Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Excavation-Induced Movement of Adjacent Foundations
By Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
Jet Grout Underpinning to Support the Waterman Hospital
By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t
Jan 1, 2019
-
An Analysis of LRFD for Helical Anchors
By Ronaldo Luna, Donald Deardorff
"The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963
Jan 1, 2009
-
Experimental P-Y Curves from Centrifuge Tests on Pile Foundations Subjected to Liquefaction and Lateral Spreading
By Arash Khosravifar, Nason McCullough, Stephen, Milad Souri, Scott Schlechter, E. Dickenson
The results of five centrifuge models were used to evaluate the response of pile-supported wharves subjected to inertial and liquefaction-induced lateral spreading loads. The centrifuge models contain
Jan 1, 2019
-
Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase Ii
By Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.
The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris
Nov 1, 2022
-
Jet Grouted Foundation for 57-Story Tower
By Robert Alperstein, Nidal AbiSaab, Joe Pastore
"This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit
Jan 1, 2016
-
Deep Foundations for Top-Down Construction of High-Rise Project
By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, Victoria
By Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan
The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an
Nov 1, 2022
-
Utilizing Drones to Improve Project Workflows
By Barritt Lovelace
Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site
Jan 1, 2019
-
Signal Anomalies in Crosshole Sonic Logging Testing with a Case Study in Metro Manila
By Benjamin B. Buensuceso III
Crosshole sonic logging (CSL) is a popular quality assurance and quality control method used to examine the concrete quality of cast-in place deep foundations, though the evaluation of the results is
Sep 8, 2021
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing
By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Today’s Connectivity: Using Historical Data to Anticipate Future Risk
By Michael Frawley, Deana Ruud, Jessica Turner
Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po
Jan 1, 2019
-
Dealing with Complexities Associated with the Application of Bored Pile Retaining Walls in Urban Developments
By Abid Adekunte
"Engineers and developers have witnessed the growing popularity of deep basement structures as components of urban commercial and residential developments. This is often attributed to inadequate surfa
Jan 1, 2017
-
Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile Foundations
By Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi
The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading
May 1, 2022
-
Assessment of Existing Bulkhead Walls for Dredging Impacts
By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Fundamentals First
By Jeffrey C. Schuh, Logan Bloemer, Daniel P. Dietzler
Over the past 30 years, the authors have encountered numerous projects where recognizing the geology, soil properties and groundwater conditions, and considering alternative construction techniques ha
Jan 1, 2019
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway Bridges
By Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions
By John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future Generations
By John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1
-
Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CA
By Babak Mamaqani, Pirooz Barar
The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building
Sep 8, 2021