Construction Control Instrumentation Used During Tunnel EnlargementBy Raymond P. Miller, David L. Monson, Robert A. Robinson
A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p
Jan 1, 1976
-
The Effect Of Rock Type And Tunneling Machine On Bulk Material Handling ParametersBy Donald E. Raab, Lee W. Saperstein
INTRODUCTION The Premise Not much time has to be spent in a tunneling project to realize the tremendous interdependence that exists among the various unit operations. The research that is to be
Jan 1, 1974
-
The Río Agrio Basin, Argentina: A Natural Analog To Watersheds Affected By Acid Mine DrainageThe Río Agrio of northern Patagonia, Argentina, is highly acidic due to inputs of volcanic gases (SO2, HCl, HF) in its headwaters. The watershed includes a hyper-acidic (pH <0.5) volcanic crater lake,
Jan 1, 2008
-
Investigation of the Rockburst Mechanism of Driving Roadways in Close-Distance Coal Seam Mining Using Numerical - Mining, Metallurgy & Exploration (2021) Modeling MethodBy Stanisław Prusek, CHONG WEI, Huawei Xu, Jun Wang, Andrzej Walentek, Artur Dyczko, Derek B. Apel
The excavation-induced stresses transferred from the panels or pillars in upper coal seams play a key role in the occurrence of rockbursts in driving roadways during close-distance coal seam mining, w
Aug 26, 2021
-
Optimization of ventilation and cooling systems at Sunshine mine's Kellogg operationBy R. S. Jurani
Sunshine Mining Co.'s Kellogg operation is the primary silver producer in the US. Maintaining a comfortable working environment in this deep underground mine historically has been a complex and c
Jan 1, 1988
-
The Ivar Project - An Uncommon, Everyday TBM TunnelBy Yngve Jordal, Sverker Hartwig
The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr
Jan 1, 1991
-
Liberation-Limited Grade/Recovery Curves From X-Ray Micro Ct Analysis Of Feed Material For The Evaluation Of Separation Efficiency - Preprint 09-025By J. D. Miller
Characterization of feed material with respect to expected concentrate grade and recovery is fundamental to the design of improved separation efficiencies and to achieve sustainable development in the
Jan 1, 2009
-
Moving Forward on New York’s Second Avenue SubwayBy David Caiden, Geoffrey Fosbrook, Jaidev Sankar, Donald Phillips, Jon Hurt, Anil Parikh
This paper will cover the progress being made on Phase 1 of New York’s Second Avenue Subway line. It will include a description of construction progress on the first contract to be let, which consists
Jan 1, 2007
-
Are Estimators Getting It Right? Comparing Actual And Estimated CostsBy J. Leinart
As is readily apparent, the reliability of the early-stage costs estimated for any mining project are critical to the viability of that project. An estimate too high might leave a potentially profitab
Feb 27, 2013
-
Holistic planning and approval of sustainable lignite mining and utilizationBy L. Kulik, J. den Drijver
Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n
Jan 1, 2011
-
The Expansion Of Tarkwa CIL Plant From 4.2mtpa To 12mtpaBy E. Barnard
Tarkwa Gold Mine is located in south western Ghana, and is majority owned and operated by Gold Fields Ghana Limited. The Tarkwa CIL plant utilises a single low aspect 27' x 42' 14MW dual pin
Jan 1, 2008
-
Autogenous Grinding And Concentration Of A Michigan Native Copper OreBy Constance F. Acton
Based on laboratory structure analyses, a pilot plant investigation was undertaken to evaluate a Michigan conglomerate native copper ore. Comminution or sized feed was accomplished using wet, closed c
Jan 1, 1977
-
How to Size Smooth Roll CrushersBy Adam Zanker
Smooth roll crushers are widely used as secondary crushers, operating most effectively when set for size reductions in a ratio between 3 or 4 to I. The feed supplied to these units varies from 13 to
Jan 6, 1980
-
Solid Cast Polymer Tunnel Segments: The Corrosion Resistant Solution for Sanitary Sewer TunnelsBy Richard A. Cubeta
Precast concrete segments have been used in sanitary sewer tunnel design for decades. Federal mandates (reduction in heavy metals and I & I), and system design changes (increased retention times) and
Jan 1, 2008
-
Satellite Remote Sensing-Based Estimates Of Biomass Production On Reclaimed Coal MinesRemote sensing methods have been used to evaluate vegetative growth patterns for many applications, though relatively little work has focused on tracking mine reclamation progress. For coal mines in C
Feb 27, 2013
-
Estimation Of Capital And Operation Costs Of Backhoe LoadersBy B. Oraee
Accurate estimation of equipment costs is a key factor in feasibility study and evaluation of design alternatives of mining projects. In this paper, capital and operation costs of backhoe loaders are
Jan 1, 2011
-
Technical Note - Subsidence and timeBy C. D. Elifrits, N. B. Aughenbaugh
Introduction Federal and state laws enacted to regulate coal mining and the accompanying public concern about the adverse effects that mining might have on land use have focused much attention on t
Jan 8, 1986
-
Utilization Of Spent Potliners As A FluidizerBy S. Shrivastava, R. G. Reddy
Spent potliner is generated in the electrolytic process of reducing alumina to make aluminum metal using molten fluoride electrolytes. Spent potliner (SPL), obtained at the end of the pots life contai
Jan 1, 1999
-
Assessing Small Underground Coal Mines For High Safety-Related RiskBy H. Kinilakodi
In 2008, the authors developed a methodology for assessing underground coal mines for high risk for major-hazard events. It focused on major hazard-related violations of safety standards associated wi
Jan 1, 2011
-
Site Specific Blasting Model For Mine-To-Mill OptimizationBy K. M. Kim
A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile
Jan 1, 2011