Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Control of the Flyrock and Vibrations for the Protection of Electrical InstallationsBy Jorge Cárdenas, Piero Mejía, Diego Gamarra
The present case study details the solution to a complex situation in a mining operation, involving the challenge of expanding the tailings storage facility in high-criticality areas adjacent to elect
Jan 21, 2025
-
Blast Vibration Modelling - An Instrument to Optimise Quarry ProductionBy Drew Martin
In March 2010 the Boral Linwood Quarry, Adelaide South Australia, implemented the blasting contractors Monte Carlo Blast Vibration Model as part of their blast design process. The Linwood Quarry was d
Jan 1, 2012
-
Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness RockBy Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores
One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure
Feb 6, 2023
-
Fragmentation from Pattern Expansion with Electronic Detonators at the Red Dog MineBy Norman Paley
A blasting project was undertaken at the Teck Alaska Red Dog Mine in 2005 to 2007 to determine the extent that using electronic detonators could increase Semi-Autogenous Grinding (SAG) mill throughput
Jan 1, 2012
-
Estimation of Critical Distances to Avoid Failures in Detonators by Dynamic Pressure.By Lizbeth A. Escobar, Phol M. Llanos, Maritza Y. Avila
The present research develops the estimation of critical parameters such as the distances and times between holes to avoid failure due to dynamic pressure in electronic detonators based on the near-fi
Feb 1, 2020
-
Controlled Blasting Technology for Tunnel Crossing Under High-speed Rail in Small DistanceBy Weiying Zeng, Shouwei Wang, Jinbei Zhong, Xiangdong Meng, Lingtian Meng
"Due to a drainage problem, the Lanzhou to Chongqing high-speed rail line had been out of service during the 2015 wet season, so a drainage tunnel is to be constructed for the line and required to be
Jan 1, 2017
-
Use of a Scaled Concrete Model to Determine the Origins of Air OverpressureBy N. Skopak, W. Birch, A. Douglas, C. Johnson
Determining the origins of air overpressure has been a long-debated topic within the explosives engineering community. Historically, it has been accepted that the initial face movement gave rise to ai
Jan 1, 2024
-
A Mine-to-Crusher Framework for Aggregate Operations – Part 3By Diogo Fonseca, José Manuel, Nuno Fernandes, Francisco Monteiro, Andrew Palangio, Blessing Taiwo
This study aims to enhance the integration between blasting and primary crushing operations in quarrying by optimizing the size of oversize and bypass fragments, ultimately reducing energy consumption
Jan 26, 2026
-
Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade ControlBy Peter Dare-Bryan, Will Hunt, Lee Julian
It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule
Feb 6, 2023
-
Load Transfer of Polycarbonate Blast Resistant Glazing SystemsBy Joshua Calnan, Braden Lusk, Kyle Perry
This paper presents detailed information and data regarding the load transfer characteristics of Blast Resistant Glazing Systems utilizing two different thicknesses of polycarbonate. A series of triax
Jan 1, 2014
-
Vibration Effects of Coal Pit Blasts on Tower Pithead Concrete StructuresBy Mark Svinkin
To save time for construction of coal pits, the contractor decided to combine erection of the tower pitheads with digging of skip shafts to the depth necessary for placing proper coal pit equipment. I
Jan 1, 2004
-
Solving Blasting Safety Hazards with Advanced TechnologyBy Ronald W. Roberts
For years, blasters have experienced near-misses, injuries, and yes, even fatalities as a result of the dangerous nature of our business. Yet, some blasters continue to portray the immortal attitude:
Jan 1, 1996
-
Dust Control in Surface MinesBy John W. Brown
"Adequate dust control in and around rock drills is a problem that must be solvedfor the health and safety of workers running the drill as well as those working around thedrilling operation This paper
Jan 1, 1999
-
Experimental Studies to Investigate Pressure Loading on Target PlatesBy T Duff
This paper describes results from small scale tests conducted to determine the distribution of pressure on target plates when subjected to loading due to the detonation of a buried mine in various med
Jan 1, 2014
-
Expanded Blast Design For Tight Controlled Hard Rock Trenching Adjacent To Twin Burried Live Oil PipelinesBy A. Ravi Kumar
A trench is a structure to accommodate fluid carrying pipelines for water, gas, petroleum products etc. Trench serves the purpose to haul the fluids in bulk over long distances safely and economically
Jan 1, 2008
-
Peculiarities of Drilling and Blasting in Underground Small-Scale MinesBy Patricio González Santis, Jacopo Seccatore
This paper documents drilling and blasting activities from gold mining in Ecuador and Chile. First, are described the outdated and often non-rational techniques employed by miners, to provide a genera
Feb 1, 2020
-
Use of Electronic detonators to control blast vibrations – a cautionary taleBy S. Hosein, W. Birch, C. Johnson
The widespread adoption of electronic detonators has given rise to the development of linear superposition to control the environmental impact on both third-party properties and residents resulting fr
Jan 1, 2024
-
Better Fragmentation Through Team work At Dos Pobres Mine Safford, ArizonaBy Denard Brandt, Isidro Martinez, Greg Baker, Laura Slattery, Teddy French
The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup phase of
Jan 1, 2010
-
Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin
An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting
Feb 6, 2023
-
Controlling Overbreak Through Vibration MonitoringBy Kaushik Dey
Bord and pillar is the most predominant method of wining of coal in Indian underground coal mines. Development heading in coal mines often encounters roof stability problem and results in roof overbre
Jan 1, 2008