Search Documents

  • DFI
    Small Diameter Piling System Used In Australia

    By P. J. Yttrup

    Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods

    Jan 1, 1989

  • NIOSH
    RI 3452 Studies Of Roof Movement In Coal Mines - 2. Crucible Mine Of The Crucible Fuel Co. ? Introduction

    By E. R. Maize

    This report is the second of a series on roof movement in coal mines. The first (R. I. 3355)4/ dealt with convergence of roof and floor and movement of the surface accompanying and following extractio

    Jan 1, 1939

  • NIOSH
    IC 9106 Availability Of Elemental Sulfur And Pyrite Concentrate-Market Economy Countries - A Minerals Availability Appraisal

    By D. A. Buckingham

    Engineering and economic evaluations were performed by the Bureau of Mines on 14 Frasch sulfur, 1 native sulfur, and 21 metal sulfide operations in 11 market economy countries. The evaluation included

    Jan 1, 1986

  • NIOSH
    Barite Deposits Of Arizona ? Summary - Bureau Of Mines - Report of Investigations - 1960 RI 5651

    By L. A. Stewart

    This paper describes all occurrences of barite in Arizona that were known or reported to the authors. The history, ownership, production, and geologic setting are discussed for most of the deposits. T

    Jan 1, 1960

  • NIOSH
    RI 3452 Studies Of Roof Movement In Coal Mines - 2. Crucible Mine Of The Crucible Fuel Co. ? Introduction (b2c06069-2efb-4770-a82c-ff6e6ca0ac43)

    By E. R. Maize

    This report is t e second of s series on roof movement in coal mines. The first (R. I. 3355)4/ dealt with convergence of roof and floor and movement of the surface accompanying and following extractio

    Jan 1, 1939

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • NIOSH
    The Unpredictable Life Cycle of a Coal Pillar

    By Stephen C. Tadolini, Peter (Yunqing) Zhang

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

  • SAIMM
    A decision analysis guideline for underground bulk air heat exchanger design specifications

    By M. Hooman, W. M. Marx, R. C. W. Webber-Youngman

    This paper discusses a study that investigated different underground bulk air heat exchanger (>100 m3/s) design criteria. A literature review found that no single document exists covering all design c

    Jan 1, 2015

  • SME-ICGCM
    A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining Gateroad

    By Jennifer Riefenberg

    Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern

    Jan 1, 1993

  • NIOSH
    RI 6035 Hydrogen As An Oxidation Retardant In Gas-Cooled Systems ? Summary

    By Robert F. Stewart

    The oxidation of structural materials at high temperatures in gas-cooled systems can be greatly retarded by the addition of small amounts of hydrogen to the inert coolant. In experimental equipment fo

    Jan 1, 1962

  • NIOSH
    RI 3181 Active List Of Permissible Explosives And Blasting Devices Approved Prior To June 30, 1932 - Permissible Explosives Tested Under Schedule 17B

    An active list of permissible explosives was published in July, 1931, as part of United States Bureau of Mines Report of Investigations 313, under the title of "Active List of Permissible Explosives a

    Jan 1, 1932

  • IOM3
    Ore reserves: errors and classification

    Errors in ore reserve estimation can occur during drilling and sampling, sample preparation and analysis, geological logging and modelling, database construction, statistical or geostatistical evaluat

    Dec 1, 1996

  • NIOSH
    RI 8717 Recovery of Platinum-Group Metals From Stillwater Complex, Mont., Flotation Concentrates by Matte Smelting and Leaching

    By E. G. Baglin

    As part of an effort to decrease U.S. dependence on imports of critical and strategic metals, the Bureau of Mines investigated three leaching methods for extracting the base metals and recovering plat

    Jan 1, 1982

  • SME
    Binders For Heap Leaching Agglomeration

    By K. A. Lewandowski

    Agglomeration techniques are widely used by industry to form fine particles into larger masses that are easier to handle and process. One area where agglomeration is potentially useful is in heap leac

    Jan 1, 2009

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • AUSIMM
    The Synclinal or "Inverted Saddle" Reefs of the Bendigo Godlfield

    Whilst much has been written in past years by geologists, scientists, mining engineers, etc., regarding the well·known and justly notorious anticlinal, or, as they are more commonly known, "

    Jan 1, 1902

  • ISEE
    Delay Blasting Cap Corrosion of the Nonel by Acid Water

    By Noelia Valencia, Carlos Agreda, Jean Arenales, Juan Llerena

    "In this technical paper is reported the several tests and the preliminary results that has been obtained so far. It must be emphasized that this investigation was started several months ago.On the ot

    Jan 1, 2016

  • AUSIMM
    Computer-Assisted Geological Mapping

    Measurements from an old survey are being machine processed as a pilot project in the development of a computer-assisted method of structural mapping in shield areas. The key element in the system is

    Jan 1, 1969

  • ISEE
    Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling Concept

    By Frank Sames

    Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra

    Jan 1, 1995

  • ISEE
    Blasting and Comminution Choices for the Management of the Mining Business

    By Alexandre Passos, Giorgio De Tomi, Tatiane Marin, Dennis Cremonese, Jacopo Seccatore

    "In the mining industry, rock excavation is the first phase of the comminution process. Downstreamoperations such as secondary breaking, crushing and milling terminate the process, reducing the size o

    Jan 1, 2016