Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Precise, Reliable, and Fully Automatic Real Time Monitoring System for Steep Embankments

    By Rick Wilkins

    The stability of steep embankments is a major safety issue in open pit mining, highway passes, and earth filled dams. A failure in any one of these situations could mean a loss of very expensive equip

    May 1, 2002

  • CIM
    Water Recovery via Natural Freeze-Thaw

    By E. Shum, V. G. Papangelakis

    "Attempts to reduce the energy requirements of water recovery in the process industries have resulted in the development of techniques to freeze and purify aqueous solutions that take advantage of loc

    Jan 1, 2017

  • CIM
    Novel Processes for Treatment of Syncrude Fine Transition and Marine Ore Tailings

    By X. S. Yuan

    With the production increase of Oil Sand in Fort McMurray Alberta, more efficient tailings disposal has become a priority for Syncrude Canada Ltd. A lot of work on tailings research and development ha

    Jan 1, 2006

  • CIM
    Effect of environmental variables on pitting corrosion

    By S. Rajeswari, D. Gopi

    "Pitting corrosion inhibition of 304 stainless steel (SS) in groundwater with a ternary inhibitor mixture (phosphonic acid + bivalent cation + various surfactants) was studied with different environme

    Jan 1, 2003

  • CIM
    Mineralogical and Microstructural Investigation of Dead-Burned Magnesite from Eastern Iran

    By Khosrow Ebrahimi

    We document the occurrence, mineralogy and firing properties of magnesite from hydrothermal deposits in the upper Cretaceous ophiolites of Eastern Iran. These deposits occur as thin veins of nearly pu

    May 1, 2004

  • CIM
    Study of Sphalerite Depression during Selective Flotation of Refractory Copper Zinc Ores

    By D. M. Wyslouzil

    "This paper was prepared for presentation at the 16th Canadian Mineral Processor's Annual Meeting, Ottawa, Ontario, Jan. 17 to Jan. 19, 1984.This paper gives an account of the development of treatment

    Jan 1, 1984

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991

  • CIM
    Electrical and environmental protection of high- and low-voltage mine cables

    By R. W. Mei, R. A. Strombom, D. J. Moore

    "Heat-shrinkable cable accessories are solving problems in the mining industry. This paper describes a range of products used by the industry, including low-voltage splices, high-voltage splices to 8.

    Jan 1, 1980

  • CIM
    Diverse occurrences of galena-cemented sandstones in the Paleozoic, northern Appalachians, Quebec

    By K. Schrijver, G. Beaudoin

    "Four occurrences of galena-cemented sandstones, exposed in the Lower St. Lawrence - Gaspésie area, are described. They constitute a new, insufficiently explored type of deposit in Quebec.One minerali

    Jan 1, 1987

  • CIM
    Slurry Pump and Pipeline Performance Testing at the Georgia Iron Works Hydraulic Laboratory

    By G. R. Addie

    "In February, 1975, the President of Georgia Iron Works Company, Mr. Tom Hagler decided to build a new hydraulic laboratory to water performance test all of the companies' centrifugal slurry pumps.Equ

    Jan 1, 1980

  • CIM
    Escondida – Phase IV Grinding Circuit

    By Walter S. Bergholz, Michael L. Schreder

    "Since Escondida began operations in fiscal 1991, a series of aggressive expansion projects have enabled market share to be increased and ever larger profits to be realized. This was possible due to t

    Jan 1, 2004

  • CIM
    Implementation of Paste Backfill at the Williams Mine

    By Eric Konigsmann, Doug Spence, Scott Jones

    "The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope

    Jan 1, 2004

  • CIM
    Tuluwaka Mine – From Greenfield to Production in 14 Months

    By Ross Nairn

    "Tulawaka Mine is a joint venture between Pangea Minerals Limited 70% (a wholly-owned subsidiary of Barrick Gold Corporation) and Northern Mining 30%. Tulawaka Mine is located in North West of Tanzani

    Jan 1, 2006

  • CIM
    The use of Aircraft in Mineral Exploration and Development

    By G. C. Mackenzie

    At the last Annual Meeting of the Institute, Dr. C. V. Corless sketched the potential mineral wealth of Canada so clearly, graphically and with-all so entertainingly that one's imagination was fi

    Jan 1, 1924

  • CIM
    A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore

    "This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs

    Jan 1, 1989

  • CIM
    DynoMiner? APS Gassing Trials Stillwater East Boulder Mine

    DynoMiner APS Delivery Systems Overview ? New Design of DynoMiner APS-M2 ? Stand alone or attach to Cargo type 10,000 lb (4536 kg) emulsion bins. ? Hose reel w/200-ft (61-m) by 1-inch I.D (25-mm)

    May 1, 2004

  • CIM
    Automation for Improved Safety in Roadside Construction

    By S. Bergquist

    In this paper, it is investigated how different types of automation would affect the safety for workers in asphalt paving. The risk for the workers on road construction sites is consistently high in c

    Aug 1, 2013

  • CIM
    OMC Power-Based Comminution Calculations for Design, Modelling and Circuit Optimization

    By P. Scinto, A. Festa

    "Orway Mineral Consultants Ltd (OMC) as a consultancy has specialized in comminution circuit design for over 30 years. The OMC Power Model is OMC’s in-house software for specific grinding energy power

    Jan 1, 2015

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002

  • CIM
    Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air Purification

    By Hiroaki Sakurai

    Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p

    Oct 1, 2003