    Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet

    "Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu

    Jan 1, 1992

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    Froth Recovery Factor-What is it, And why is it so Difficult to Measure?

    By M. C. Harris

    The past twenty to thirty years have seen unprecedented research activity aimed at understanding the performance of flotation froths. In 1990, Finch and Dobby coined the term froth recovery factor, Rr

    Jan 1, 2009

  • CIM
    Effect of Pulp Temperature on Copper and Gold Collectors at Hudson Bay Mining and Smelting

    By Karl Hoover, Cassandra Spence, Brent Bachewich, Jaakko Levanaho

    "Since year 2000 the gold recovery into copper concentrate at Hudson Bay Mining and Smelting has reduced considerably during the summer months. This initiated a testwork program in the fall 2003 to fi

    Jan 1, 2005

  • CIM
    The development of an integrated IT system at Albian Sands Energy (d99cbaf1-3943-4b92-a3a4-6b74c106073f)

    By L. H. Michaud

    "Albian Sands Energy (ASE), an oil sands surface mining and extraction operation, is currently undergoing start-up and is scheduled to ramp-up to full production by mid-2003. Startup includes the sele

    Jan 1, 2003

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • CIM
    British Columbia Aboriginal Mine Training Association

    What is the BC AMTA? ?What is an ASEP? ?Who are the partners? ?Critical Success Factors ?Questions/Answers Aboriginal Skills and Employment Program (ASEP) ?A collaborative partnership of industr

    May 1, 2010

  • CIM
    Odor Sensors for Ore Sorting and Mill Feed Control

    By Michael G. Nelson

    Control of the feed provided to mineral processing facilities is a continuing challenge. Much effort is currently being devoted to overcoming these problems. These projects are usually described under

    May 1, 2004

  • CIM
    Flotation Circuit Analysis at Zinifex Century Mine

    By Dan Alexander, Ivan Crnkovic, Sarah Schwarz

    "Several plant studies have been conducted at the Zinifex Century Mine over the past 5 years. For each of the plant studies, surveys of the zinc primary circuit were conducted, characterisation measur

    Jan 1, 2008

  • CIM
    Novel Dewatering Aids for Mineral Concentrates and Coal

    By M. Kerr, Petra Lampinen, Jinming Zhang, Petra Brodin, C. Hull, Nils-Johan Bolin, R. Asmatulu

    "According to Darcy’s equation, the rate of dewatering varies as inverse square of the surface area of the particles to be dewatered and is proportional to the pressure drop across a filter cake. Thus

    Jan 1, 2005

  • CIM
    Choosing a SAG Mill to Achieve Design Performance

    By Sami Hindstrom, Travis Orser, John Starkey

    "A great deal of effort has been expended in the last 11 years by the authors and others to identify the correct power required to grind ore in a SAG mill, by developing ore hardness variability funct

    Jan 1, 2003

  • CIM
    The Finch-McIvor Functional Performance Based Grinding Circuit Modeling System

    By James A. Finch, Robert E. McIvor

    "This paper presents the development of a new grinding circuit steady-state modeling system. It is fundamentally based on the “functional performance equation”, which has now been used to improve the

    Jan 1, 2007

  • CIM
    Emperical Design of Stopes for the Lower Rodeo Orebody

    By Denis Thibodeau

    The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the

    May 1, 2002

  • CIM
    Gold Mineralization During Progressive Deformation at the Main Reef Complex, Sheba Gold Mine, Barberton Greenstone Belt, South Africa

    By E. G. Charlesworth, M. J. Robertson

    "Abstract - Gold mineralization in the Main Reef Complex at Sheba Gold Mine is hosted within shear zones in a sequence of shales and greywackes of the Fig Tree Group. Competency contrasts between thes

    Jan 1, 1994

  • CIM
    British Columbia Environmental Assessment Act

    PRESENTATION PURPOSE ? Provide an overview of BC?s Environmental Assessment Actand environmental assessment process ? Identify key issues influencing environmental assessments in BC ENVIRONMENTAL A

    May 1, 2006

  • CIM
    Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls Operation

    By Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam

    "NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of

    Jan 1, 2006

  • CIM
    A Commodity Cycle ? Where Are We?

    By David D. Davidson

    Commodities remain hot for the time being, but for how much longer? The bulls point to global economic growth lead by China?s insatiable demand for raw materials. To further emphasis the bullish view

    Apr 1, 2005

  • CIM
    Some Crushing and Grinding Considerations in Plant Design

    By H. A. Steane

    "This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i

    Jan 1, 1976

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance (1255a8ec-f486-4f0e-a99f-bee3df1f60e5)

    By P. H. Oliver

    "The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row del

    Jan 1, 2003

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance

    By P. H. Oliver

    The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela

    May 1, 2003