    Possibilities of utilizing mineral wastes in Hungary

    By I. Gombköto, J. Bohm

    "In Europe, and therefore in Hungary opening a new mine is harder and harder. Depletion of mines, unfavourable legal and economic changes, and growing public concerns are the main reasons. Social and

    Jan 1, 2011

  • SME
    Better Fragmentation Through Team Work At Dos Pobres Mine Safford, AZ

    By D. Brandt

    The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup pha

    Jan 1, 2011

  • SME
    Comparison of Performance of Two Commonly Used Flexible Dilatometers (FDT) in Determining Deformation Modulus of a Tunnel Host Rocks ? Introduction

    By Morteza Gharouni Nik

    Flexible Dilatometer Test (FDT) is one of the in-situ test methods for determining the deformational characteristics of rock masses. In this study, several dilatometer tests have been conducted in dif

    Jan 1, 2008

  • SME
    Nuclear Power ? SME Statement

    Nuclear power currently produces about 20% of the electricity in the US, with 104 nuclear power plants located in 31 states. The commercial US nuclear industry contributes over $4 billion annually to

    Jan 1, 2011

  • SME
    Towards an EU Thematic Strategy on the Sustainable Use of Natural Resources: Sustainability Issues related to the EU Minerals and Metals Industry

    By P. Christmann

    "In June or July 2005, the European Commission will present its Thematic Strategy on the Sustainable Use of Natural Resources proposal to the Council and European Parliament, one of the seven Thematic

    Jan 1, 2005

  • SME
    Study On Performance-Based Design For Mine Fire Safety System

    As opposed to a prescriptive-based design, a performance-based fire-protection system design allows the system planner the flexibility in choosing specific method, materials and design tools to achiev

    Jan 1, 2011

  • SME
    The Role Of Recuperation Functions In The Early Stages Of The Mine Planning Of An Iron Orebody

    By Fernando Humberto Muge

    One of the problems that arises in the early stages of the mine planning before the determination of the mining exploitation method is to predict what will be the recoverable ore reserves in tonnage,

    Jan 1, 1982

  • SME
    Evaluations Of Bit Sleeve And Twisted-Body Bit Designs For Controlling Roof Bolter Dust

    By T. W. Beck

    Drilling into coal mine roof strata to install roof bolts has the potential to release substantial quantities of respirable dust. Due to the proximity of drill holes to the breathing zone of roof bolt

    Feb 27, 2013

  • SME
    Application of safety engineering to reduce the risk of haulage accidents in surface coal mines using dump trucks

    By K. Pathak

    Loaders and dump trucks are the most commonly used surface-mining equipment. Negligence of the safety-engineering aspects of dump trucks may result in serious accidents in a mine. A reduction in the r

    Jan 1, 1999

  • SME
    Project Financing For International Mining Ventures

    By Wi11iam I. Rau

    In the recent past, there have been numerous projections of the capital requirements for additional mine and processing capacities required to meet projected non-Communist World demand for minerals du

    Jan 1, 1978

  • SME
    Technology News - GE Supplies Electrical Systems for Bucyrus Draglines

    GE Industrial Systems has received a multimillion dollar contract from Bucyrus International to supply complete electrical systems for three new draglines. These machines will be installed at Coal Ind

    Jan 1, 2000

  • SME
    Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage Project

    By Pratoomkhuan N. Lertsgoon

    A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study

    Jan 1, 2003

  • SME
    Development Of A High Blow Energy Hydraulic Impactor

    By Wm. Ross Wayment, Innes P. Grantmyre

    INTRODUCTION It has been recognized for some time that major changes in mining methods will be required in the near future. Two types of factors contribute to this need for change. Intrinsic factor

    Jan 1, 1976

  • SME
    Equitable Contracting And Risk-Sharing

    By J. K. Lemley

    The human element in large measure dictates success in contracting relationships. Because of our professional backgrounds, we view contracts primarily as either engineers, contractors or owners. A ben

    Jan 1, 1983

  • SME
    Mycobacterium Phlei As A Flotation Collector For Hematite

    By R. W. Smith, A. M. Raichur, M. Misra

    Mycobacterium phlei has very good potential as a hematite flotation collector. The flotation recovery of hematite is dependent upon the solution pH and concentration of the microorganism. The critical

    Jan 1, 1994

  • SME
    Testing Flotation Frothers

    In practice, frothers are selected following general guidenlies and verification by laboratory and/or plant flotation tests. The terms “powerful” or “selective,” which are commonly used to characetriz

    Jan 1, 2004

  • SME
    EPB TBM Technology

    By Werner Burger

    Earth Pressure tunnel boring machines are tackling difficult ground conditions that five years previous were not considered feasible. The technology has evolved that allows EPB TBMs to cross into area

    Jan 1, 2008

  • SME
    A database of ventilation friction factors for Quebec underground mines

    One of the most important parameters in mine ventilation planning is the friction factor (K). Accurate values of friction factors are critical especially when carrying out mine ventilation simulations

    Jan 1, 2009

  • SME
    Microtunnels vs. EPB Risk-Based Selection

    By Michelle L. Ramos

    INTRODUCTION The Ballard Siphon was built in 1935 and consists of two 91.4 cm (36-inch) diameter wood-stave pipes. These pipes convey sewer flowsunder the Ship Canal from northwest Seattle and the Ba

  • SME
    Examination Of Water Spray Airborne Coal Dust Capture With Three Wetting Agents

    By J. A. Organiscak

    Water spray applications are one of the principal means of controlling airborne respirable dust in coal mines. Since many coals are hydrophobic and not easily wetted by water, wetting agents can be ad

    Feb 27, 2013