Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - OCEAN RIDGES - Low-temperature Iron and Manganese Mineral Phases of an Inactive Hydrothermal Mound: TAG Hydrothermal Field, Mid-Atlantic Ridge

    By A. I. Gorshkov, Y. A. Bogdanov, O. Y. Bogdanova

    Abstract - Detailed crystal-chemical study of iron and manganese oxides and some other minerals from low-temperature hydrothermal deposits in a newly discovered inactive mound in the TAG hydrothermal

    Jan 1, 1999

  • CIM
    The Economics of Diamond Projects in the Canadian Arctic

    By Warwick Bullen

    A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions as it applie

    Apr 1, 2005

  • CIM
    Gold Marketing Initiative: Steering Committee findings and recommendation

    Building off the enthusiasm generated by Credit Suisse First Boston on the potential benefits of an industry-wide effort to market gold jewellery, a group of gold producers, led by Randall Oliphant, C

    May 1, 2002

  • CIM
    Co-Production of Heavy Minerals from Oil Sand Tailings

    By Mel Owen, Bob Tipman

    "A number of studies have identified the presence of heavy minerals in the Athabasca oil sands. A 1996 Mineral Development Agreement study into the recovery of Co-Products identified low operating cos

    Jan 1, 1998

  • CIM
    A Local Additional Potential Model For Pipeline Stress Corrosion Cracking

    By Z. Y. Liu

    A local additional potential model (LAPM) was developed to illustrate the role of strain rate in stress corrosion cracking (SCC) of pipelines. According to LAPM, both density and mobility of the local

    Jan 1, 2010

  • CIM
    Problems Requiring Attention in the Design of a Rare Earth Separation Process

    By D. Q. Li

    "This paper briefly introduces problems that can occur in the design of rare earth separation processes and that require close attention during engineering design. Important factors must be considered

    Jan 1, 2016

  • CIM
    Oil and Gas Developments in the Lloydminster Area

    By F. H. Edmunds

    LLOYDMINSTER is the centre of a well developed agricultural area, lying on the Alberta-Saskatchewan interprovincial boundary in Township Fifty. The surrounding country is gently undulating, without an

    Jan 1, 1940

  • CIM
    Effect of Silver, Antimony and Bismuth in Solid Solution on the Flotation of Galena

    By W. D. Madeley

    Synthetic minerals were made from pure starting materials and galena samples were doped with the title metals. Microscopic, microprobe and X-ray examination confirmed that the dopeants were in solid s

    Jan 1, 1978

  • CIM
    The Effect of Impurities on a Copper Starter Sheet Electrowinning Operation

    By M. Pelser, H. Gous, J. H. W. M. Brits, K. Voogt

    The effect of impurities; iron and selenium, on current efficiency and deposit quality in copper electrowinning was investigated using an at-line cell at the Rustenburg Base Metals Refiners’ Copper Ta

    Jan 1, 2019

  • CIM
    Modeling of the Direct-to-Copper Flash Smelting Process

    By M. Kucharski

    The model of the Outokumpu direct-to-copper process deals with a steady-state process the parameters of which do not depend on time. To give a prediction for the process outcome, "a modified black box

    Jan 1, 2007

  • CIM
    16th supplement to bibliography of Canadian contributions in the field of rock mechanics

    By P. E. Weidmark

    "PART I - Published PapersBallivy, G., and Dupuis, M., ""Laboratory testing for the design of grouted rock anchors""; Proc 6th Pan Am Conf Soil Mech Found Eng; Lima; 1:277-291; 1979.Ballivy, G., Ladan

    Jan 1, 1980

  • CIM
    Mine Engineering at Gaspe Copper

    By J. B. Watts

    "THE Mine Engineering Department at Gaspe Copper is staffed by a chief engineer, assist-ant engineer, research engineer, chief surveyor, four instrument men, chief bonus clerk, draftsman, and a helper

    Jan 1, 1959

  • CIM
    Stratigraphic control of Cu-Fe skarn ore distribution and genesis at Craigmont, British Columbia

    By Gregg W. Morrison

    "The Craigmont copper-iron skarn deposit is adjacent to the southern margin of the late Triassic Guichon Creek batholith in south-central British Columbia. Host to the ore are sedimentary and volcanic

    Jan 1, 1980

  • CIM
    Strength and Mechanism of Portland Cement Prepared from Stone Coal Vanadium Slag

    By P. Zhang, K. Liu, L. Ou

    "The strength and mechanism of Portland cement prepared from stone coal vanadium slag were studied in this paper. Initially, the slag was used as silicon raw materials to prepare clinker. By blending

    Jan 1, 2016

  • CIM
    Developing a Diamond Deposit in Saskatchewan

    By Shawn Harvey

    HIGHLIGHTS of STAR DIAMOND PROJECT Initial underground bulk sample 4,048 ct / 25,253 tonnes: US$135/carat: 3,050 ct March 2005 $116 million financing: Newmont takes 9.9% SGF Prefeasibility study

    May 1, 2006

  • CIM
    Pacific Nickel Property

    By A. E. Aho

    "The Pacific Nickel property lies 7 miles northwest of Hope and 100 miles east of Vancouver, in the Coast Mountains of southwestern British Columbia. Nickel-copper sulphides were discovered in ultraba

    Jan 1, 1949

  • CIM
    A Hollow Cylinder Testing Device to Study at Small Scale the Damaged Zone around Underground Openings in Porous Rocks

    By V. Labiouse, F. Orellana

    "Hollow cylinder samples can be tested for both the characterization of rock properties and the physical modelling at reduced scale of engineering applications. Particularly, this type of experimental

    Jan 1, 2015

  • CIM
    Model-based Improvements at the Sarcheshmeh Copper Mine

    By S. Banisi, M. Pourkani, A. R. Laplante, A. Partoazar

    "Canadian experience in industrial modeling of grinding, classification, and flotation kinetics was applied at the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9 % Cu, in an effort

    Jan 1, 1998

  • CIM
    Valuation of exploration properties

    By Hrayr Agnerian

    The fair market value of an exploration property is determined by its potential to host a mineral deposit. This potential is gauged by the results of previous exploration, exploration stage, meaningfu

    Jan 1, 1996

  • CIM
    Hydrometallurgy of Lead

    By F. Habashi

    Lead is an ancient metal, has been produced to-date from its ores exclusively by pyrometallurgical route. The process suffers from high operating cost and excessive pollution problems. Extensive resea

    Jan 1, 2008