Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • CIM
    Salt and Gypsum in Alberta

    By J. A. Allan

    The utilization of natural deposits of salt is one of the oldest industries in Alberta. In 1820, Sir James Richardson visited Salt river, and in the same year D. W. Harmon states chat "clown Slave riv

    Jan 1, 1929

  • CIM
    Probabilistic practical optimization of production scheduling for multi-element deposits

    Optimizing production scheduling in open pit mines is important for managing cash flows of mining operations. This paper describes a new, probabilistic, mixed integer programming (MIP) formulation whi

    Jan 1, 2006

  • CIM
    Reactions of Cycloaurated Au(III) Compounds with Thiols

    By Yongbao Zhu

    The Ag2O-mediated reactions of cycloaurated compounds with a general formula Au(L)Cl2 (L = bi-dentate C?N ligand) with thiosalicylic acid, N-acetyl cysteine or 1,2-benzenedithiol in DMF proceeds via l

    Oct 1, 2003

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)

    "The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to

    Jan 1, 2007

  • CIM
    The use of a geographic information system for open pit mine development

    By U. Dillon, G. Blackwell

    "Geographic information systems (GIS) provide an efficient means for the recording, manipulation, revision, display and analysis of spatially referenced data. GIS are widely used at the exploration st

    Jan 1, 2003

  • CIM
    Comparative Study on Mechanical Properties of Concrete and Surrounding Rock in Xincheng Gold Mine Shaft Based on Unified Standard

    By X. M. Zhou, T. Wu, He X. N.

    "In order to study the support effect of concrete in the surrounding rock of a metal mine, the concrete and surrounding rock were comparatively studied. Firstly, the general situation of the ultra-kil

    Jan 1, 2019

  • CIM
    CIM Mineral Exploration Best Practice Guidelines

    By CIM Mineral Resource, Mineral Reserve Committee

    The CIM Mineral Exploration Best Practice Guidelines (the Exploration Guidelines) have been prepared to assist professional geoscientists and engineers to conduct consistently high-quality work in ord

    Nov 23, 2018

  • CIM
    Electromagnetic testing of wire ropes — New developments

    By K. Leung, J. E. Udd, L. B. Geller, F. Kitzinger

    "Sixteen miners died tragically at the Paymaster gold mine in Timmins, Ontario, in February 1945 when a badly corroded hoist rope broke. The investigation of the Royal Commission that followed arrived

    Jan 1, 2003

  • CIM
    Dragline monitoring, control, and navigation

    By J. Hansen

    "ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti

    Jan 1, 2000

  • CIM
    The Intec Zinc Process

    By J. Moyes

    The Intec Process is a generic process for the production of pure base metals and precious metals from sulphides concentrates derived from copper, nickel, zinc and lead ores. The development program f

    May 1, 2002

  • CIM
    Canadian Clean Power Coalition Project: The evaluation of options for CO2 extraction from existing and new coal-fired power plants

    By D. du Plessis, R. Stobbs

    The Canadian Clean Power Coalition (CCPC) was created in 2001 to protect and enhance Canada’s vast coal and other carbon-based resource wealth, and to ensure that environmental public policy decisions

    Jan 1, 2006

  • CIM
    Forecasting Potential Slope Failure in Open Pit Mines -Contingency Planning and Remediation

    By Nick D. Rose

    Outline ?Background ?History of inverse-velocity for failure prediction ?Methodolog ?Case Histories ?Three case examples of predicted slopefailure to actual date of occurrence ?One case example

    May 1, 2006

  • CIM
    Simulation of Large Displacements in Jointed Rock Masses by using a 3-D Block-Spring Model

    By Guangyuan Li

    A 3-D block-spring model (BSM) has been developed for simulating the behaviour of jointed rocks. The model uses a discontinuous formulation and an iterative procedure to solve the large displacements

    May 1, 2001

  • CIM
    Experience with a Lamella Thickener at the Beaverlodge Operation of Eldorado Nuclear Limited

    By R. Bruce Ferguson

    "IntroductionThe Beaverlodge Operation of Eldorado Nuclear Limited is a uranium property located near the north shore of Lake Athabasca about 7 miles from Uranium City, Saskatchewan.The mill is a 2000

    Jan 1, 1975

  • CIM
    Iron Ore Symposium

    By Jean G. Fortin

    The manufacturers' proposed technology has been a key factor in selecting production, mobile and fixed equipment in order to achieve the targets set in our 2026 mining plan. This paper will pres

    May 1, 2007

  • CIM
    Lifter Design Using a DOE Approach with a DEM Charge Motion Model

    By Ian Orford, Peter Radziszewski, Lud Strah

    "An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The AG mill was subsequently converted to SAG operation in May 1999 for a number of reasons. The mill ha

    Jan 1, 2003

  • CIM
    Oil Sands Projects In Alberta; a Survey

    By David W. H. Ellis

    This presentation will discuss over 2 dozen past, present and future oils sands projects in Alberta. The very early projects as well as the most recent along with the ones that never got off the groun

    May 1, 2004

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007