Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Indicator kriging saves the day – improving reconciliationBy A Purton, C Taylor, E Conroy
The spatial modelling of geometallurgical domains is an important step in the characterisation of an ore deposit allowing for the quantification of various rock types, their differing rock properties
Mar 22, 2022
-
Application of the Theory of Constraints to Strategic and Tactical Mine PlanningBy T Elkington, A Finch
The theory of constraints (TOC) is a business improvement method that focuses on exploiting a business’s bottleneck to deliver the highest possible profit. Early applications were mostly in the manufa
Nov 24, 2014
-
Three Decades of Gold Production at the Newmont Tanami OperationsBy A Cranley, A Giblett, S Thacker
The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil
Sep 1, 2014
-
Chirano Gold Mine Expansion – A Case StudyBy S Ellis
In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr
Aug 8, 2011
-
Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise designBy C Armstrong, B Wentzinger
Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top
Jul 23, 2018
-
The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical SimulationBy Q Yu, G Ren, Z-Y Chen, J Yang
The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole
Aug 24, 2015
-
Advancements in Condition Monitoring on Mill Drive Trains for Proactive Maintenance and Early Fault Detection PurposesBy T Roesch, M Neurohr, S Stratton
"Dwindling commodity prices are forcing today’s mining operations to increase output. Sometimes the solution is to upgrade the existing infrastructure; however, in most cases it has to be achieved wit
Oct 10, 2016
-
Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional AreaBy A Bagis
Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while
Mar 8, 2011
-
Design of Air-Blast Plugs for a Sublevel Caving OperationThe Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav
Nov 25, 2010
-
Effect of alkaline roasting conditions on the dephosphorisation of high-phosphorus iron oreBy A Batnasan
The main techniques for removing phosphorus as an impurity element in iron ores are physical separation (eg magnetic separation, flotation) and chemical separation (acid leaching, alkaline leaching an
Aug 22, 2022
-
Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore ExplorationBy M Haest, O Dominguez, D Mittrup
With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng
Jul 13, 2015
-
Prediction of Burden at the Sungun Copper Mine by Artificial Neural NetworkBy H Khoshrou, A Siamaki
Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b
Sep 26, 2011
-
Airborne Gravity Gradiometry and Magnetics in the Search for Economic Iron Ore DepositsBy R Miller
The enrichment of magnetite to haematite and haematite-goethite leads to a coincident magnetic low and gravity high within the banded iron formation. Palaeochannel deposits of pisolitic limonite can b
Jul 11, 2011
-
SBRE framework – application to Olympic Dam depositBy D Clarke, I Minniakhmetov
This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi
May 24, 2023
-
Improving Consistency of Delivery at Mt Rawdon OperationBy M Boon, M Franklin
This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2
Jun 22, 2016
-
Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin CoalmineBy A K. Ghosh
"Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an
Nov 15, 2016
-
Blast Design Using Measurement While Drilling ParametersBy M Higgins
Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio
Jan 1, 2001
-
Is the Python Right for Me? PythonGekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr
Aug 1, 2010
-
Redefining Competent Persons Criteria for Resource GeologistsBy J Coombes
There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an
Aug 18, 2014
-
What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage OperationsBy R Thompson, D Tulloch
"Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and
Nov 15, 2016