Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dewatering and Depressurization of a Multi-Aquifer Groundwater System at Loy Yang Open Cut, Victoria, Australia

    By Gibson I, Somerville J

    Three main confined aquifers occur in interseam sediments beneath the planned excavation for the Loy Yang Brown Coal Open Cut. Sub-artesian groundwater pressures occur in all aquifers necessitating

    Jan 1, 1988

  • AUSIMM
    Internet-Based Remote Machinery Control

    By W R. Hancock

    Control of complex machinery through the internet is investigated through the construction of a vehicle prototype developed using off-the- shelf hardware. The vehicle was able to be controlled remotel

    Jan 1, 2008

  • AUSIMM
    The Ore Deposits of the South-East Missouri Cobalt-Copper-Lead-Zinc District û Mineralogy, Ore Textures, Applied Mineralogy and Ore Controls

    The south-east Missouri cobalt-copper-lead-zinc district is the worldÆs largest lead producer and a significant producer of by-product zinc, copper, cobalt, silver and cadmium. Current production in t

    Jan 1, 2008

  • AUSIMM
    Mining Equipment Automation

    By Daziel M, Corke P

    Unit cycles in mining have not changed for many years. Productivity increases over the past three decades have mainly been achieved by using larger and heavier machines. This investment in size has

    Jan 1, 1997

  • AUSIMM
    Gas Properties of Australian Coal

    By Hargraves A. J

    At 4 MPa gas pres ure and 30°C the sorptive capacity of 10 selected Australian dried coal ranges from 17 to 23 m3/tonne of CH4 and 27 to 36 m3/tonne of CO2. Values for moist coals are about 25 pe

    Jan 1, 1985

  • AUSIMM
    Why do Shareholders and Mining Executives Allow Mine Managers to Leave Behind High-Grade Broken Ore Underground?

    By K Biegaj

    The paper describes challenges the author has encountered on Australian underground gold and nickel mines over the last eight years, when recovering high-grade gold/nickel bearing mine floor material

    Mar 26, 2012

  • AUSIMM
    A Review of the Stratigraphy of the Singleton Coal Measures and its Significance to Coal Geology and Mining in the Hunter Valley Region of New South Wales

    The stratigraphy of the Singleton Coal Measures is reviewed and a revised stratigrapixy which has been ratified by the N.S.W. Standing Committee for Coalfield geology is nominated and defined by a

    Jan 1, 1972

  • AUSIMM
    Cemented Rock Fill for Extraction of High-Grade Crown Pillars at Crusader Gold Mine

    By M Dorricott

    This paper describes the design, construction and performance of sill pillars using cemented development mullock at the Crusader Gold Mine. The orebody is some 35 m - 60 m in length, 5 m - 8 m wide, d

    Jan 1, 2002

  • AUSIMM
    Origin of Sedimentary Rock-Hosted Gold Mineralisation at Kyaukpahto, Kawlin-Wuntho District, Northern Myanmar

    The Kyaukpahto gold deposit is located at latitude 23¦ 47Æ 55" N and longitude 95¦ 56Æ 35" E in the Kawlin-Wuntho district, Sagaing Division, Myanmar. Gold mineralisation is hosted in sandstone of the

    Jan 1, 2008

  • AUSIMM
    Development in Elevated Temperature Ground of the 500 Orebody Mount Isa Mines

    By T Davis

    The 500 orebody in the upper levels of Mt Isa Mines in north-west Queensland was mined by sublevel caving and block caving from 1962 to 1969. The hot and reactive rock mass of this orebody provided si

    Jan 1, 2008

  • AUSIMM
    Staff Development and Training at Geita Gold Mine, Tanzania

    By C Kusi-Manu, E Nyamusika

    Geita Gold Mining Limited (GGML) is owned and jointly managed by Ashanti Goldfields Company (Ghana) and Anglogold (South Africa). The mine is currently one of the largest gold producing open pit opera

    Jan 1, 2003

  • AUSIMM
    Examples of Coal Dust Explosions

    It is difficult with inadvertent explosions to establish fundamental data, especially of original dust, of pressure, temperature etc. and of ventilation oscillations, as exposed personnel rarely su

    Jan 1, 1981

  • AUSIMM
    Coal Mine Modernisation and Production Reliability in China

    By Jiang G

    The Chinese Central Government attaches great importance to the development of its coal industry. Besides carrying out the policy of simultaneous development of large, medium and small coalmines,the m

    Jan 1, 1991

  • AUSIMM
    The Seismic Monitoring Decision at Mt Charlotte Gold Mine

    By Poplawski R. F

    A 32-channel PSS seismic monitoring system was commissioned at Mt Charlotte mine in 1994, and at the time it was the first such system in Australian mines. The system continuously observes the occur

    Jan 1, 1995

  • AUSIMM
    Damage to Open Pit Slopes

    There is considerable economic incentive to increase the angle of open pit walls so as to reduce the total volume of waste to be moved to gain access to an orebody. However, a number of slope failures

    Jan 1, 1992

  • AUSIMM
    Non-magmatic versus Magmatic Fluids in the Genesis of Archean and Palaeoproterozoic Iron Oxide-copper-gold Systems of the Carajás Mineral Province (Brazil)

    By E S. B Santiago, C P. N Moreto, L V. S Monteiro, G H. C Melo, R P. Xavier

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Iron oxide-copper-gold (IOCG) systems of the Carajás mineral province (Amazon craton, Brazi

    Mar 18, 2015

  • AUSIMM
    Developments in Australian Spiral Separator Technology

    By Stitt P. H

    This paper provides a brief historical review of the invention of the spiral separator and its adoption into Australian metallurgical practice. The purpose of the review is to demonstrate that spira

    Jan 1, 1988

  • AUSIMM
    Gaseous Desulphurization from Hot Metallurgical Slags

    By Kokubu H, Moro-Oka A

    Gaseous desulphurization from hot metal- lurgical slags containing sulphur mainly as sulphide and(or) sulphate was measured under `low at four different oxygen pressures. The total gas rate was fro

    Jan 1, 1980

  • AUSIMM
    The Murrin Murrin Nickel Cobalt Project

    By Fazakerley VW

    The Murrin Murrin deposit is located about 210 km NNE of Kalgoorlie and 50 km E of Leonora in the North Eastern Goldfields region of Western Australia at latitude 28¦ 50'S. longitude 121¦ 54&a

    Jan 1, 1996

  • AUSIMM
    Gold and Silver Leaching from an Oxidized Gold Ore with Thiourea under Controlled Conditions

    By Woodcock JT, La Broody SR

    As part of a project on the application of thiourea leaching to a variety of Australian ores, the systematic variation of pH, redox po- tential, and thiourea concentration were in- vestigated on an

    Jan 1, 1984