Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The party’s over, now what? - ME Feature ArticleBy Peter Werner
Technological advances in mine equipment and milling processes have enabled mining companies to exploit ever lower grades of ore. The result has been larger disturbances, greater volumes of waste, a c
Dec 1, 2025
-
Prospects And Potential For Mineral Development In Haiti (411013c4-6714-497a-94c6-52b64c0b8c46)By K. Voltaire
As can be guessed from the subtitle, this paper will not be a geologist's one since neither of the authors is a professional geologist. This will be an attempt to present the various aspects of t
Jan 1, 1978
-
Recent Work On Developing New Sulfide Mineral Collectors Based On Chelation ChemistryBy R. R. Klimpel
The use of froth flotation as a means of separating and upgrading sulfide mineral concentrates is standard industrial practice throughout the world. It is ap-parent from observing the industrial pract
Jan 1, 1989
-
Recovery Of Copper From In Situ Leach SolutionsBy J. F. Edwards
In situ extraction of copper through borehole injection presents a new technology for the mining of copper. For the successful application of this technology, copper recovery at the surface must be sp
Jan 1, 1988
-
Polyurethane Foam and Alternatives for Void Filling ApplicationsBy Delbert Hamilton, Christopher Snyder
In the last three years there have been four uncontrolled heating events in mines that have been attributed to the use of polyurethane foam as a void fill product. These heating events are due to the
Jun 25, 2024
-
Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger
The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of
Jun 13, 2021
-
Stability Assessment Of Coal Mine RoofsBy M. Akram
Stability assessment of entry roofs is an essential precursor to all underground design. Both multi-seam interaction and longwall mining can subject entries to radical changes in the surrounding stres
Jan 1, 1993
-
The "Asbestos" Controversy (2f3df2d7-de6d-4465-be83-7a7ca54c7132)By Earl G. Hoover
For most geologists and miners the term "asbestos" refers to a group of highly fibrous silicate minerals that readily separate into long, thin, strong fibers of sufficient flexibility to be woven, are
Jan 1, 1978
-
Improving Quality Control at Alunorte Using a Process Information SystemBy J. A. Dlas Lima
Alunorte is a metallurgical-grade alumina refinery located in northern Brazil. This plant which was designed to produce 1.1 million mtpy of calcined alumina, started operation in July 1995. A proce
Jan 1, 2000
-
Optimum Mine Designs to Minimize Coal Blimps: A Review of Past and Present U.S. PracticesBy Matthew J. DeMarco, Anthony T. Iannacchione
Coal bumps have presented serious mining problems in the U.S. throughout the 20th Century. Fatalities and injuries have resulted when these destructive events occur at the working face. Persistent bum
Jan 1, 1992
-
Solutions to reduce blast-induced ore loss and dilution at the Ahafo openpit gold mine in Ghana - SME Transactions 2012By A. Tordoir, S. S. Kanchibotla, W. Rogers, E. Engmann, B. Bisiaux, S. Ako
Blast-induced rock mass displacement can have a significant impact on ore loss and dilution. The mischaracterization of the grade boundaries both prior to, as well as a result of, blasting can lead to
Jan 1, 2012
-
Case study: correcting control problems on Essroc’s multidrive station, horizontally curved conveyor - SME Transactions 2013By A. Jennings, J. Cornet, P. Perrone
Controlling long overland conveyors with multiple drive stations is a complex problem. The methods for controlling these belts in a steady state are well-covered in existing literature, but a discussi
Jan 1, 2013
-
Gravity Recoverable Gold From -13 mm Crushed Ore, Ester Dome, AlaskaBy P. D. Rao, D. E. Walsh
A pilot-scale study was performed to evaluate the potential for gravity concentration of gold from -13 mm (-1/2 in.) crushed ore from Ester Dome, AK. 9.04 t (9.94 st) of crushed ore were sampled and p
Jan 1, 1992
-
Reclamation Of Mined-Out Bauxite Lands In Jamaica, 1952-1970By C. E. Davis
The Jamaica Mining Legislation requires the bauxite companies operating in the island to reclaim all mined-out lands (except those legitimately excluded) to the level of agricultural or pastoral produ
Jan 1, 1972
-
Removal Of Unburned Carbon From Fly Ash By Froth FlotationBy S. K. Kawatra
The fly ash from coal combustion often has a high unburned-carbon content. This can make it unusable as a cement admixture, which is the major fly ash utilization market. As a result, high-carbon fly
Jan 1, 1996
-
Reducing Bolter Operator Exposure To Hazards (10250071-d245-48e5-87ea-cabe71bcc3da)By M. J. Klishis
This paper presents the findings of a study on roof bolters' hazard exposure. A "micro-analysis" of accident data was combined with ergonomic observations of roof bolter operators to categorize b
Jan 1, 1995
-
Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor
The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage
Jun 23, 2024
-
Evaluation Of Cement Raw MaterialsBy Donald Towse
Portland cement is a basic building material in every country in the world, and, fortunately, the raw materials required in its manufacture are widely distributed. It is a low-priced bulk commodity (p
Jan 1, 1970
-
The Use of Structural Codes in Tunneling - RETC2021By Harry Asche
Tunnels are frequently specified by owners to be designed to a structural code, often a bridge code. In the USA, AASHTO have created a tunnel code, based on structural principles, the AASHTO LRFD Tunn
Jun 13, 2021
-
Managing Continuous Improvement Of Mine To Mill Begins With Measurement - SME Annual Meeting 2022By J. Loeb, R. Ramanathan, P. Cameron
All mining operations, including iron ore, maintain a focus of continuous improvement and asset optimisation in their operations. As all the operations in the Mine-to-Mill value chain are inter-depend
Mar 2, 2022