Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Managing continuous improvement of Mine to Mill begins with measurement

    By J Loeb, R Ramanathan, H Ingham, P Cameron

    Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd

    Nov 8, 2021

  • AUSIMM
    MEMS – The Mine Event Management System: a process to assist with incident management

    By B Stewart

    It has long been recognised that knowledge of the conditions existing in a mine after an incident is essential in deciding whether to deploy responders as part of the incident recovery process. Applyi

    Apr 16, 2024

  • AUSIMM
    De-bottlenecking Iron Ore Transportation from Mine to Plant

    By T Tan, C P. Holmes, C E. Hartford

    Transportation of iron ore from the mine to the plant is critical to business success. Ore from the mine may have to be transported across states, countries and even continents to get to the processin

    Jul 13, 2015

  • AUSIMM
    Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity Setting

    By B P. Wrench, M J. Gowan, P J. Chapman

    Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat

    Jul 27, 2015

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Fusion of molten phase R&D into the metallurgical industry to drive circularity

    By S L. Nicol, B J. Hogg, O J. Mendoza, S Nikolic, A Burrows

    The top submerged lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. The key advantage the ISASMELT™ TSL technology provided was the ability

    Aug 21, 2024

  • AUSIMM
    Investigation of silica removal by reverse flotation to improve quality of mixture concentrates produced through spiral gravity separation and Slon-VPHGMS process

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    This research was done to reduce silica from mixed hematite concentrate of Barfkar Iron Ore Sample and increase Fe grade using reverse flotation method (Depressing Hematite and floating Silica). The u

    Aug 24, 2022

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    Advancing sustainability in pumping systems – a comprehensive methodology for calculating, monitoring and minimising power and water consumption

    By A Karrech, G M. Hassan, A Varghese, E Lessing, S Martins

    Pumps play a critical role in mining operations, and their energy consumption and environmental impact are significant. This paper addresses the need for a holistic approach to sustainable pump deploy

    Sep 1, 2024

  • AUSIMM
    The Need for Specification Development in Australian Road Tunnels

    By T Brown

    Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty

    Mar 8, 2011

  • AUSIMM
    Operational Management of Underground In-Seam Drilling Sites

    By ZáWang, F Hungerford, T Ren

    Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov

    Jul 1, 2013

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Reflectance Spectroscopy with X-ray Fluorescence for Rapid Online Assaying in a Copper-nickel Flotation Plant

    By A Rantala, J Timperi and J Kaartinen, T Maksimainen, O Haavisto

    "X-ray fluorescence (XRF) is the most common technique used for online slurry assaying in base metal flotation applications. Typically, assays from feed, concentrate and tailings slurries are used to

    Oct 10, 2016

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013

  • AUSIMM
    Pushing the boundaries of slag operability – processing of high-MgO nickel concentrates with the Ausmelt TSL process

    By J Coveney, A Rich, D Grimsey, J Wood, S Creedy

    In 2021, BHP and Metso examined processing of high-MgO nickel sulfide concentrates using Metso’s Ausmelt Top-Submerged-Lance (TSL) technology. Test work was conducted in Metso’s pilot test work facili

    Aug 21, 2024

  • AUSIMM
    How progressive waste rejection should transform your mining business

    By M Pyle, R Ch, T Vizcarra, ramohan, G Lane, G Ballantyne

    Preconcentration, through gravity separation (Wallace et al, 2015), magnetic separation and particle size (Clout, 2013), has been used in many historical projects to convert low grade material into or

    Nov 10, 2020