Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Geometallurgy For A Two Recovery Process Operation ? Cripple Creek And Victor Gold Mine, Colorado

    Cripple Creek and Victor Gold Mine is an epithermal gold deposit located in the Rocky Mountains of Colorado. Surface operations are continuing along with an expansion for an onsite mill to take place

    Feb 27, 2013

  • SME
    Geology of the Vulture Mine

    By Don C. White

    The Vulture mine near Wickenburg, Arizona was a major gold producer from 1863 to 1942, having yielded about 11t(12.1 st) Au and 8t (8.8st) Ag. Gold occurs as coarse native metal and electrum in quartz

    Jan 1, 1990

  • SME
    Has Minerals Industrial Technology Peaked?

    By Robin J. Batterham

    We still need to innovate, but it is getting harder. The real price of metals is declining, return on shareholder value is lower than other industries, and there is a shorter-term focus on staying via

    Jan 1, 2004

  • SME
    Modelling Liberation Of Comminuted Particles - Preprint 09-088

    One of the challenges in the development of mineral processing simulators is the modelling of liberation characteristics of particles produced by comminution circuits. Understanding the mineral charac

    Jan 1, 2009

  • SME
    Key Components For An Effective Filtration And Pressurization System To Reduce Respirable Dust In Enclosed Cabs For The Mining Industry

    By A. B. Cecala

    Enclosed cabs have been used for many years to isolate workers on mobile equipment in the mining industry for health and safety reasons. These enclosed cabs create a microenvironment for workers where

    Feb 27, 2013

  • SME
    Method Of Academic Mining Engineering Research

    By Syd S. Peng

    University research in the U.S. consists of three components; faculty, funding, and graduate students or postdoctorals. Individual faculty is the unit area of research that is not limited, although

    Jan 1, 2009

  • SME
    Drive Options For Belt and Apron Feeders

    By Laszlo Toth

    A feeder is used to control the gravity flow of bulk solids from storage areas, like a bin or a stockpile. For this type of application, it is important to select a proper drive that can fulfill all

    Jan 1, 2003

  • SME
    Investigation Of The Feasibility Of Natural Gamma Radiation Coal Interface Detection Method In U.S. Coal Seams

    By G. L. Mowrey

    One critical element of the U.S. Bureau of Mines (Bureau) autonomous mining research program is the development of a reliable coal interface detection (CID) system. Several candidate CID concepts curr

    Jan 1, 1990

  • SME
    The Construction of the Manhattan Water Tunnel, New York City ? Introduction

    By Edward (Ted) Dowey

    City Water Tunnel No. 3 is being built in order to provide a redundant system for delivering 4,542,500 m3 (1.2 billion gallons) of water per day throughout the five boroughs of New York City. The pres

    Jan 1, 2008

  • SME
    Pilot Study On The Influence Of The Eccentric Speed On Cone Crusher Production And Operation

    By D. Jacobson

    There are many different machine setup parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the eccentric speed at which the co

    Feb 27, 2013

  • SME
    Design of Rock Shafts Adjacent to Heavily Loaded Columns

    By Nikolas K. Sokol

    Underground construction often requires working within a very congested urban environment, including excavating shafts adjacent to highly sensitive and multistoried structures, sometimes even within s

    Jan 1, 2008

  • SME
    Survey And Experimental Studies On Engineering Control Of Machine Noises In Longwall Mining Faces

    By Yi Luo, Jeremy Slagley, Arunkumar Rai, Steve Guffey, Syd S. Peng

    Research was conducted to study the characteristics of longwall mining machine noises and to develop engineering controls for the reduction of noise exposure at longwall faces. Time-motion noise dosim

    Jan 1, 2005

  • SME
    Assessing Ground Ahead Of TBm Tunnel Using Low-Interruption Wireless Seismic Reflector Tracing System

    By Takuji Yamamoto

    High-speed TBM excavation requires rapid ground assessment ahead of excavation, particularly in complex grounds. The Tunnel Reflector Tracing technology (TRT) developed by authors, uses seismic reflec

  • SME
    Geology Of The Marlin Deposit, Guatemala

    By Charles Ronkos, Jeffrey Edwards, Brian Brodsky

    The Marlin gold-silver deposit is in western Guatemala, 15 kilometers south of a major transform fault that separates the North American and Caribbean plates. A district-scale, northwest-trending gra

    Jan 1, 2005

  • SME
    Three-Dimensional Cfd Modeling Of Purging From Refuge Chamber

    The MINER Act of 2006 mandated that all underground coal mines must install and maintain refuge chambers. Refuge chambers serve as a temporary shelter in case of emergency. Several factors affect the

    Feb 27, 2013

  • SME
    A Next Generation Mining Machine Guidance and Control System

    By Janet A. Flinn, David G. Fileccia

    Machine guidance and control systems have become more pervasive in the mining industry in recent years but not always from mining-experienced providers. Dozers, motor graders, scrapers, excavators, sh

    Jan 1, 2006

  • SME
    Congressional Makeup Could Help U.S. Mining

    By Steve Kral

    Improved metals and other commodity prices have caused the mining industry to open new mines, re-evaluate development opportunities at potential mines and increase production at existing ones. This s

    Jan 1, 2005

  • SME
    Problems with determining oxygen deficiencies for use in ratios used for assessing spontaneous combustion activity

    Several common ratios used for determining spontaneous combustion activity rely on comparing the amount of various products of oxidation with the amount of oxygen consumed to produce these products. A

    Jan 1, 2009

  • SME
    Selection, Design And Construction Of A Retaining Structure To Support The Primary Crusher Relocation Project At Round Mountain Mine - Preprint 09-022

    By O. MacIntosh

    The Round Mountain gold mine, located 90 km (55 miles) north of Tonopah, Nevada began large-scale production in 1977. During 2008 Round Mountain Gold Corporation (RMGC) relocated the primary crusher

    Jan 1, 2009

  • SME
    Mining Phospates in Yunnan - Potential is Great, But So Are Problems

    Recent accelerated exploration efforts in southwest China have progressively quantified the vast phosphate resources in the Yunnan Province. To date, according to Chinese geologists, potential reserve

    Jan 3, 1980