OFR-20-83 Resilient Screen Test ProgramBy William R. Wessels
This report describes a field survey and laboratory investigation into the causes of failure of resiliently clad screen decks applied to coal preparation plants. Blinding of screen deck perforations a
Jan 1, 1982
-
Advances In Understanding Of Phenomena In The Blast Furnace HearthBy Pinakin C. Chaubal
An industry ? university consortium was set up to develop advanced tools necessary to understanding of the various phenomena occurring in the hearth of the modern iron making blast furnace. The major
Jan 1, 2006
-
The Electrothermic Metallurgy Of Zinc. - Introduction.By B. M. Harra, O&apos
Zinc smelting is frequently termed a backward art. The term is hardly true, for great progress has been made in recent years in the design and in the thermal efficiency of the retort furnace, in the q
Jan 1, 1923
-
RI 7022 Vapor Pressure Of Metal Halides - The SnCl2-ZnCl2 Binary SystemBy L. C. George
The Bureau of Mines measured vapor pressures of selected mixtures in the binary system SnCla-ZnC12 by the static pressure method. Equations expressing the vapor pressure) and the heat and free energy
Jan 1, 1967
-
Anthracite Mine Fires: Their Behavior And Control - IntroductionBy G. S. Scott
Mine fires have occurred since the mining of coal was begun, and they are still occurring. The resulting economic waste may become considerable (219),3 especially if a fire is allowed to assume major
Jan 1, 1944
-
IC 7999 Research And Technologic Work On Explosives, Explosions, And Flames, Fiscal Years 1957 And 1958 ? Introduction And SummaryBy Ruth F. Brinkley
This report is the 18th of a series of reports originally issued annually, and more recently bienially, to acquaint the public with the work of the Federal Bureau of Mines in explosives technology. Pa
Jan 1, 1961
-
RI 7537 Dry-Pressed Building Bricks From Copper Mill TailingsBy P. G. Pigott
This Bureau of Mines laboratory research demonstrated that building bricks meeting ASTM specification C62-66 for grades SW and MW of FBS-type bricks can be produced from waste copper mill tailings. Wa
Jan 1, 1971
-
Foundation Design And Construction In Variable RockBy Joel Moskowitz
A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be
Jan 1, 2002
-
The Caustic Crack Route for Processing Concentrate from the Avalon Nechalacho DepositBy Dave Marsh, John Goode, Niels Verbaan, Kevin Bradley, Henrie Notzl
The mineralogy of the Avalon Nechalacho deposit is complex with significant fractions of HREEs, Zr, and Nb found in refractory minerals such as zircon and fergusonite. Sulphuric acid baking followed b
Jan 1, 2014
-
The Improvements in Control of the Mill 3 Circuit at AlcoaÆs Wagerup RefineryBy D Nicoli, P Feltoe
The operation of grinding circuits are vital to the success of most mineral processing operations in the provision of effective size reduction whilst maximising throughput. However these same circuits
Jan 1, 2000
-
A Proposed Preliminary Model for Monitoring Hearing Conservation Programmes in the Mining Sector in South AfricaBy O. Nyandoro, K. Khoza-Shangase, M. Madahana, N. Moroe
"Occupational noise-induced hearing loss (ONIHL) is classified as the leading work-related disability in the mining industry. ONIHL has a negative impact, on not only the health and occupational produ
Jul 1, 2019
-
Discovery of Uranium Mineralization in the Manyingee Channel, Onslow Region of Western AustraliaBy Morabito J, Harrop D. W
Uranium exploration was commenced in 1973 and carried out at a regional scale over a wide area of the northern part of the Camarvon Basin of Western Australia by Minatome Australia Pty Limited and the
Jan 1, 1981
-
Mineral Processing And Intellectual Property - Rare Earth Element Case StudyBy Heramb M. Bal
This paper will underpin the future development of intellectuals having greater understanding of patent law and legislation, IP rights, and innovation. To understand this idea, I present a case study
Sep 1, 2012
-
Applied Ergonomics For Operator Compartment Design In An EJC 88 XLP LoaderBy S. Thorley
In engineering design of operator?s compartments, in underground mining equipment, ergonomics principles are often neglected or not given the full recognition they deserve. This paper defines ergonomi
Jan 1, 2006
-
Pyrite Bioleaching and Slag Neutralisation - Two Treatments in a Single Process for Recovering Valuable Metals from Both MaterialsPyrite Bioleaching and Slag Neutralisation - Two Treatments in a Single Process for Recovering Valuable Metals from Both Materials Very often the production of copper sulfide concentrate yields pyrit
Sep 13, 2010
-
An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount MilliganBy J. Yue
"Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of
Jan 1, 2017
-
Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)By L. W. T. Weitzel
"This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to
Jan 1, 2003
-
Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press FoundationBy David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003
-
RI 3431 House Movement Caused By Ground Vibrations ? Introduction (f084d160-37aa-4764-86e3-1d24b7a3ece2)By J. R. Thoenen
For several years the Bureau of mines has been investigating the characteristics of ground vibrations produced by quarry blasts. Considerable basic information has been obtained in the course of this
Jan 1, 1938
-
Operating Experiences with the High Pressure Gas Pipeline from Morwell to MelbourneThe construction of the pipeline was completed in June 1956 and the line placed into operation in December 1956, ie. it has now been in continuous operation for approximately three years under an oper
Jan 1, 1960