Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Analysis Of Rockbolt Performance At The Waste Isolation Pilot Plant

    By Liane J. Terrill

    Rockbolt failures at the Waste Isolation Pilot Plant have been recorded since 1990 and are categorized in terms of mode of failure. The failures are evaluated in terms of physical location of installa

    Jan 1, 1995

  • SME-ICGCM
    A Mine Evaluation Protocol Using Applied Rock Mechanics Techniques

    By Gary B. Petersen

    The author has developed a seven-step process called the Applied Rock Mechanics (ARM) Protocol that the author has used to solve numerous roof stability problems in mines throughout North America sinc

    Jan 1, 2012

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SME-ICGCM
    A Survey of the Current Rib Support Practices and Techniques in U.S. Coal Mines

    By Khaled M. Mohamed, Michael M. Murphy, Ted M. Klemetti, Heather E. Lawson

    "The design of rib support systems in U.S. coal mines is based primarily on local practices and experience. A better understanding of current rib support practices in U.S. coal mines is crucial for de

    Jan 1, 2015

  • SME-ICGCM
    Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction

    By Witold M. Pytel

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi

    Jan 1, 1992

  • SME-ICGCM
    Roof Screening for Underground Coal Mines: Recent Developments (45f180e8-0601-41d7-bc8b-2e9de87bd46d)

    By Craig Compton

    Falls of small pieces of rock from between roof bolts continue to cause fatalities and to injure hundreds of coal miners each year. Roof screen is the most effective way to prevent these incidents,

    Jan 1, 2007

  • SME-ICGCM
    Deep Cover Bleeder Entry Performance and Support Loading: A Case Study

    By Tulu B. Ihsan, Mark A. Van Dyke, Ted M. Klemetti

    "How well do current modeling procedures calculate the rear abutment extent and loading? Does an improved understanding of the rear abutment extent warrant a change in standing support in bleeder entr

    Jan 1, 2017

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Catastrophic Collapse Of Highwall Web Pillars And Preventative Design Measures

    By Karl Zipf

    In highwall mining, once a sufficient number of web pillars are developed, they can fail catastrophically in a domino-type failure, posing a safety hazard to highwall miners and sterilizing mineable r

    Jan 1, 1999

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • SME-ICGCM
    Seismic Events In German Hard Coal Mining (927aed19-540f-49d6-8a7e-8eb1cd5cfc71)

    By Axel Preusse

    Underground coal mining can cause seismic events. There is currently no way to predict such phenomena reliably, in particular stronger events. That is why, according to the current state of the art, e

    Jan 1, 2009

  • SME-ICGCM
    Roof Span Design for Underground Stone Mines

    By Essie Esterhuizen, John Ellenberger, Dennis Dolinar

    "Underground stone mines in the United States use the room-and- pillar method of mining. The stability of the roof between pillars determines the mining dimensions and size of equipment that can be us

    Jan 1, 2010

  • SME-ICGCM
    Work Practices to Manage Bump Prone Ground

    By Floyd Varley

    In deep and highly-stressed coal mining, advanced design practices are used to minimize the potential for damaging events to occur. Despite these design efforts, the hazard of coal mine bumps can not

    Jan 1, 2008

  • SME-ICGCM
    An Application Of Fem Back Analysis Method To Mine Roadway

    Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements

    Jan 1, 1990

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • SME-ICGCM
    Application Of A Polymer-Based Sealing Material To Prevent Roof From Weathering

    By Peter Zhang

    The immediate roof at the test site consisted of laminated clay shale that is likely to be susceptible to weathering. With seasonal dry-wet cycles in the mine ventilation air, the roof in the intake

    Jan 1, 2009

  • SME-ICGCM
    Deriving Input Parameters for Numerical Modeling of Fully Resin Grouted Rock Bolts

    By Michael Alber

    Resin grouted rock bolts are the major support measure in coal mining. They are rather easy and foolproof to install, take immediately load and are the least time consuming support measure for control

    Jan 1, 2006

  • SME-ICGCM
    Drainage Of Water From Abandoned Mines By Horizontal Drilling

    By Alan J. Zeni

    Drainage of water from abandoned underground mines has become important in recent years because of safety concerns when mining near abandoned works or reentering abandoned mines for further developmen

    Jan 1, 1990

  • SME-ICGCM
    The Roof Behavior of a Longwall Tailgate Under Massive Sandstone Strata

    By Yemi Akinkugbe

    Underground coal mining under massive sandstone can present significant challenges if the roof behavior is not well understood. This paper presents a classic cantilever bending/flexing behavior of a l

    Jan 1, 2007