Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Methane-air Mixture Air-blast Approximated Using Detonating Cord in Rock Dust Dispersibility Studies

    By BruneJurgen F., Richard C. Gilmore, Matthew Schreiner, Ray Johnson

    Explosive pockets of methane-air mixtures accumulate in underground coal mines and, when ignited, produce an air-blast wave that can disturb combustible coal dust on the floor, roof, and ribs. To prev

    Jan 1, 2019

  • ISEE
    Initial Testing of a Speed of Sound Test Apparatus for Powdered Explosives

    By Barbara Rutter, Shonn Kevin McNeil

    "This study discusses how a prototype was built to measure the sonic velocity in powdered explosives.The sonic velocity of an explosive is a benchmark to determine if the explosive deflagrates or deto

    Jan 1, 2017

  • ISEE
    Hole Diameter: Does it Affect Vibration Attenuation?

    By Tyler Acorn, Paul Worsey, Nathan Rouse

    The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr

    Jan 1, 2013

  • ISEE
    Western Europe's Largest Underground Blast

    By P McConnell, T Garrigan

    Tara Mines Limited, in Ireland, is Western Europe's largest zinc mine. Annual metal production, from 2.5 million tonnes of ore, consists of 180,000 tonnes of zinc and 34,000 tonnes of lead.

    Jan 1, 1989

  • ISEE
    Blasting Seismographs: Transfer Functions, Standards and Accuracy

    "In this work a blasting seismograph was tested on a vibration shaker controlled by a single-point laser Doppler vibrometer (LDV). A total of 43 tests were made to measure the transfer properties(tran

    Jan 1, 2017

  • ISEE
    Application of the NIOSH-Modified Holmberg-Persson Approach to Perimeter Blast Design

    By Chick Kerkering, Stephen Iverson

    Perimeter control blasting is common in civil construction projects but not as common in mining. A poorly designed and executed underground mine development blast design can result in unwanted wall ro

    Jan 1, 2008

  • ISEE
    Epic Blast of 275 US Ton (250 tonnes) Sets Benchmark in Opencast Mining Arena in Environmental Sensitive Area With Desired Fragmentation and Muck Profile.

    By Tapas Kumar Mukherjee, Sujit Kumar, Sanjay Kumar Singh

    This paper dwells on the epic blast conducted at Tata Steel’s captive coal mine in India and the insights drawn from it. Optimal blast design parameters had to be ascertained for operating benches (6.

    Jan 1, 2019

  • ISEE
    Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation

    By Thomas Pallua, William C. Gates

    "Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im

    Jan 1, 2017

  • ISEE
    The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer

    The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi

    Jan 1, 2010

  • ISEE
    A Study of the Impact of Explosive Quality on Blast Performance

    By Alastair Torrance

    The performance of commercial explosives is clearly influenced by the conditions under which they are used. Mining companies are supplied with Technical Data Sheets which provide details about explosi

    Jan 1, 2013

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

  • ISEE
    Shock Impedance Method Applied to Detonation Pressure Measurements

    By Santiago Gómez, Pablo Segarra, José A. Sanchidrián

    In-hole detonation pressure measurements are unusual in the production environment of a mining operation, partly owing to the hostile conditions to which recording equipment and pertinent probes must

    Feb 6, 2023

  • ISEE
    Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators Accuracy

    By J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris

    The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,

    Jan 1, 2012

  • ISEE
    Electronic Detonator and Modern Non-Electric Shocktube Detonator Accuracy

    By Joshua Hoffman, William Chad Wedding, Braden Lusk

    The emergence of electronic detonators as viable products for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to tim

    Jan 1, 2011

  • ISEE
    Using Photogrammetry and UAVs for Pattern Optimization, Quantification, and Mapping

    By Tony Rorke, Tamara Wiseman

    Due to the advancements in technology it becomes easier to obtain accurate measurements for mining, quarry, and construction operations even in the most remote places. The use of off-the-shelf photogr

    Jan 1, 2015

  • ISEE
    Crack Displacement and Vibration Measurement of an Underground Portal

    By Douglas Rudenko PG, Jay Elkin, Siavash Mahvelati Ph. D.

    Very little studies have investigated the behavior of cracks in unlined tunnels over long periods of time, especially when such flaws are subjected to blast-induced vibrations. Using a pool of 30+ bla

    Feb 1, 2020

  • ISEE
    EU Type Certification of Non-Standard Electronic Initiations Systems used in Blasting at Mines and Quarries

    By Matthew Clay, Colin Chambers, Susan Hookham

    Opencast (quarries) and underground mines around the world use blasting methods to mine valuable ore. Traditional blasting systems use technologies such as electric delay detonator systems (developed

    Jan 1, 2017

  • ISEE
    Underground Longhole Blasting near Large-diameter Booster Fans

    By Norm Disley, Kingsley Hortin, Gertjan Bekkers

    As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning

    Jan 1, 2008

  • ISEE
    Inverse Hybrid Method for Determining Pressure Loading on Plates Due To Buried Mines

    By Damien Bretall, William Fourney

    Due to the changing face of warfare there is an ever growing need to protect the underside of combat vehicles from mine blasts. This paper presents a new method to better characterize the pressure pro

    Jan 1, 2009

  • ISEE
    Reactivity and Spontaneous Detonation

    By Alastair Torrance, Italo Onederra, Do Sun Kim, Kush Patel, Gary Cavanough

    Reactivity of ammonium nitrate-based explosives is associated with the presence of sulphide in the ground reacting with explosive products and in some instances causing spontaneous reactions which can

    Jan 1, 2019