Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
How fleet the frontier : Colorado's San Juan mining district, 1870-1900By Duane A. Smith
Introduction From the days of the Spanish in the eighteenth century, Colorado's San Juan mining district has attracted miners and public interest. The Spanish left behind names - San Juans, La P
Jan 2, 1988
-
Problems Of Coal Supply ForecastingBy Richard L. Gordon
Coal supply analysis has since about 1973 become a major activity of many scholars and consulting firms. The present paper is an effort to explain in as nontechnical fashion as possible the state of t
Jan 1, 1977
-
Control Of Large Grinding Mill CircuitsBy M. H. Pettibone
During the past decade, the size of grin- ding mills has steadily increased. Mills 11 m in diameter with 9 mW motors have been installed with even larger units on the drawing board. The rising cos
Jan 1, 1981
-
Part 6: Flow Diagram Unit Water BalancesBy Joseph W. III Leonard
Most material balances on coal preparation plant flow diagrams are stated in tons per hour of solids and gallons or liters per minute of water. Balances expressed in these terms can be simplified when
Jan 1, 1991
-
Underground Mining Plants In Harmony With The Surroundings ? I. The Scope Of The ProblemBy R. L. Bullock
The New Lead Belt of Missouri, situated in the heart of the Clark National Forest, stands as a dynamic example of how mining activities can successfully coexist in a restricted wilderness area. After
Jan 1, 1973
-
Case Study of EPB-TBM Crossing through Boulder Cluster and Method Selected for Claim Resolution - RETC2021By Ehsan Nasiri, Keivan Pak Iman
Historically, boulders are a frequent source of problem in soft ground tunneling. It is important to attempt to make an assessment of the nature and quantity of the boulders, although in many cases, i
Jun 13, 2021
-
The Role Of Wheel Tractor Scrapers In MiningBy Donald V. Fites
The evolution of open-pit mining has been rapid during the last two decades. The development of larger, more productive and efficient equipment has been one of the key factors in this open-pit advance
Jan 1, 1969
-
JWPCP Effluent Outfall Tunnel in Los Angeles, California— Anticipated Challenges and Slurry TBM Performance in the Soft Ground Section of the Alignment - NAT2024By Martino Scialpi, Miriam Piemontese, Claudio Cimiotti, Matt Kendall, Nicholas Karlin, Roberto Schuerch
The Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to the White Point Manifold. Upon completion
Jun 23, 2024
-
Approximating a project's rates of returnBy M. M. Hajdasinki
A project's rates of return (RORs)1, be it the internal rates return (IRRs) or one of the many IRR surrogates, frequently needs to be approximated. The success and efficiency an ROR- approximatio
Jan 1, 1999
-
Understanding the Subsurface Conditions for the Cemetery Brook Drain Tunnel Project - RETC2023By Frederick McNeill, Mahmood Khwaja, Benjamin Lundsted, David Polcari, Michael S. Schultz, Timothy Clougherty
The City of Manchester, New Hampshire, is embarking on one of its largest public works projects in history to construct a 12,000 foot long, large-diameter, conveyance tunnel through downtown Mancheste
Jun 13, 2023
-
Applications Of The Hot Springs Or Fumarolic Model In Prospecting For Lode Gold DepositsBy Joseph E. Worthington
Increases in the price of gold starting about five years ago, and rapid fluctuations since then, have caused a substantial popular interest in the noble metal. Gold prospecting had been at low ebb sin
Jan 1, 1978
-
Softwall Mining (Patent Pending) New Technology For Phosphatic Clays And Other Deposits In Soft, Shallow ConditionsBy Randall D. Peterson
Strip mining with draglines and other surface equipment has traditionally been the method of choice for mining shallow deposits. This is particularly true for soft deposits that require little or no b
Jan 1, 1998
-
Examination of Copper Electrowinning Smoothing Agents. Part III. Chloride interaction with HydroStar and Cyquest N-900By C. Heckman, M. S. Moats, A. Luyima, W. Cui
"Chloride ions and their interactions with two organic smoothing additives – Cyquest® N-900 and HydroStar® 4208 – during copper electrodeposition were explored using cyclic voltammetry and electrochem
Jan 1, 2016
-
Assessment Of Chemical Composition, Potential Mobility And Toxicity Of Elements In Water, Sediments And Evaporated Salts Of Mine Evaporative PansBy E. M. Cukrowska
The evaporative pan complex consists of two adjacent seasonal pans. These pans carry an exceptionally high salt (TDS) load due to over 50 years of effluent discharge via the pipeline from mines. The n
Jan 1, 2006
-
Rethinking The Use Of New Technology To Improve Operational Performance (13251a42-ddff-4e35-aaa8-74bfac714dd9)By B. Cavender
Investments in new technology are often intended to improve the production or cost performance of existing operations. The economics used to justify these projects can be flawed, however, if they do n
Jan 1, 1999
-
Investigation Of Trapping Centres In Thermoluminescent Dosimetry Materials With Application To Lif:MgBy Raphael Mourad, Colin R. Phillips
Investigation of the traps in LiF:Mg, a multi-peak phosphor, was carried out using simple phosphorescence decay analysis. Half lives at room temperature of the trapping centres (peaks -lb, -la, -1, 0,
Jan 1, 1981
-
Continuous Surface Mining Equipment: How To Achieve Success (20dd6831-c58d-4391-827b-af2512db5aea)By E. DeLilia
For the past 30 years, surface mines have moved toward more highly mechanized, automatic systems that continuously mine overburden and ore to in-crease productivity, lower operating costs and minimize
Jan 1, 1995
-
Benefits and Challenges of Progressive Design-Build Procurement— Atlanta Plane Train Project - NAT2022By John Murray, Daniel Ebin, Robert Gould
The Atlanta Plane Train project at Hartsfield-Jackson Atlanta International Airport employed the progressive design-build approach. This provided opportunities for collaboration between the design-bui
Dec 1, 2022
-
Analysis And Modeling Of Longwall Face-To-Face TransfersBy C. Patrick
Longwall face-to-face transfers can cost over $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high cost makes extensive planning and control of the transfer
Jan 1, 1993
-
An Economic Design For Water Wells In Corrosive Environments ? IntroductionBy Don K. Smith
The northern zone of the Indus Basin comprises a vast area of essentially level land in West Pakistan which is irrigated by means of a complex system of canals that distribute more water to more land
Jan 1, 1967