Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Field Validation of Estimated Primary Fragment Size Distributions in a Block Cave MineBy S. Annavarapu
"Fragment size distributions play an important part in the design and planning of block cave mining operations. Though several methods have been proposed for estimating fragment size distributions in
May 1, 2019
-
Application of Rock Mass Classification and Blastability Index for the Improvement of Wall Control: A Hardrock Mining Case StudyBy G. Segaetsho
"Conventional blasting rules of thumb used to develop blast designs are based on parametric ratios, with insufficient consideration of the rock mass factors that influence the achievability of final w
Jan 1, 2018
-
Tap-hole monitoring technologiesBy R. MacRosty, R. Pula, P. Gebski, W. Braun
"This paper provides a progress update on three tapblock monitoring technologies that Hatch has been developing with our clients for non-ferrous smelting furnaces.The Tapblock Diagnostic System (TDS)
Jan 1, 2014
-
Acidic Ferric Sulfate Leaching of Primary Copper Sulfides Under Recycle Solution Conditions Observed in Heap Leaching: Effect of Major SpeciesBy G. P. O’Malley, A. N. Nikoloski
One of the most promising options for extraction of copper from low-grade chalcopyrite ores by heap leaching, however, chalcopyrite is refractory and suffers slow leaching kinetics and poor overall ex
Jan 1, 2023
-
Big data and the IoT platform architecture design for the mining industry APCOM 2021By H. Dudycz, A. Skoczylas, P. Stefaniak, P. Pyda
In the era of Industry 4.0, technologies such as Big Data (BD) and the Internet of Things (IoT) play a key role, especially for multi-site manufacturing companies. In such companies, the challenge is
Sep 1, 2021
-
Open Pit Planning"Chairman: Professor E. P. PFLEIDER Rapporteur: Mr P. R. JANISCHPapers:Optimum design of an open pit by D. A. PhillipsAn open pit design system for stratiform ore bodies by L. A. J. Pronk van Hoogevee
Jan 1, 2014
-
Book News1. Book reviews Mill Operators' Conference. Parkville (Australia), Australasian Institute of Mining and Metallurgy, 1982. 425 pp. Reviewer: B. K. Loveday Off highway truck haulage. Newman Combine
Jan 1, 1983
-
Annual Report and AccountsCouncil and Standing Committees, 1975-1976 President: Dr R. E. Robinson. Vice-Presidents: Dr M. D. G. Salamon and P. A. von Wielligh. Honorary Treasurer: J. K. E. Douglas. Immediate Past President:
Jan 10, 1976
-
O.F.S. BranchO.F.S. Branch Proceedings of the Annual General Meeting on Wednesday, 30th July, 1975 The Aromal General Meeting of the Branch was held at the St. Helena Club on Wednesday, 30th July, 1975 at 7.45 p.m
Jan 10, 1975
-
Annual General Meeting of the InstituteThe Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House, Johannesburg, on Wednesday, 27th August, 1975. Professor R. P. Plewman (President) was in
Jan 10, 1975
-
Annual General Meeting of the InstituteThe Annual General Meeting of the Institute was held in Kelvin House, Johannesburg, on Wednesday, 22nd August, 1973. Dr J. P. Hugo (President) was in the Chair. There were also present 64 Fellows,
Jan 10, 1973
-
General Meeting and ColloquimA General Meeting and Colloquium was held in Kelvin House, Johannesburg on Wednesday 29th September, 1971. The theme of the Colloquium was "The Ferro-alloy Industry". Prof D. D. Howat (President
-
Annual Report and Accounts for the Year Ended 30th June, 1970Your Council has pleasure in submitting its report for the year ended 30th June, 1970. COUNCIL The following served as Office Bearers during the year under review: Messrs J. K. E. Douglas (Pres
-
Annual General Meeting of the Institute (1972)The Annual General Meeting of the Institute was held in Kelvin House, Johannesburg, on Wednesday, 30th August, 1972. Professor D. D. Howat (President) was in the chair. There were also present sixt
-
Keynote Address: Sampling mineral commodities?the good, the bad and the uglyA wide range of drill holes and process streams are sampled for resource estimation, grade control and contractual purposes in the minerals industry. However, despite the availability of training cour
Jan 1, 2009
-
Monitoring, repair, and safety practices for electric furnace matte tappingBy L. Thomson
"The smelter at Sudbury Integrated Nickel Operations, located in Sudbury, Ontario, operates a single electric AC furnace. This furnace treats nickel sulphide concentrates produced by Glencore and thir
Jan 1, 2014
-
A Hard Rock Narrow Reef Mining Machine - ARM 1100By K. A. Moxham
The ARM 1100 was described in a paper presented at the 6th International Symposium on Mine Mechanization and Automation in September 2001. It started operation underground at Rowland Shaft in early 20
Jan 1, 2004
-
An Open Pit Design ModelBy N. B. Prenn, R. H. Robinson
"The model described is a design and economic planning tool for analyzing surface mineral deposits. Mineralization, topography, costs and significant geologic features are input to the model. The resu
Jan 1, 2014
-
Sustainability Of Innovative Management Practices Of Geotechnical Risk At Damang Pit Cut Back (Dpcb) ? A Case Study At Gold Fields Ghana, Damang MineBy E. Dadzie
This paper will review some methods used to manage geotechnical risk at Damang Pit Cutback. The pit depth is designed up to 250m with push back on the eastern and western walls of the existed and depl
Jan 1, 2008
-
Comparing different methods of sampling to estimate the mineral resource in the Elizabeth Bay aeolian diamond placerBy J. U. Burger
The Elizabeth Bay aeolian deposit in Namibia comprises a sedimentary package of diamondiferous grits that have been deposited, reworked and concentrated to various degrees by dominant southerly winds.
Jan 1, 2009