Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Character of Simulation Material of Coal – Rock and Gas Solid-gas Coupling and Engineering ApplicationBy C Bie, S Li, P Xiao, P Zhao, H Lin
"Based on solid simulation material research, the simulation conditions for methane and coal solid-gas coupling were obtained using solid-fluid coupling theory. Using sand as the aggregate and paraffi
Aug 31, 2015
-
JORC and Mineral Resource Classification SystemsThe JORC Code contains a mandatory classification system for Mineral Resource and Ore Reserve estimates for public reporting. The classification is a statement of the Competent PersonÆs confidence in
Sep 26, 2011
-
Updraught SinteringBy Green A. D M
The establishment of the Imperial Smelting Furnace at Sulphide Coporation Pty. Limited for the smelting of zinc and lead made it necessary to design and install sintering capacity to produce approxima
Jan 1, 1964
-
Olympic Dam open stope observations, tactics and characterisationBy G Capes, L Morizzi, N Mitkas, E Jones, D Grant
This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea
Mar 15, 2021
-
The Transition from Semi-autogenous to Autogenous Milling at Waihi GoldBy D Bertoldi, C Haines
"The Waihi Gold Mine (WGM) operated by OceanaGold New Zealand Limited is a wholly owned subsidiary of the OceanaGold Corporation of Australia. Traditionally WGM has stockpiled and processed separate c
Oct 10, 2016
-
Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving ConstructabilityBy E Rubio, N Morales
A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the
Sep 26, 2011
-
Production and Ventilation Management Towards in Integrated Mine Information SystemBy Ward M
The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.
Jan 1, 1995
-
The Eight Millisecond Time Window MythBy A B. Richards
Time window analysis that limits the explosive mass fired within a specified time window (commonly eight milliseconds) has been used for many years in blast design by explosives engineers. Despite sev
Jan 1, 2003
-
Paving the Future - A Case Study Replacing Truck-and-Shovels by Shovel-and-Conveyor Continuous Mining at Carajas Open Pit MinesBy C T. Senra, A Souza
Increasing fuel prices, unavailabilty and high prices of tyres have imposed tremendous challenges for large open pit operations. Carajßs open pit mines, one of the largest iron ore projects in the wor
Jan 1, 2009
-
The Use of Customer Operated Bulk Emulsion Systems for Improved Productivity at the Tara Underground OperationsBy A Suokas
Boliden Tara Mines Ltd, located in County Meath Ireland, produce in excess of 2.5 million tonnes per annum of ore from the underground resource located 40 miles north west of Dublin. The zinc-lead ore
Jan 1, 2005
-
Paper No. 126. Silver-Lead Ore Mining And The Various Systems of Stoping And Timbering Employed in Broken Hill, New South Wales.As this district is so far distant from the other mining centres and its mode of approach so circuitous, I am afraid that many residents of other portions of the Commonwealth never think of paying thi
Jan 1, 1903
-
Improving the performance of blind uphole rises at Ernest Henry Mine – a case studyBy T Purvis, Z Liu
Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro
Oct 16, 2017
-
An Insight into the Swedish Heart of Atlas CopcoAtlas Copco is one of the worldÆs leading providers of industrial productivity solutions (Atlas Copco, 2009). Furthermore, the company spans 160 markets and held 34 000 employees at the end of 2008. T
Jan 1, 2009
-
Alternative Underground Ore Transport Systems for the Jaguar Base Metal DepositBy W P. Darcey
Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in s
Mar 21, 2011
-
Designing Flotation Cells For Optimised Flow DynamicsBy T Niitti, J Turunen, P B, A Rinne
In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati
Jan 1, 2006
-
Lake Margaret Hydro-Electric Power Scheme, Mount Lyell, TASTHE exceptional rainfall characteristic of the West Coast of Tasmania, in conjunction with the rugged topography of the district, has always suggested the utilization of water-power, and from the earl
Jan 1, 1915
-
Orepass Level MeasurementLevel measurement of underground orepasses is important. Orepasses are not only utilised to funnel ore to the shaft skip loading station but also as silos for storing of ore in order to smooth out ore
Jan 1, 2005
-
Determination of cyanide and potentially toxic elements in gold tailings at Barberton, Mpumalanga, South AfricaBy K E. Mudzanani, T A. M Msagati, D T. Maiga, T T. Phadi, M R. Letsoal, B M. Chabalala, S W. Limani
This paper addresses critical environmental, health, regulatory and scientific concerns related to gold mining activities in the specific area of Barberton, Mpumalanga, South Africa. The paper thus ca
Apr 16, 2024
-
Use of On-Belt Analysers for Improved Process Control of Conveyed MaterialsBy M Edwards
The paper outlines the successful application of some of the on-belt technologies available from Scantech International Pty Ltd and how these have provided benefits in a number of mining and mineral p
Jan 1, 2008
-
Use of ?Tunnel Boring Machines in the Mine EnvironmentBy D Mather, H R. Asche
"In the civil tunnelling field, the use of tunnel boring machines (TBM) has now overtaken the use of conventional excavation methods (drill and blast / roadheader). This is due to a number of reasons,
Sep 17, 2014