Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Gold Silver Mineralization At Newvesville, Coromandel Peninsula, N.Z.By Torckler L, Brathwaite R. L
At Neavesville gold-silver (electrum) mineralization occurs in steeply-dipping zones of intense fracturing, brecciation and quartz veining within rhyolitic pyroclastics, carbohaceous shales and an
Jan 1, 1980
-
Strategic Development of the Stage 5 Pit at KidstonThe originally estimated mine life at Kidston (starting 1984) was 12 years. Through a continuing process of re-evaluation and improvement in the operation and by expanding the geological knowledge i
Jan 1, 1994
-
Improving Coal Mining Production Performance Through the Application of Total Production MangementThis paper describes the application of the Total Productive Management (TPM) technique as a performance improvement initiative for a coal mining operation. It discusses the objectives of TPM, with th
Jan 1, 1998
-
Characterisation of Micrinite in the Late Triassic Callide Coal MeasureBy Mackinnon I. D R, Glikson M
Samples from the Callide Coal Measures, Queensland, Australia, containing the minor maceral, micrinite, have been studied using optical and electron-optical techniques to determine the precise comp
Jan 1, 1991
-
A Model-Based Methodology for Steady State and Dynamic Optimisation of Autogenous and Semiautogenous Grinding MillsBy Lo YC, Pate WT
In recent years there has been a great deal of interest in ways to optimise the performance of mineral processing plants. This paper describes a methodology developed for optimisation of autogenous
Jan 1, 1993
-
Pemali Open Pit Mine Slope Stability ProblemBy Bhattacharyya A. K>
The Pemali Open Pit Mine is situated in a small island called Bangka in Indonesia. It produces approximately 165,000 m3/year of tin ore with an average grade of 3.67 kg/m' of tin from a primary
Jan 1, 1989
-
Improving Plant Operations Using Synergistic Solvent Extraction Technology and Organic MonitoringBy K B. Barnard, M D. Urbani
A synergistic solvent extraction (SX) system for nickel and cobalt recovery using Versatic 10 and decyl-4-pyridinecarboxylate was tested with BHP Billiton pilot plant leach solution. Another synergist
Jan 1, 2005
-
Fused Salt Electrolytic Reduction of Solid Oxides and Oxide Mixtures for Green Production of Metals and AlloysBy D J. Fray
In this work, a fused salt electrochemical process was investigated experimentally for production of metals and alloys directly from respective solid oxides by electro-deoxidation. Direct electrochemi
Jan 1, 2006
-
Long Tunnel extended Gold Mine, Walhalla-A Recovery and Rehabilitation ProjectBy Griffiths J. B
From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gippsland Mountains, the Long Tunnel Extended Gold Mining Company produced 13,695 kg of gold, which at 1980 prices
Jan 1, 1981
-
The Discovery and Evaluation of the Vera-Nancy Deposit, North QueenslandBy Jones BH
Discovery of the Vera-Nancy deposit in late-1995 followed 12 years of active exploration in and around the Pajingo Epithermal System, an andesite hosted veinfield covering an area of 150 square kilome
Jan 1, 1997
-
Using Rock Mechanics Classification to Reduce Ground Instability in Amethyst Underground MiningBy Zingano A, Costa J. F
Brazilian amethyst production is mostly obtained from underground mines in the southernmost part of the country, involving approximately 6000 miners and generating an income of US$ 20 million per ye
Jan 1, 1997
-
Application of Newly Developed Shield Tunnelling Machine for Intensive CurveBy Yoshii Y
Many kinds of shield machines are being driven in the soft ground of Tokyo metropolitan area. Tunnel alignments for underground power transmission lines are generally planned to pass under public r
Jan 1, 1987
-
Towards 40,000 Tonnes/Day WorkingsBy Vidalinc, Raffoux
Longwall faces producing in the order of 20,000 tons per day of raw coal are presently running in the Houilleres du Bassin de Lorraine of Charbonnages de France. Production levels of twice that l
Jan 1, 1988
-
Ground Support by Rock Bolting at Mount Isa Mines LimitedRock bolting has become the most important method of ground support at Mount Isa. Various types of rock bolts are used to suit the different applications and requirements. To apply rock bolting tec
Jan 1, 1971
-
An Alternative to the Barrovian Interpretation? Evidence from Stratiform OresRecent work has shown that, in at least some instances of regional metamorphism, metamorphic diffusion has been restricted to such relatively minute distances (of the order of 1.0 mm and much less), t
Jan 1, 1982
-
A New Method to Characterise Black Shales in Pilbara Iron Mining OperationsBy P Mackenzie, S Askraba
Pyritic black shales present several challenges to mining operations due to their reactivity. The risk of predetonation of explosives in blastholes, spontaneous combustion of fractured rock and the ge
Jan 1, 2005
-
Sustainable Use of Bauxite Residue Sand (Red Sand) in ConcreteBy H Nikraz, E Jamieson, D Cooling
The use of red sand as fine aggregate in concrete manufacture has been investigated as well as the use of fly ash as a cement replacement. The experimental work consisted of casting various concrete m
Jan 1, 2006
-
Aquifer Management Issues at Phosphate Hill MineThe aquifer at Phosphate Hill, north-west Queensland, presents special management challenges. The site contains a phosphate rock mine, fertilizer plant and camp. All of the site water is provided by t
Jan 1, 2003
-
Rates of Return and the Cost of Equity Capital to the Mining Industry: An Australian PerspectiveOver the 20 years to 1990 the Australian mining industry, presently worth some $A60 billion, generated a negative real rate of return (McDonald, 1992); not surprisingly under-performing the returns fr
Jan 1, 1993
-
A Review Of Cementing Agents For Hydraulic FillThis paper carries on from an earlier paper 'Cemented fill practice and research at Mount Isa' and reports further on the laboratory programme at Mount Isa to develop a cheap cem- ented fi
Jan 1, 1973