Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Use of Nonel Reefmaster Assemblies

    By Kfw Eick

    The paper describes the use of the Nonel millisecond delay blasting system in narrow, deep, tabular ore bodies and briefly describes the standard stoping method as used on Harmony Gold Mine and compar

    Jan 1, 1990

  • ISEE
    The Demolition of Genoa's Silos, An Example of Synergy

    By Amanda Verno, Danilo Coppe, Andrea Reggiani, Adolfo Bacci

    The methodological example that comes from the demolition of the Genoa grain silos, should not been considered as an auto-celebration of a difficult project successfully executed, but should serve as

    Jan 1, 2005

  • ISEE
    Fines Reduction Program at the Canadian Salt Company

    By John M. Bolger, Keith E. McMaster

    Excessive salt fines are undesirable in underground salt mining as they are considered a costly waste byproduct. This paper describes an extensive explosive application program conducted at The Canadi

    Jan 1, 1996

  • ISEE
    A Blast Design Analysis for Optimizing Productivity at INCO Limited's Thompson Open Pit

    By Nan H. Lee, Christopher J. Hunter, Stephen H. Chung

    Several factors affect the productivity of mining operations. The geological structure of a mineral deposit and the fragment size of blasted material are considered to be most influential. It is well

    Jan 1, 1991

  • ISEE
    Dynamic Blast Pattern Adjustments in Multiple Row Bench Blasting

    By J R. "Dick" Daniel

    One of the more common tasks in blast management is the adjustment of: shot geometry, explosive energy, and shot timing parameters to achieve changes in blast outcomes and costs. Many of these shot pa

    Jan 1, 1996

  • ISEE
    Blasting Factors Influence the Choice of Blasthole Size for Quarrying

    By N L. Thomas

    Hole size affects many factors which directly influence fragmentation in the muckpile and hence, the cost effectiveness of the entire operation. These factors include production capability, explosives

    Jan 1, 1986

  • ISEE
    Safe Practices for Use of the Sheathed Charge in Underground Coal Mines

    By Richard J. Mainiero, Harry C. Verakis, John J. Mulhern

    There are application in coal mines where it would be advantageous from a safety stand point to fire unconfined shots. However, the firing of mud caps (adobes) or other unconfined explosive charges in

    Jan 1, 1987

  • ISEE
    The Influence of External Detonation Generated Plasmas Upon the Performance of Semi-Confined Explosive Cartridges

    By Lex L. Udy

    External detonation generated plasmas, highly ionized zones of reacting material ejected from the surface of detonating explosive charges, are shown to be the cause of channel desensitization, i.e., t

    Jan 1, 1977

  • ISEE
    The Effect of Discontinuity Orientation on the Success of Pre-Split Blasting

    Previous approaches to pre-split blasting theory have tended to concentrate on the mathematics of dynamic stress wave interaction, whilst only recognizing some interaction with quasi-static stresses i

    Jan 1, 1984

  • ISEE
    Comparison of Traditional Signature Hole Technique and Monte Carlo Approach

    By Braden Lusk

    Vibrations as a result of blasting practices in mining engineering are a complex phenomenon controlled by many variables. Mine blast vibration modeling and prediction is becoming more important as a c

    Jan 1, 2013

  • ISEE
    A Delay Sequencing Blasting System

    By D O. Tan Sky

    This paper will describe the mechanisms involved in delay blasting and how they are applied with the use of D.S.B. It will examine the control of potential damage resulting from detonations, and show

    Jan 1, 1980

  • ISEE
    An Engineering Model for Predicting Rubble Motion During Blasting

    By J T. Schamaun

    Recent applications of explosives and blasting agents to rubble rock have led to requirements for more elaborate design and analysis methods. In most blasting uses, it is necessary not only to fractur

    Jan 1, 1983

  • ISEE
    Applying Wireless Initiation System to Reduce Personal Risk Exposure and Optimize Blasting Sequence and Operational Cycle Time

    By Alejandro Berrios, Matheus DaSilva, Erick Siqueira

    Vazante mine is an underground polymetallic mine that produces zinc, lead, and silver, which belongs to Nexa Resources in Minas Gerais, Brazil. The mine, a sublevel stope underground mine, mainly appl

    Jan 21, 2025

  • ISEE
    A Multiple Blasthole Fragmentation (MBF) Model Based on Non-linear Charge Scaling, Delay Time Contribution, and Rock Dynamic Fracture

    By Ruilin Yang

    This paper presents a fragmentation model for large production blasts. The model uses peak particle velocity (PPV) induced from the blast as a controlling parameter to predict the fragmentation size d

    Jan 1, 2015

  • ISEE
    The Influence of Electronic Delay Detonators on Vibration Fragmentation, Heave and Blast Throw

    By AJ Rorke

    Blasting trials using Daveytronic Electronic Delay Detonator systems (EDD’s) were conducted at the Alpha Ferro Quany (Pretoria) and the Eikeboom Colliery near Witbank in November 1999. The objectives

    Jan 1, 2000

  • ISEE
    Comparison of Techniques Used to Develop a Slot Raise

    By Mauro F. Dobran

    The use of Slot Raises has been common for many years. The following presentation will compare various methods of developing these Slot Raises and introduce two new ones.

    Jan 1, 1996

  • ISEE
    New Model for Realistic 3D Blast Simulation

    By Thierry Bernard

    To be able to precisely predict the result of a mine blast before pressing the button is a goal for many blasters due to the environmental and economic constraints of our century. Based on the fundame

    Feb 1, 2020

  • ISEE
    Blast Preconditioning – A Development and Operational Challenge

    By Jeff Gore, Jack Dermody, David Gribble, Brett Macaulay, Bart Sharpe, Paul Klaric, Paul Thornley, Ben DeVries

    Optimal Fragmentation in Block Caving is difficult to achieve as it is generally defined by the rock mass itself and the way in which the cave is initiated. The lower portion of the cave has even less

    Jan 1, 2013

  • ISEE
    Proactive Controls for Highwall Stability

    By Trevor Ames

    Highwall instability, and sometimes referred to as ground failures, historically are a consistent contributor of mine injuries and fatalities within surface mines. To combat this several efforts, incl

    Jan 1, 2015

  • ISEE
    Trends in Drilling and Blasting (8aa24a46-8326-4148-8007-63f421ba2d8b)

    By Alan Bauer

    During the past several years, the trend to large-diameter blastholes in both open pits and underground mines along with the continuing developments in slurried explosives and delay systems has kept t

    Jan 1, 1978