Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Influence of a Coal Mine Subsidence on An Adjacent Dam

    By Nengxiong Xu

    The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)

    Jan 1, 2013

  • SME-ICGCM
    Bolting Practice In Longwall Gateroads At The Miike Colliery

    By Kikuo Matsui

    Standing supports such as steel arches or square work supports along with the necessary struts and lagging have been traditionally employed in the longwall gateroads of the Japanese underground coal m

    Jan 1, 1993

  • SME-ICGCM
    Analysis Of Cable Bolt Performance Using Numerical Modeling

    By M. Bouteldja

    A finite element modelling approach is developed for the evaluation of the mechanical performance of cable bolts supports in underground mine structures. The modelling approach permits the simulation

    Jan 1, 1999

  • SME-ICGCM
    State Of The Art Testing Of Powered Roof Supports

    By Robert C. Garson

    The Mine Roof Simulator at the DOE'S Mining Equipment Test Facility is described. Its use in the research and development on the behavior and response of longwall roof supports to simulated mine

    Jan 1, 1982

  • SME-ICGCM
    Measurement of Effects of Interaction and Influence on Mine Layout Design at Maltby Colliery

    By J. S. Oram

    Maltby Colliery, operated by RJB Mining (UK) Ltd is successfully mining the Parkgate seam in Yorkshire at a depth of 1000m using longwall retreat. Extraction in the Parkgate seam is influenced by inte

    Jan 1, 1997

  • SME-ICGCM
    Field Testing of a Real Time Roof Mapping Drilling Display System in a Limestone Mine

    By Craig Collins

    The objective was to develop a Real Time Drilling Display System for Rotary Roof Bolting using Analyzing Software to display mapped holes as they are being drilled in real time. The Analyzing Softw

    Jan 1, 2004

  • SME-ICGCM
    Mechanisms of Chimney Subsidence Over Abandoned Coal Mines

    By Mario G. Karfakis

    Mining related subsidence is a major concern over abandoned shallow coal mines. Many of the subsidence prone areas are presently used or will be used in the future for residential housing development.

    Jan 1, 1987

  • SME-ICGCM
    Some Structural Aspects Of Designing The Shield Supports

    By S. S. Peng

    This paper presents a convenient way for the preliminary design of the shield supports. The locus equations which are applicable for all kids of shield supports are derived. These equations facilitate

    Jan 1, 1982

  • SME-ICGCM
    The Influence of Interface Friction and W/H Ratio on the Violence of Coal Specimen Failure ? A Comparison Between a Bump and Non?Bump Prone Mines

    By Simon H. Prassetyo

    Violent failures of coal pillars, known in practice as coal mine bumps, have long been a subject of investigation. Many field investigations have considered geological conditions that create high stre

    Jan 1, 2011

  • SME-ICGCM
    Streams and Longwall Coal Mining Subsidence: A Pennsylvania Perspective

    By Anthony T. Iannacchione

    Longwall mining produces surface subsidence basins that affect streams by water diminution and contamination. These effects can ultimately impair the biological character of the plants and animal comm

    Jan 1, 2011

  • SME-ICGCM
    Evaluation of Pillar Recovery in Southern West Virginia (0e64fb3d-0c07-4638-b455-a16004535ca1)

    By Chris Mark

    Pillar recovery continues to be a significant ground control hazard. During the past decade, 10 miners were killed during pillar extraction operations in southern West Virginia. Studies conducted duri

    Jan 1, 2002

  • SME-ICGCM
    A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003

    By Dave Forrester

    Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr

    Jan 1, 2004

  • SME-ICGCM
    New Design Criteria for Roof Bolt Systems

    By John C. Stankus

    From research started six years ago, a new design criteria has been developed for mine roof bolt systems This design criteria precisely and quantitatively determines parameters such as bolt length, in

    Jan 1, 1997

  • SME-ICGCM
    Analysis of the Effect of Rate of Extraction on Strain Development in Interaction Subsidence Data Using a Neural Network

    By Peter Cain

    In 1993 an opportunity presented to monitor the effects of undermining an abandoned roadway by a longwall panel in the Sydney. N.S. coal field. Interaction subsidence data was collected by survey leve

    Jan 1, 1998

  • SME-ICGCM
    The Application of Pre-tensioned Grouted Tendons at Harworth Colliery, UK

    By Chris Adams

    The application of pre-tensioned tendon roof support assisted Harworth Colliery in their revival, from impending closure to lowest cost deep-mined producer in the UK, over just six months last year. T

    Jan 1, 2003

  • SME-ICGCM
    Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)

    By Marc T. Filigenzi

    Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can

    Jan 1, 1997

  • SME-ICGCM
    Stable Entry Design In A Multi-Seam Environment

    The challenge of planning to minimize interaction effects in multi-seam mining is compounded by the difficulties inherent in extrapolating essential geological and spatial data between sampling points

    Jan 1, 1994

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Improving Stope Support At Modikwa Platinum Mine

    By Jaco J. van Vuuren

    Modikwa Platinum Mine, in the Eastern Bushveld of South Africa's Limpopo Province, is a new operation employing a hybrid mining method where mechanised methods are used for the main developments

    Jan 1, 2004

  • SME-ICGCM
    Surface Structures Impacted By Subsidence From Pennsylvania Coal Mines, 2003 to 2008

    By Anthony T. Iannacchione

    Underground bituminous coal mining is a large and significant industry within the Commonwealth of Pennsylvania, and it has a legacy of environmental consequence. For example, in 2008, 13.5 acres (5.5

    Jan 1, 2011