Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • ISEE
    Fueling Station and Tank Farm Expansion on Taboguilla Island

    By Abraham Lindo

    Taboguilla is a small island located 10 miles outside the Panama Canal Pacific Entrance. In 2002 a fuel distribution facility was installed in order to supply fuel to vessels passing thru the canal. T

    Jan 1, 2011

  • ISEE
    Vertical Retreat Mining of Drop Shafts Saves Time and Money on Atlanta’s West End CSO Tunnel Project

    By Adam Stremcha, John MacGregor

    Initial planning called for 3 separate drop shafts and 3 separate vent shafts to be pulled back from the excavated tunnel with a large diameter raise bore machine. With time constraints and the raise

    Jan 1, 2010

  • ISEE
    Full-Scale Trials Involving the Open Detonation of Large Bombs Close to Structures.

    By Ambrose Buchanan, Rob Farnfield, Charles Adcock

    Beginning on 7th September 1940 the City of London was subjected to 57 consecutive days of bombing in what became known as the ‘London Blitz’. To commemorate the 70th anniversary of this event a telev

    Jan 1, 2011

  • ISEE
    Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo Mine

    By John Vynne

    BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys

    Jan 1, 2007

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar

    Jan 21, 2025

  • ISEE
    Effects of Mid-Field Surface Blasts on a Tall Scaled Target

    By Ethan Steward, Kyle Perry

    Blast resistant structural design continues to be a research area of major concern for governments around the world due to explosive threats from both state and non-state actors. Glass and aluminum cu

    Jan 21, 2025

  • ISEE
    Fewer Surprises When You Measure the Sizes

    By Tom C. Palangio

    Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co

    Jan 1, 2016

  • ISEE
    Underground Longhole Blasting near Large-diameter Booster Fans

    By Norm Disley, Kingsley Hortin, Gertjan Bekkers

    As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning

    Jan 1, 2008

  • ISEE
    The Influence of Blast Fragmentation on Loadability in Sublevel Caving

    By Daniel Johansson, Markus Danielsson, Håkan Schunnesson

    In sublevel caving, blasted material flows gravitationally into the drawpoint from above in a periodical manner. This type of flow behavior entails muck pile conditions that are variable along the cou

    Jan 1, 2018

  • ISEE
    Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stability

    By Glenn Tobin

    The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a

    Jan 1, 2012

  • ISEE
    Ore guiding in underground mining using MWD and machine learning

    By J. Sanchidrián, A. Fernández, P. Segarra

    The combination of chemical analysis techniques as XRF and measurement-while-drilling (MWD) technology in underground mining is a novel approach to gather comprehensive on-line information about physi

    Jan 1, 2024

  • ISEE
    A full-field solution to predict vibrations in the presence of a free surface

    By J. A. Sanchidrián, P. Segarra, S. Gómez

    Blasting is a common activity in mining that can cause significant damage in the remaining rock mass. The most commonly used method for predicting vibrations is the Swedish or Holmberg-Persson approac

    Jan 1, 2024

  • ISEE
    A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic Detonation

    By Andrew Wetherelt

    Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra

    Jan 1, 2007

  • ISEE
    Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines

    By Tristan Worsey, Nathan Rouse, Evan Thibaud

    Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl

    Jan 21, 2025

  • ISEE
    Blasting Conditions Couldn't be Worse

    By John Atkinson, Steve Repola

    This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different

    Jan 1, 1993

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • ISEE
    Influence of the Interaction of Open Pit and Underground Mining Blasting

    By Darío Innamorati, Jorge Oliva

    Cerro Vanguardia is a known gold and silver deposit located in the province of Santa Cruz, Argentina. The mine has been in operation since 1998 and is thought to be one of the most important mines in

    Jan 21, 2025

  • ISEE
    A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)

    By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves

    The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t

    Jan 21, 2025

  • ISEE
    Comparison of International Vibration Standards for Quarry Blasting Close-in to a Residential Structure

    By Johan Gjødvad, Catherine Aimone-Martin, Charles Dowding, Mathias Jern

    A residential structure adjacent to a quarry in Ohio was instrumented to record structure motions, resulting wall strains and existing crack displacements in response to close-in blasting within 82 m

    Jan 21, 2025