Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recommended Design Methods and Serviceability Limits for Permanent Rock Bolts

    By D J Maconochie

    The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with

    Mar 8, 2011

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • AUSIMM
    Wall control blasting – the influence of engineering geology on blast design

    By T N. Little

    This paper is concerned with the influence of engineering geology on design of Wall Control Blasts. In the Introduction, the Blast Management Framework and the Blast Design Requirements classification

    Jun 22, 2022

  • AUSIMM
    Impacts of thrust faulting at Goonyella Riverside Mine

    By H S. Pescini

    A material aim when feeding ore blends into a processing facility is to reduce the variability of the properties of the feed material and to maximise the output, or throughput. At the Mining Geology c

    Mar 22, 2022

  • AUSIMM
    Applying universal and equitable design principles for equity and inclusion in mining

    By Y Lanwin

    The Australian mining industry, a cornerstone of the nation’s economy, is on a journey towards greater equity and inclusion. Th paper introduces a comprehensive exploration of how universal design pri

    Apr 16, 2024

  • AUSIMM
    Comparison of two quantitative mineral resource classification methods – a case study from a large copper porphyry-skarn deposit

    By C Artica

    Two quantitative methods for Mineral Resource classification have been applied to a copper skarn deposit beneath a large open pit that is mining a world-class porphyry complex. A drill hole spacing st

    May 24, 2023

  • AUSIMM
    Evaporation and Salt Transport Under Variable Climatic Conditions

    By T Baumgartl, B Richards

    The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i

    Jul 10, 2012

  • AUSIMM
    Exploding the Myths ù A Case Study on Land Use Planning and Quarry Buffers

    By M Freeman

    In a visionary move, the Planning Commission and the Ministry for Planning in Western Australia decided to invite three extractive industry quarry operators, local government councils and State Govern

    Jan 1, 2001

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Measurement of Residual Shear Strength Using a Modified Direct Shear Apparatus

    By L Tatnell, R Mackay, A Tolooiyan

    The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is

    Nov 5, 2014

  • AUSIMM
    Theory of Sampling – from missing link to key enabler for process analytical technology

    By R J. Romañach

    The theory of sampling (TOS) is now followed in the development of near infrared (NIR) spectroscopic methods for the pharmaceutical industry. TOS has been the guiding light for a two-step approach for

    May 9, 2017

  • AUSIMM
    Megablasts – Enabling Technologies in BHP Billiton Iron Ore

    By B Green

    With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed

    Aug 24, 2015

  • AUSIMM
    Achieving Sustainable Community Development - Helping Build Appropriate and Resilient Community Governance Structures

    This paper talks about the experiences of groups we have worked with over the last few years in the Asia-Pacific region (Australia, Canada, New Zealand and Papua New Guinea) and the ways that they hav

    Jan 1, 2009

  • AUSIMM
    Modelling and Design of Block Caving at Bingham Canyon

    Open pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi

    Jan 1, 2000

  • AUSIMM
    Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of View

    Sishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to

    Jan 1, 2005

  • AUSIMM
    Geomembranes – from design to handover and some of the lessons learnt

    By A Marta

    Geomembrane (GMB) liners are being used more frequently for the storage or capping of mine waste due to stricter regulatory requirements relating to environmental protection. The longevity of any li

    Jul 23, 2018

  • AUSIMM
    Risk-Based Ore Selection from Conditionally Simulated Block Models

    By J E. Everett, F Grobler

    This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo

    Aug 12, 2013

  • AUSIMM
    Learnings from review of drawpoint management across New South Wales mines

    By X Hill

    Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ

    Oct 16, 2017

  • AUSIMM
    A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine Closure

    By B N. Noller, J C. Ng, S L. Bruce

    Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc

    Jul 16, 2014

  • AUSIMM
    Design of Copper-Cobalt Hydrometallurgical Circuits

    Copper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni

    Jan 1, 2008