceiro, Manuel Lopez Cano

    Specialized marine blasting techniques were required to deepen and widen the access channel and turning basin of the Sudeste Port Terminal in Rio de Janeiro, Brazil. This terminal has been designed to

    Jan 1, 2018

  • SME
    How Safe Are Your Recent Mills? The Compatibility Between FEA And Welding Codes

    By V. Svalbonas, M. Fresko

    The present versions of the Welding Codes, such as BS7608, have long been known to be compatible with hand computations of membrane and bending stress, rather than detailed finite element solutions.

    Jan 1, 2002

  • SME
    Proactive Approach To Addressing Environmental Concerns For Tunneling Under Austin

    By Ray Brainard

    The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot

    Jan 1, 2012

  • NIOSH
    RI 8204 Detection of Filamentous Iron Bacteria in Open Recirculating Cooling Water Systems

    By H. E. Hilliard

    A method was investigated for detecting and counting filamentous iron bacteria in open recirculating cooling systems. It is simple and fast and does not require trained microbiologists. Samples fr

    Jan 1, 1976

  • AUSIMM
    Newmont Tanami Operations – Tailings Storage Facilities

    By S Thacker, M Noakes

    The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and

    Jul 27, 2015

  • SME
    Mineralogical Overview Of The Behavior Of Gold In Conventional Copper Electrorefinery Anode Slimes Processing Circuits

    By T. T. Chen

    The behavior of gold in a conventional copper electrorefinery anode slimes treatment process is expounded on in this study. In the raw anode slimes generated in a copper electrorefinery, gold occurs m

    Jan 1, 2008

  • DFI
    Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous Earth

    By Arash Khosravifar, Matt Steffan

    An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is

    Jan 1, 2018

  • CIM
    Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg Operation

    By Harry Siewert

    "The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet

    Jan 1, 2001

  • SME
    An Early Warning Slope Monitoring System For Local Work Areas In Mines

    By D. Noon

    Mine production crews and drill-and-blast crews may be exposed to unexpected movement of ground when working under pit slopes. Without specialist geotechnical advice and appropriate measurement system

    Jan 1, 2012