Simulation Modelling of Grade Variability for Iron Ore Mining, Crushing, Stockpiling and Ship Loading OperationsBy K Jupp, T J. Howard
Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, about 50 km north of the town of Southern Cross. Ore is trucked from three geographical
Jan 1, 2009
-
Development of a Pyrite Regrind Circuit at Telfer Gold MineBy D R. Seaman, Y Peng, F Burns, D J. Bradshaw
Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh
Oct 29, 2012
-
Monorail Technology - A Rapid and Cost-Effective Method of Decline DevelopmentBy B Besa
Australia is a world leader in the design and operation of mines accessed by the decline method. Literature indicates that a number of metalliferous underground mines using the decline system are also
Jan 1, 2008
-
NO2:NOx Ratios in Australian Road TunnelsBy P Gehrke, S O’Gorman
The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire
Sep 17, 2014
-
The Importance of Data Collection to the Blasting ProcessBy J Hutchings
An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat
Nov 8, 2011
-
Maximising the value of a drilling program – case study in a challenging environmentBy A A. Latscha, D O’Connor
Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO
May 24, 2023
-
Development of Robot System for Automatic Assembling of Bolted SegmentsBy Harada M, Katsuta S
In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed
Jan 1, 1987
-
Scoping of Feasibility StudiesHow often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I
Jan 1, 1998
-
Reinstating a One Hundred Year Old Tunnel in the Southern Alps Through Highly Fractured Schist for Hydro GenerationBy R Shelton
The Big Wainihinihi River and tunnel are located on the western side of the Southern Alps of New Zealand within the active Alpine Fault zone, which marks the boundary between the Pacific and Australia
Mar 8, 2011
-
Ranger - The 5 Star MineBy Resta S. A
Energy Resources of Australia Ltd - Ranger Mine is located about 255 kilometres east of Darwin in the Alligator Rivers Region of the Northern Territory. The Ranger project is surrounded by Kakadu Na
Jan 1, 1994
-
Subduction of Oceanic Plate -Its Realities- Summary of French-Japanese Cooperative "Kaiko" ProjectBrief summary of results obtained by a French-Japanese cooperative study on the bottom of trenches around Japan. The geophysical prospection, multi beam echo sounding and direct observation with s
Jan 1, 1987
-
Integrated Optimisation of Grinding and Flotation CircuitsBy P Holtham, K C. Runge, E Tabosa
Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro
Sep 1, 2014
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted AnnulusBy M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?ProcessBy T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
An Integrated Approach to Proactive Tailings ManagementBy T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy
Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta
Jul 27, 2015
-
Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western AustraliaBy D R. Anstey
The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from
Jul 11, 2011
-
Geology – The Affirmative CaseBy D Kepert
It is the role of the exploration geologist to create wealth through the discovery, delineation and characterisation of economic mineralisation. This requires a critical depth of geological understand
Jul 13, 2015
-
Investigation of the Process of Cobalt and Nickel Sulphation from Pyrite Concentrate and Nickel MatteBy Abishev D. N, Balakirev V. F, Davydov G. I
The problem of recovery of cobalt products from poorly oxidised nickel ores (Kempirsaisk deposit) and pyrite concentrates with a low content of cobalt (Sokolovsk-Sarbaisky deposit) has not been sol
Jan 1, 1996
-
The Development of a CADD Mine Design SystemBy Gill L. F, Gleeson HB
This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available
Jan 1, 1989
-
Design of Yield Pillars for Improved Stability of Colliery RoadwaysBy Bhattacharyya A. K
A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction
Jan 1, 1995