Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Techno-Economic Assessment of the Coal Gold Agglomeration Gold Recovery Process

    By I. G. Townsend, S. A. Buckley, C. I. House

    "SummaryBritish Petroleum plc is developing a new gold recovery process known as coal gold agglomeration (CGA) for the recovery of gold from its ores. Liberated gold grains are recovered with high eff

    Jan 1, 1989

  • CIM
    Maximisation des revenus et du rendement financier par l’optimisation de I’information, de la planification et des pratiques minières*

    By M. Vallée

    "RÉSUMÉDurant les 10 dernières années, les améliorations dans le contrôle des limites des sautages et les arpentages après l’exploitation ont fourni des informations préalables et post facto sur les l

    Jan 1, 2005

  • CIM
    Flotation Feed Size Distribution

    By Claude Bazin

    "Laboratory semi-batch flotation tests were conducted using two different sulphide ore samples. The size reduction was adjusted to cover a wide range of flotation feed size distributions. Results show

    Jan 1, 2006

  • CIM
    25 Years of Base Metal Processing

    By H. P. Jacobi

    "The last 25 years have seen tremendous economic pressure placed upon the base metal processor. Industry has responded with technological innovations that have contributed to significant reductions in

    Jan 1, 1987

  • CIM
    Effective Methods of Arsenic Removal from Gold Mine Wastes

    By J. Lee, R. G. Rosehart

    "The basic problem of arsenic contamination from mine water is discussed. Effective methods of removal involving chemical precipitation, activated carbon adsorption, ion exchange and reverse osmosis a

    Jan 1, 1972

  • CIM
    Non-Explosive Continuous Mining Methods Being Developed By CSIR: Miningtek

    By R. Patrick

    As a unique South African organisation, CSIR: Division of Mining Technology (Miningtek) strives to support the mining industry by improving health, safety and productivity through developing, adapting

    Oct 1, 2001

  • CIM
    Island Mountain Mine

    By P. C. Benedict

    "The Island Mountain mine is at the southeast end of Island mountain; across Jack of Clubs lake from the Cariboo Gold Quartz mine.; The orebodies consist of quartz veins and pyritic replacement deposi

    Jan 1, 1954

  • CIM
    Computer Control of Flotation at Mattagami Lake Mines

    By D. W. Hendriks, C. Daoust, K. V. Konigsmann

    "The concentrator of Mattagami Lake Mines Limited commenced operation in 1963. It had been designed with instrumentation proven at that time. New control techniques were added in subsequent years.An o

    Jan 1, 1976

  • CIM
    Process Improvements at Bell Creek Mill

    By F. Flynn, P. Downey, G. Ritson

    "Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git

    Jan 1, 1997

  • CIM
    Advances in the Use of Thin, Spray-on Liner Systems

    By James F. Archibald

    In historic mining practice, typical thin liner support systems have been considered to comprise non-reinforced or mesh-reinforced shocrete linings. In the early 1990?s, development of alternate forms

    May 1, 2002

  • CIM
    Lake Sediment: A Medium for Regional Geochemical Exploration of the Canadian Shield

    By R. J. Allan

    "CANADA HAS A GREATER LAKE AREA than any other country. Discountin the Great Lakes, this fresh-water area, mainly in the Canadian Shield, is listed as approximately 300,000 sq. mi. Densities of lakes

    Jan 1, 1971

  • CIM
    Gold Gravity Recovery in Copper Circuits at BHP Tintaya

    By Valentin Choquenaha Bombilla, Oscar Alvarez Muiloz

    "Tintaya’s basic production line is copper concentrate, which has an important gold content. The process used is flotation; the objective of the metallurgical department is to obtain the best results

    Jan 1, 2002

  • CIM
    Evaluation of Grinding Media Shape, Mill Speed, Feed Density and Temperature in a Pilot Plant Ball Mill

    By Paul Staples, Fred Woodcock, Robert Grant, Mike Cooper

    "Noranda's Brunswick Mining Division, near Bathurst, New Brunswick, processes 10,500 TPD of complex Cu-Pb-Zn bearing ore. Brunswick uses conventional rod and ball milling techniques to achieve a flota

    Jan 1, 1997

  • CIM
    Development of a Metallurgical Flow Sheet for the Songwe Hill Rare Earth Project in Malawi

    By M. Bryson, A. E. Brady, W. Dawes, G. Beer, N. Sehlotho

    Mkango Resources Limited is developing the Songwe Hill Rare Earth Element Project in southeast Malawi. Since being awarded the exclusive exploration licence for the project in January 2010, Mkango has

    Jan 1, 2014

  • CIM
    Lamella Thickener Performance in Potash Refining (eda27180-f1f6-4ab3-854e-c986b2a1249d)

    By Douglas M. Smith, G. A. Maki

    "The initial development of the massive potash deposits of the prairie evaporite formation took place over a decade ending in 1970. The potash mining and refining facility near Rocanvi11e, Saskatchewa

    Jan 1, 1983

  • CIM
    UNIFLOT SP129 - Copper Sulphide Collector

    By S. Auger, S. McDonald, K. Ward

    "This preliminary paper provides a summary of lab and mill flotation investigations into the copper collector at two Canadian operations. The orebodies illustrated in these studies both contain mainly

    Jan 1, 1992

  • CIM
    Slurry Rheology and Grinding

    By Alain Langlais, Caroline Boudrias Chapleau, Claude Bazin, Ahmed Bouajila

    "Slurry «viscosity» has been recognised for several decades as a variable that significantly influences the operation of grinding mills. This paper describes an instrument that can be used in a labora

    Jan 1, 2003

  • CIM
    Reduction of Free Gold Losses in the Cleaner Circuit with the Installation of a Gravity Circuit at the Kemess Mine

    By Martin Froehling, Curtis Mohns, Rahim Rajwani, Michael Fullam

    "The Kemess mining and milling complex is operated by Northgate Minerals Corporation and is located in the mountains of north-central British Columbia, 430 kilometers northwest of Prince George. The c

    Jan 1, 2007

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    Grinding Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of an SABC grinding circuit using CEET technology applied to grindability data produced from testing 100 samples and distributed across the blocks of a mine plan using

    Jan 1, 2007