Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cities as Mine Sites of the FutureBy M Warnken
Major cities are not only the focal point for AustralianÆs work, leisure and homes, they also are the focal point for the flow of resources into the built environment, motor cars and transportation an
Jan 1, 2006
-
Tubular Drainage and Lining Geocomposite for Mine Tailings and Heap Leach PadsBy Y Durkheim, P Saunier, L Ameglio
"In the last decade Afitex developed the Draintube™ geocomposite, which provides simultaneous drainage and waterproofing functions. This new type of drain tubes planar geocomposites (DTPG) differs fro
Jul 27, 2015
-
Thermal Modelling and Mitigation Measures for the Bogong Power DevelopmentBy D Wimpenny
The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe
Mar 8, 2011
-
Preconcentration in the pit – size mattersBy T BoBo, D La Rosa, P Cameron
Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u
Nov 10, 2020
-
Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final DesignBy E C. F Hamman
Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock
Jan 1, 2007
-
Iron Ore Grade Control for Flitch Mining – An Alternative Method for the Hope Downs Operation, Hamersley Province, Western AustraliaBy A D. Caccioppoli
Grade control systems within Rio Tinto Iron Ore have proven to be robust, when mining full benches. The Hope Downs 1 operation hosting two Marra Mamba Iron Formation deposits (North and South Deposits
Aug 22, 2011
-
Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1By N Clarke, J Hunt, A Barros, L Keeney
The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and
Nov 10, 2020
-
Using Scenarios to Investigate the Long-term Future of Copper Mining and Guide Exploration Targeting StrategiesBy J P. Sykes, A Trench
"The common-held view of the future of copper mining is one of declining quality of mineral resources and increasingly limited long-term development options. This decline, in turn, is viewed as inevit
Jun 22, 2016
-
Preparation of a JORC Code Compliant Resource Statement Based on an Evaluation of Historical Data – A Case Study from the Panguna Deposit, Bougainville, Papua New GuineaBy P Collier
From 1972 until 1989 when operations were suspended Bougainville Copper Limited (BCL, owned 53.58 per cent by Rio Tinto Limited) operated a large open pit mine and processing facility at Panguna on Bo
Aug 22, 2011
-
Effects of Shear on the Behaviour of Polymer-treated SlurriesBy D Reid, A Fourie
The in-pipe treatment of slurries with polymer addition shortly prior to deposition is a noteworthy emerging technology of increasing popularity. Although polymer treatment has been shown to substanti
Jul 27, 2015
-
Environmental Auditing as a Driver for Continuous Improvement in Environmental PerformanceContinuous improvement in environmental management assists in the achievement of sustainability goals for the processing of minerals. The use of regular internal environmental audits (scored or unscor
Jan 1, 2004
-
Advanced Customisable Leach Columns – A New Kinetic Testing Method to Simulate Site-specific ConditionsBy J Pearce, M Barteaux, S Pearce
The prediction of how waste materials will evolve geochemically within waste storage facilities has been the subject of hundreds of thousands of hours researched by geoscientists globally. Despite the
Jul 27, 2015
-
Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel MineBy J Foster
The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte
Mar 21, 2011
-
Operational readiness – what is it and how to get it done?By A G. L Pratt
Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f
Mar 29, 2023
-
Pyrite depression at Boliden Tara using F-250 – a biopolymerBy Y Peng, C Burns, Y Mu, R A. Lauten
In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a
Aug 29, 2018
-
High shear rotor trials in the Mount Isa Mines Copper ConcentratorBy H Law, M Muller
Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b
Aug 29, 2018
-
Operations versus Projects - How Do People Think and What are the Implications?By B Clements, G Lane
The operations and project environments are very different, but overlap in many areas. The development of mineral processing projects is goal oriented, is schedule focused and is a contractual environ
Oct 29, 2012
-
The Casposo Gold-Silver Project – Process Selection and DesignBy D Connelly
Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi
Aug 8, 2011
-
Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, FinlandOptimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland
Sep 13, 2010
-
Thin spray liners for face support at KanmantooBy B Roache
Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers
Mar 29, 2023