Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Gravity Recoverable Gold Test and Flash FlotationBy André Laplante, Robert C. Dunne
"The role of flash flotation in precious metal recovery is reviewed. Interacting flash flotation and gravity recovery is discussed. The GRG test can be used, when linked to the behaviour of gold in gr
Jan 1, 2002
-
Training to Process Analysis Methods using a Gold Leaching SimulatorBy Jessica Egan, Daniel Hodouin, Mohammed Reza Khalezi, Steve Bellec, Claude Bazin, Carl Duchesne
"A model for gold leaching was developed and implemented into a simulator. The simulator uses a description of the ore that is based on the mineral composition and precious metal content. The model ac
Jan 1, 2008
-
Haile Gold Mine Metallurgy and Flowsheet ReviewBy P. Tittes, M. Deal, M. Spicher, S. McDaniel, J. Wickens
"Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through se
Jan 1, 2013
-
Maximisation des revenus et du rendement financier par l’optimisation de I’information, de la planification et des pratiques minières*By M. Vallée
"RÉSUMÉDurant les 10 dernières années, les améliorations dans le contrôle des limites des sautages et les arpentages après l’exploitation ont fourni des informations préalables et post facto sur les l
Jan 1, 2005
-
Implementation of Cyanidation by Size Class at Sleeping Giant MillBy Gilles Landry, Mohamed Ourriban, Pierre Pelletier, Ahmed Bouajila, Claude Gagnon
"This paper summarizes the work carried out to develop and implement the gold cyanidation by size class (CSC) process, a novel concept aiming to reduce cyanide consumption.First, the authors will pres
Jan 1, 2009
-
Reduced Energy Consumption at Kidd Creek through Pressure Filtration TechnologyBy S. Pinard, J. MacLellan, G. Ehlert
"The Kidd Creek concentrator is looking actively for alternative technology as means of reducing operating costs in their concentrate handling section. The use of pressure and vacuum filters to elimin
Jan 1, 1992
-
Upgrading Molybdenite Ores between Mine and Mill Using Microwave/Infrared (MW/IR) Sorting TechnologyBy Eugen Gluck, Gus Van Weert, Peter Kondos
"Microwaves have the capability to heat up sulphides, especially clusters of particles of approx. 1 mm. Some sulphides absorb microwaves more readily than others. Molybdenite is especially effective i
Jan 1, 2009
-
The Impact of Grinding Chemistry on Galena Flotation at Rosh Pinah Zinc Corporation, NamibiaBy Marco Lombard, Paulus Kapolo, Christopher J. Greet
"The conversion of a concentrator from one grinding media type to another is a major undertaking in terms of both financial and technical risk. So, a strategy of completing sufficient laboratory and f
Jan 1, 2013
-
Mill Operations - Lean and KeenBy P. R. Richardson
"Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,
Jan 1, 1988
-
Toppling failure — A proposed analytic solutionBy J. I. Mathis
"The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was
Jan 1, 2004
-
From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona MillBy Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux
"The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur
Jan 1, 2013
-
International Scheme for Assessment of Arsenic Treatment FacilitiesBy N. Yamazaki
The supply of clean copper ores, which have high copper concentration and low impurities like arsenic, has declined year by year. Therefore, both mine and smelter sides have to consider how to remove
Jan 1, 2019
-
Development of a new criteria function to predict microporosity in 319 Al-Si castingsBy L. H. Shang
The 319 Al-Si alloy is one of the most prominently used aluminium-based alloys in motor vehicle and engine applications, Microporosity present in 319 alloy castings reduces the load bearing capacity o
Jan 1, 2005
-
Developments in at-Face/in-Pit Processing TechnologiesBy Martin Stoklossa
Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho
May 1, 2008
-
Control System Performance Assessment-Best PracticesBy Michel Ruel
"PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo
Jan 1, 2011
-
Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication BackboneBy Christoph Mueller
Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi
May 1, 2006
-
Arsenic Hydrometallurgy; Fundamentals, Technology and ApplicationsBy K. D. Mills, R. G. Robins, C. G. Anderson, L. G. Twidwell
Arsenic is a metalloid which has attracted great environmental scrutiny in recent decades. Moreover, its control and deportment is becoming increasingly important in the metallurgical processing of mo
Jan 1, 2014
-
Pilot Plant Testing for Column Flotation Circuit DesignBy G. A. Kosick, G. S. Dobby, O. Matwijenko
"A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl
Jan 1, 1990
-
Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 CatalystsBy M. Kinne
Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM
Oct 1, 2003
-
Optimisation of Coke Breeze Addition in Iron Ore PelletsBy G. Paquet, E. Godin
"Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as
Jan 1, 1986