Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLOBy Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
On-Line Rheometer For Mineral SlurriesBy S. K. Kawatra, A. K. Bakshi, T. C. Eisele
An on-line rheometer, suitable for use with slurries, has been developed at Michigan Technological University. This rheometer can be used with both Newtonian and non-Newtonian slurries, and produces c
Jan 1, 1999
-
Occupational Ergonomics: Ergonomic Issues In The Mining IndustryBy E. A. Metz
Ergonomics is the art and science that tries to understand the complex interrelationships among employees, their work environment, equipment, work methods and job demands. Coal and metal/nonmeta
Jan 1, 2002
-
Innovative Solutions In The Development Of An Expert System At CCI’s Empire MineBy R. P. Sloan, A. S. Whitford
In November 1999, CCI's Empire Iron Mining Partnership and MinnovEX Technologies Inc. developed an expert system for advanced control of their Empire IV Grinding Section. Empire IV is comprised o
Jan 1, 2001
-
Field Data Collection: Techniques And ApplicationsBy M. Maier
Geographic Information Systems (GIS) has evolved into a powerful tool for analyzing spatial and attribute data in many industries including mining. Modern field data collection techniques add another
Jan 1, 2001
-
Construction And Geological Engineering Of An Underground Ore BinBy J. F. T. Agapito, G. P. Bratton
A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos
Jan 1, 1985
-
Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New ZealandBy Charlie Watts, Ken Smales, Ron Fleming
The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace
Jan 1, 2007
-
Challenges in undertaking inertisation of fires in underground minesBy A. D. S. Gillies
Inertisation is used to enhance the safety of underground mine areas either to avoid the potential for a combustion event or to stabilize a situation after an ignition, fire or heating. The primary ob
Jan 1, 2009
-
Acid Base Accounting: Low-Level Data Comparison Of Net Carbonate Value Versus Modified Sobek Procedures As Described By The State Of NevadaBy T. Patten
Inter-Mountain Labs, IML, performed a study comparing mining waste rock sample analysis by Net Carbonate Value (NCV) and Modified Sobek acid-base accounting procedures. The study looked at 468 waste r
Feb 27, 2013
-
Modelling of Geomechanics and Geoecological State of Massif in Region of Large-Scale Mining Work with Using of Supercomputer TechnologyBy O. Konovalov, M. Zhuravkov
In report the results of performance of research works on building up of the connected geoecological and geomechanical monitoring system for modelling and study of a state of mining massif in a region
Jan 1, 2005
-
Continuing The Legacy: An Update On The Construction Of The New Second Avenue SubwayBy Jaidev Sankar
The dream of constructing the new Second Avenue Subway in New York has finally become reality as the first construction contract package is currently underway. This first contract requires the constru
-
Contribution of Mechanical Activation for Obtaining Potassium Chloride from Microcline - Mining, Metallurgy & Exploration (2023)By Bahaa Alyosif, Murat Erdemoğlu, Muhammet Kürşat Aydemir, Turan Uysal
The effect of intensive milling on the conversion of microcline ( KAlSi3O8) to potassium chloride (KCl) occurred during the chlorination roasting process for artificial KCl production was investigated
May 31, 2023
-
NIOSH Extramural Research Funding: Fulfilling the Mandate of the Miner Act (e1d7e0c3-f95b-4806-af8c-89ff1f6d2251)By J. F. Burr, D. P. Snyder, G. W. Luxbacher
"The Mine Improvement and New Emergency Response Act (MINER Act) of 2006 established the Office of Mine Safety and Health (OMSH) within NIOSH and provided authority for awarding contracts related to t
Jan 1, 2018
-
The Effectiveness Of Task-Based Noise-Exposure Assessment Methods For Monitoring Miner Noise HazardsBy C. Bise, A. Seal
Excessive noise has long been a hazard in the coal-mining industry. Studies conducted during both the mid-1970s and the mid-1990s consistently show that hearing hearing loss within the mining industr
Jan 1, 2001
-
Development of buffer station for safe and eco-friendly mining of seabed mineral resourcesBy Tae-kyeong Yeu, Jong-Choi, Cheon-Hong Min, Hyung-woo Kim, Jae- Won Oh, Sup Hong, Minuk Lee, Sung-Soon Kim, Chang-Ho Lee, Ki-Young Seong
"Collecting mineral resources from the seabed using a seafloor crawling robot is the firststep in the mining operation. The second-step is lifting the collected ore up to the water surface. For liftin
Sep 1, 2014
-
New Insitu Instrumentation Technique For Tunneling & Mining Design: Field ExamplesBy Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida
A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to
Jan 1, 1976
-
Us Geological Surveys Coal Resource Assessment Of Top-Producing Coal Beds And Coal Zones In The Northern And Central Appalachian Basin Coal RegionsBy L. F. Ruppert, P. A. Freeman, R. C. Milici, S. J. Tewalt, L. J. Bragg
The U.S. Geological Survey has completed a dig-ital coal resource assessment of six of the top-producing coal beds and coal zones in the northern and central Appalachian Basin coal regions. These inc
Jan 1, 2001
-
Use of Simulation to Validate Load And Haul Requirements at Cortez Gold MinesBy W. L. Jacobsen, T. L. Dyer
Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o
Jan 1, 2006
-
Energy Mathematics for Crushing Applications and Systems for Optimizing Comminution CostsBy Malcolm D. Flavel
Much has been said and written about the world's, and particularly the united states of America's, energy crisis. The relative changes between cost components of production have altered bec
Jan 1, 1980
-
Effects of Early Strength Agent on Macro-Mechanical Properties and Microstructure of Gangue-Cemented Paste BackfillGangue-cemented paste backfill (GCPB), is a well-established green mining technology and significantly improves the recovery rate of mineral resources, prevents mine dynamic disasters, reduces surface
Jan 7, 2020