Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rock-Related Fatality Trends In The South African Gold Mining IndustryA South African gold mining rock-related fatal accident database has been analysed in order to determine rock-related fatality trends in the gold mining industry over the period 1990 to 1998. This ana
Jan 1, 2001
-
Anglo Platinum Extra Low Profile (XLP) Mechanised Equipment Implementation ? An Update - SynopsisBy GA Harrison
The introduction of Extra Low Profile (XLP) mechanised equipment within Anglo Platinum is aligned with the overall New Mining Technologies strategy to focus on continuing modernization of our mining
Jan 1, 2008
-
Annual Report - For The Year Ended 30th June, 2002Council for 2001/2002 President A.A.B. Douglas President-elect S.J. Ramokgopa Vice-presidents Senior F.M.G. Egerton Junior Prof. T.R. Stacey Immediate Past-president Dr L.A. Cra
Jan 1, 2002
-
Modelling and simulation of gold ore leachingBy S. Bellec
A leaching model for gold ore that takes into account the impact of cyanide and oxygen concentrations as well as gold surface exposure on leaching performance is developed. Cyanide consumption is esti
Jan 1, 2009
-
Electronic Delay Detonators ? A Unique Solution To Pertinent Mining ProblemsBy Raphael Banda
1 Initiating Systems ? a definition An initiation system is a combination of explosive devices and component accessories specifically designed to convey a signal and initiate an explosive charge
Jan 1, 2005
-
A Review Of Local And International Heat Stress Indices, Standards And Limits With Reference To Ultra-Deep MiningBy R. C. W. Webber
Mining up to depths of 5 000 m would be a world first and, accordingly, no previous experience in the determination of acceptable heat stress limits, criteria or indices is wholly applicable. However,
Jan 1, 2003
-
Evaluation Of Pre-Beneficiation Options For Upgrading Of Low Grade Ore From Rosh Pinah Zinc-Lead MineBy D Reddy
Rosh Pinah Zinc Corporation is a zinc-lead mine located in southern of Namibia. It is currently considering the development of a low grade ore body containing about 2.8% zinc. This ore can be utilised
Jan 1, 2008
-
An Economic Model For Gold And Platinum Mining Using Selective Blast MiningBy I. Bock
Selective Blast Mining (SBM) makes use of milli-second sequential blasting technology to separate the valuable reef material from waste rock in the blasting operation at stope faces in the mining of t
Jan 1, 1998
-
Air Pollution Control System Upgrade At Tubatse FerrochromeBy Luthie Els, Chris Coetzee, Roedolf Koekemoer, Casper Els, Olof Vorster, Frank Fereday
Three electric arc furnaces (EAFs) were constructed by Union Carbide at Tubatse Ferrochrome (TFC) in1975. This plant was expanded to four furnaces at the East Plant in 1985 and the gas cleaning system
Jan 1, 2007
-
Consideration for 2-D and 3-D modelling of shock wave propagation in jointed rock massesBy Y. Y. Jiao, J. G. Cai
To investigate the dimensional effect on shock wave propagation in jointed rock masses, a 2-D and a 3-D calculation of a site test are performed respectively by using Discrete Element Method, the simu
Jan 1, 2003
-
Recovery Of Cobalt From Slag In A DC Arc Furnace At Chambishi, ZambiaBy R. T. Jones
The 20 Mt reverberatory furnace slag dump at Nkana in Zambia contains a substantial quantity of cobalt. A 40 MW DC arc furnace has been built at Chambishi for the purpose of recovering cobalt from the
Jan 1, 2002
-
Silicomanganese Production - Process UnderstandingBy S. E. Olsen, M. Tangstad
The main source of Mn in raw materials for SiMn production is Mn-ore and Mn-rich slag from the high carbon FeMn production. The amount of slag per tonne of SiMn metal is mainly determined by the ore/s
Jan 1, 2004
-
Advanced Mill Relining ? A Key Operational Control (Not Simply A ?Must Do? Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RME's fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill vol
Jan 1, 2007
-
Coal clearance system at Zondagsfontein Colliery ? SynopsisBy P. Mogodi
The purpose of the project was to propose a coal clearance system (coal transportation system from the mining face to the plant) that could be used for the planned underground operations at Zondagsfon
Jan 1, 2010
-
Sulphur Behaviour In Ferromanganese SmeltingBy H. Saridikmen, C. S. Kucukkaragoz
In the present study, the measurement of sulphur distribution ratios between the slag and metal phases encountered in the ferromanganese smelting has been carried out at 0.83 atm of partial pressure o
Jan 1, 2007
-
Some Aspects On Selective Dispersion Of Fine Particles With Special Emphasis On Egyptian Ground Calcium CarbonateBy F. H. Abd EL-Rahiem
A selective dispersion process is presented and the work carried out to find optimum process conditions to minimise the colouring material in ground calcium carbonate (GCC) is described. The feed mate
Jan 1, 2004
-
Pit Slope Design And Risk ? A View Of The Current State Of The ArtBy T D. Sullivan
Risk lies at the heart of all mining and nowhere more so than in pit slope design. Mining is principally about two areas of risk; safety and economics. This paper addresses the main elements of pit
Jan 1, 2006
-
Solving of determinate mining—Economic models by the method of Monte CarloBy I. V. Lunkin, E. B. Rakishev, B. R. Rakishev
In mining the method of statistical tests is used by solving of problems, exposing to influence of random factors. Such problems are: rational selection of equipment set; co-ordination in time of diff
Jan 1, 2003
-
Morphological approach to volume calculation of complex 3D geological objectsBy D. R. Hack, N. M. Sirakov, M. L. Feves, M. Iwanowski
This paper presents a new approach capable of volume calculation of 3D reconstructed geological objects. The method is based on a well-known concept that states the volume of an object can be computed
Jan 1, 2003
-
Development Of A Mineral Flotation Frother For Nchanga Mine On The Zambian CopperbeltBy H Zimba, S Sondashi, M Chitambo
By the time a reagent is finally accepted by a mine for use on its plant it could have gone through several screening and evaluation stages. These stages may include laboratory and plant evaluation te
Jan 1, 2007