Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solutionBy B Taylor
Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin
Mar 29, 2023
-
A day in the life of a mineworker in 2045By G McCullough, J Bassan, d P. Knights, C T. Farrelly
By 2045, carbon-neutral mines will be economically producing products that are vital for the world’s transition to renewable energy. After overcoming significant technical challenges (and the investme
Sep 1, 2024
-
Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, IndonesiaBy H Indirawati, R Ayres, A Nur Kasnanto, S Konopa
As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current
Nov 21, 2018
-
Martabe Gold Mine, Indonesia: a positive solution for positive reconciliationBy M Angus, S Konopa, A Virisheff, S Crispin
A positive mill reconciliation at a mine is a double-edged-sword. Much back slapping happens. The bank and the board can’t get enough until the downside becomes apparent. Over a prolonged period, ther
Nov 21, 2018
-
Practical waste rock management at the Roy Hill iron ore mine, Western AustraliaBy J Pearce, B Miles, V de San Miguel
Incorporating industry best practice waste rock management methods can be a relatively straight forward task when preparing management documentation, such as an acid and metalliferous drainage managem
Jul 25, 2018
-
Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?By C Pope, M Tannock
Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m
Jul 13, 2015
-
The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs ViewpointBy J-P Franzidis, M Esvelt, E V. Manla
The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart
Jan 1, 2003
-
An investigation of potential wear occurring on refractory lining and coating formation – a remedy of wear in a basic oxygen steelmaking furnace using CFD modellingBy S Mitra, B J. Monaghan, T Honeyands, G Evans, R Chowdhury, D Scimone
Due to the harsh operating conditions, wearing of the inner refractory lining in a Basic Oxygen Steelmaking (BOS) furnace reduces the useful life of the refractories and incurs a significant cost comp
Jun 19, 2024
-
The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisationBy X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones
Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla
Jun 22, 2022
-
Underground Mine Radio Automation SystemsBy S Munn
Today, it can be said that the majority of mines utilise communications equipment in one form or another. Either for communications between staff making their day-to-day operations more efficient, or
Jan 1, 1999
-
Combining the power of computational thermochemistry with the convenience of Python within the digital platforms of SMS group GmbHBy S Khadhraoui, T Yusuf, C Kirmse, E Hecker, R Degel, A Akouch, N Borowski, M Reuter
For an optimal design and control of metallurgical processes, a deep understanding of the thermodynamics of the governing reactions is required. Modelling the thermochemical behaviour of those reactio
Jun 19, 2024
-
Mine rockfall and rock wall failures – proven digital laser-based approach for monitoring slopes at the Kanmantoo Copper MineBy J Herrmann, J Richards, B Hutchison
An extensive trial of laser-based survey and monitoring systems at Hillgrove Resources Kanmantoo Copper Mine in the Adelaide Hills, South Australia, has proved the capabilities of the system in monito
Nov 30, 2018
-
Modelling Geometallurgical Variability - A Case Study in Managing RiskBy S Khosrowshahi, A Weeks, W J. Shaw
"To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th
Sep 29, 2013
-
Getting it right from the beginning – ESG in mineral explorationBy L H. G McClean
Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from
Sep 1, 2024
-
Successfully Implementing Technology-driven Change in the Mining EnvironmentBy B McCarthy
Mining has been typified of late as a boom and bust, cyclical industry operating against a steady decline in the size and quality of mineral deposits. Decreasing deposit grades and increasing costs of
Jun 22, 2016
-
Synergistic Collaboration of Humans and Automated Systems – Innovative Steps Towards Fully Autonomous and Continuous Mining SystemsBy E Widzyk-Capehart, P Vallejos, R Asenjo, J Ruiz-del-Solar
Throughout the minerals industry, it is evident that a new wave of technological innovation is needed as the mining sector looks for ways to achieve higher security and safety as well as higher produc
Nov 4, 2015
-
Probabilistic Slope Design and its Use in Iron Ore Pit OptimisationsThe current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v
Jan 1, 2009
-
Innovative Tailgate Mobile Goaf Gas Management in Two Gate Road Longwall Panels – Concept to ImplementationBy B Belle
In a deep, gassy predrained coalmine, ventilation and goaf drainage systems act as critical controls to manage longwall (LW) panel return gas levels. The goaf capture efficiency of most LW panels rang
Aug 31, 2015
-
Learning from Simulation at Boddington Gold MineVarious methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity
Sep 26, 2011
-
Rethinking variogram modellingBy A Boucher, M Baudin, P Androszczuk, I Minniakhmetov, A Rigby, P Machado, M Wright, B Van Dijken
IGO Ltd’s (IGO’s) Nova Operation (Nova), which is 160 km east-north-east of the town of Norseman in Western Australia (WA), mines and processes nickel-copper-cobalt (Ni-Cu-Co) sulfide ore from the mag
Mar 22, 2022