Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Simulation Modelling of Grade Variability for Iron Ore Mining, Crushing, Stockpiling and Ship Loading Operations

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, about 50 km north of the town of Southern Cross. Ore is trucked from three geographical

    Jan 1, 2009

  • AUSIMM
    Development of a Pyrite Regrind Circuit at Telfer Gold Mine

    By D R. Seaman, Y Peng, F Burns, D J. Bradshaw

    Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh

    Oct 29, 2012

  • AUSIMM
    Monorail Technology - A Rapid and Cost-Effective Method of Decline Development

    By B Besa

    Australia is a world leader in the design and operation of mines accessed by the decline method. Literature indicates that a number of metalliferous underground mines using the decline system are also

    Jan 1, 2008

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    The Importance of Data Collection to the Blasting Process

    By J Hutchings

    An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat

    Nov 8, 2011

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Development of Robot System for Automatic Assembling of Bolted Segments

    By Harada M, Katsuta S

    In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed

    Jan 1, 1987

  • AUSIMM
    Scoping of Feasibility Studies

    How often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I

    Jan 1, 1998

  • AUSIMM
    Reinstating a One Hundred Year Old Tunnel in the Southern Alps Through Highly Fractured Schist for Hydro Generation

    By R Shelton

    The Big Wainihinihi River and tunnel are located on the western side of the Southern Alps of New Zealand within the active Alpine Fault zone, which marks the boundary between the Pacific and Australia

    Mar 8, 2011

  • AUSIMM
    Ranger - The 5 Star Mine

    By Resta S. A

    Energy Resources of Australia Ltd - Ranger Mine is located about 255 kilometres east of Darwin in the Alligator Rivers Region of the Northern Territory. The Ranger project is surrounded by Kakadu Na

    Jan 1, 1994

  • AUSIMM
    Subduction of Oceanic Plate -Its Realities- Summary of French-Japanese Cooperative "Kaiko" Project

    Brief summary of results obtained by a French-Japanese cooperative study on the bottom of trenches around Japan. The geophysical prospection, multi beam echo sounding and direct observation with s

    Jan 1, 1987

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    An Integrated Approach to Proactive Tailings Management

    By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy

    Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta

    Jul 27, 2015

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • AUSIMM
    Geology – The Affirmative Case

    By D Kepert

    It is the role of the exploration geologist to create wealth through the discovery, delineation and characterisation of economic mineralisation. This requires a critical depth of geological understand

    Jul 13, 2015

  • AUSIMM
    Investigation of the Process of Cobalt and Nickel Sulphation from Pyrite Concentrate and Nickel Matte

    By Abishev D. N, Balakirev V. F, Davydov G. I

    The problem of recovery of cobalt products from poorly oxidised nickel ores (Kempirsaisk deposit) and pyrite concentrates with a low content of cobalt (Sokolovsk-Sarbaisky deposit) has not been sol

    Jan 1, 1996

  • AUSIMM
    The Development of a CADD Mine Design System

    By Gill L. F, Gleeson HB

    This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available

    Jan 1, 1989

  • AUSIMM
    Design of Yield Pillars for Improved Stability of Colliery Roadways

    By Bhattacharyya A. K

    A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction

    Jan 1, 1995