Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Simplified Approach for Evaluating Concrete Deterioration in Vertical Shaft Lining

    By G. Q. Zhou, H. C. Liang, X. D. Zhao

    "This study describes the strain behavior in vertical shaft lining (VSL) embedded in thick soil deposits and its application in assessment of concrete deterioration. The observed strain in VSL continu

    Jan 1, 2019

  • CIM
    Macroscopic Analysis of the Reaction between Molten Copper and Water: Simulations and Preliminary Experiments

    By T. Crivits, I. Bellemans, K. Verbeken

    In the metallurgical industry, furnace cooling is often employed to enhance furnace lifetime. Hence, the pyrometallurgical phase comes in close contact with a non-air coolant. The proximity of the pyr

    Jan 1, 2019

  • CIM
    A Kinetic Model of Anode Copper Reduction and Comparison with Industrial Data

    By Paul E. Mather, Matthew J. M. Krane

    Anode or fire refining is the final pyrometallurgical step in the production of copper anode. Part of this process purifies liquid copper by reducing its dissolved oxygen with a natural gas-steam mixt

    Jan 1, 2019

  • CIM
    Complex Processing of Phosphor Production Slag with Rare Earth Metals Recovery and Deriving of Silicon-Containing Solution

    By Ata Akcil, Z. B. Karshigina, Ye. G. Bochevskaya, Z. S. Abisheva

    "Phosphorus slag is the most heavy-tonnage waste of yellow phosphorus production, which is stored in the dump fields for many years creating ecological problems in the regions. Despite of the actions

    Jan 1, 2016

  • CIM
    Experimental Evaluation of Pyromettalurgical Processes for Lead Removal from Brass

    By R. Stauber, B. Friedrich, S. Hilgendorf, G. Homm, C. Gellermann

    Due to recent regulations limiting tolerated lead concentrations in copper alloys, new recycling strategies have to be considered. This study investigates the suitability of technical approaches in or

    Jan 1, 2019

  • CIM
    Underground Mega Mass Blasting with Electronic Initiation Near Urban Area

    By Jean-François Lagueux

    Goldex Mine is an underground mine located near the town of Val-d?Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to eco

    May 1, 2011

  • CIM
    Froth Flotation with Modified Centrifugal Flotation Cell (CFC)

    By J. X. Guo, A. Pindred, J. Moore

    "Two modified centrifugal flotation cells (CFC), Q2 and Q3 models, have been developed for froth flotation. The operating mechanism of Q2 uses a rotating bowl to create a centrifugal force on the feed

    Jan 1, 1998

  • CIM
    Parameter Study on Arsenic Oxidation from Concentrated Acidic As(III) Solutions with Activated Carbon

    By A. Ghahreman

    Activated carbon is proven to be able to catalyze arsenic oxidation in aqueous solution under acidic conditions. A commercially available granular coconut shell based activated carbon (AC) has been ev

    Jan 1, 2019

  • CIM
    Blasting Practice in the East Bluff Section of the Britannia Mine

    By Chris G. Dobson

    Introduction The Britannia mine is at Britannia Beach, on Howe sound, approximately thirty miles from Vancouver. The first claims were staked in 1898, and a local company was formed at that time to d

    Jan 1, 1935

  • CIM
    Chapter IV-Continued - Part 2.-Nova Scotia - Structure of the Gold Veins of Nova Scotia

    By G. Vibert Douglas

    "Gold occurs in Nova Scotia in three ways, saddle reefs, fissure veins, and fossil placers. Of these the saddle reefs are the commonest. They have been the source of most of the gold and have also bee

    Jan 1, 1954

  • CIM
    Structure of Gold Deposits in the Crow River Area, Ontario

    By Jas. E. Thomson

    PUBLIC attention was first attracted to the Crow River area of north-western Ontario by the discovery of gold in 1928. The first three discoveries were eventually developed into Central Patricia, Pick

    Jan 1, 1938

  • CIM
    Huntingdon Mine

    By Gilles Carrière

    "The Huntingdon mine of Quebec Copper Corporation is situated 3 miles south of the village of Eastman, in the Eastern Townships of Quebec. The copper deposit consists of several pyrrhotite-chalcopyrit

    Jan 1, 1949

  • CIM
    Breaking Down Traditional Silos - A Refreshing Approach to Mine Optimization for the Restart of the North American Lithium Project

    By E. Pallumbo, N. Szwedska, R. Asselin

    "This paper highlights the results of collaboration between geology, mining and mineral processing teams during the restart of the North American Lithium Project, located near La Corne, Quebec, Canada

    Jan 1, 2019

  • CIM
    The Lethbridge coal field

    By R. D. Livingstone

    "THE LETHBRIDGE COAL FIELD lies mainly .to the north and west of the city of Lethbridge. Mining carried on in this area for over eighty years until 1965. Before the building of a railway the coal was

    Jan 1, 1985

  • CIM
    Electrical Energy Management Inco Metals Company Shebandowan Mine

    By Joseph H. Harris

    Shebandowan Mine presents a unique opportunity for the mining industry to demonstrate its willingness and ability to use electrical energy effectively. The mine is a typical 250D-ton/day operation sup

    Jan 1, 1979

  • CIM
    Runout Table Cooling Simulation for Advanced Linepipe Steels

    By V. Prodanovic, M. Militzer

    Production of advanced linepipe steels with strength levels of 685MPa (100ksi) and higher requires excellent control of runout table cooling to produce the desired final fine-grained microstructures,

    Jan 1, 2005

  • CIM
    Novel Metallographic Techniques, Particularly as Applied to the Study of Aluminum

    By C. A. Godden, T. N. Atkinson

    Metallographic techniques developed from studies of corrosion films and electroplated coatings on aluminum alloys, are discussed. These methods, the result of work at the Naval Research Establishment,

    Jan 1, 1962

  • CIM
    Investigating Factors Influencing Fault-Slip in Seismically Active Structures

    By L. A. M. Castro

    As Canadian mines progress to greater depths, magnitudes of induced stresses increase, becoming high enough to cause rock mass damage and failure during excavation. In addition, depending on the orien

    May 1, 2009

  • CIM
    Haulage Evaluation for an Underground Deposit

    By David L. Sprott

    This paper presents an evaluation of underground-to-surface haulage options for a relatively large deposit. Specifically, it presents a recommended haulage option to provide the greatest value to the

    May 1, 2008

  • CIM
    SPLC - A Power Supply for Smelting Furnaces

    By T. Gerritsen, C. Martinez, F. Stober, T Ma, J. R. Frias, M. Sedighy, J. Janzen

    Electrode control systems regulate power by physically positioning electrodes. Due to the weight and inertia of the electrodes and hoist equipment, this is a relatively slow process where power fluctu

    Jan 1, 2005