Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design of Very Large Mill Installations: Mill Design Specifications and AuditsA standard practice of auditing mill designs has developed in the mining industry. The purported aim of this task is to ensure that the mill being offered conforms to the design specification, thus re
Jan 1, 2002
-
Guidelines and Practical Applications for Continuous Improvement in Mine to Mill ReconciliationBy C van Wyk, I Reeves, J Webber, G B. Gnoinski
The minerals industry has been given an opportunity to grow and continue to advance again in an environment where there is the potential to reap big rewards for efficiency improvements due to buoyant
Oct 29, 2012
-
Nickel-Ore Formation in Island-Arc Magmatism, KamchatkaBy Grinenko VA
Mineralogical, chemical, and isotopic data have been obtained for samples from 11 volcanoes and 4 kortlandite intrusives on Kamchatka.Similarities and differences in ore-bearing and barren intrusives
Jan 1, 1990
-
Geotechnical Studies for Open Pit Mines - West Australian Operating ExperienceRecent operating experience from West Australian open pit gold mines has shown that geotechnical input into initial design is rare. As a result, ground stability is poor - almost half the pits designe
Jan 1, 1990
-
Environment Risk Management ù Towards Proactive SustainabilityStringent environmental benchmarks imposed by governments and successful legal challenges in the country of origin have changed the risk profile for all mining companies over recent years. In developi
Jan 1, 2003
-
Design of Yield Pillars in the Southern Coal Field of New South WalesBy Bhattacharyya AK
With increasing demand for more efficient production from the underground coal mines in the Southern Coalfields- of New South Wales, their design and operational aspects are constantly being review
Jan 1, 1992
-
The Water Footprint of Mining Operations in Space and Time - A New Paradigm for Sustainability Assessments?As the mining sector increasingly embraces the sustainability agenda, and implements thorough environmental reporting in support of its case for a continued æsocial licence to operateÆ, there is a nee
Jan 1, 2006
-
CO<sub>2</sub> Geosequestration ù The Challenges of Capturing and Storing CO<sub>2</sub> From the Process IndustriesBy B Hooper
Deep cuts in CO2 emissions will be required to stabilise and, in the long term, decrease CO2 concentrations in the atmosphere. Technologies for capturing CO2 from major stationary sources (power stati
Jan 1, 2004
-
Pressure filtered tailings – environmental and cost benefitsBy R Williams, P Godwin
In a time of changing rainfall patterns and in the light of recent tailings dam failures, there is closer environmental scrutiny for proposed tailings dam construction or expansion. Therefore the elim
Sep 11, 2017
-
Blast Fragmentation Modelling for a Green Field Open Cut Gold DepositBy G Chitombo, G Lewis
The knowledge of the expected run of mine (ROM) fragmentation during the feasibility study of a green field site is essential for the design of downstream crushing and milling processes. However,the p
Jan 1, 2004
-
Microplaty Haematite of the High-Grade Iron Ores – Its Nature and GenesisBy R C. Morris
Secondary microplaty haematite in its variety of styles and generations is the defining component of the high-grade banded iron-formation (BIF)-hosted iron ores of the world that are dominated by mart
Jul 11, 2011
-
Cross Wellacoustic Tomography to Locate Abandoned Underground Mines and Subsidence FailureThe U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomogr`aphic image reconstruction software for the detection and delineation of abandoned und
Jan 1, 1992
-
The Topmost Gold Deposits in China in the Part of the Northwest Pacific Rim with Emphasis on Gold ProspectingGold mineralization belt of eastern China in the adjacent part of the northwestern Pacific rim is orientated NE to NNE and as-sociated with Mesozoic faults and igneous intrusives and Mesozoic to Cenoz
Jan 1, 1990
-
Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines LimitedIn line with the recommendations of The AusIMM/AMIC Joint Committee Report in 1981 Isa Mine ore reserves are quoted in proven and probable categories (recoverable ore reserves). Internal reporting
Jan 1, 1987
-
Chalcopyrite Flotation and Liberation Characteristics Before and After Autogenous Grinding at Mount Isa Mines LimitedBy Espinosa-Gomez R, Johnson NW
The Copper Concentrator at Mount Isa Mines Limited treats on average 18 000 tonnes/day of chalcopyrite ore containing typically three per cent copper. The main gangue minerals are iron sulphides (-1
Jan 1, 1993
-
Kinetics and M÷ssbauer Spectroscopy Studies of Direct Iron Ore ReductionBy Zhou A, Cadogan J. M
Direct reduction of iron ore (DR) is one of the promising technology emerging in the world's steel industry. Kinetics and Mossbauer studies of DR with hydrogen have been carried out at two temp
Jan 1, 1997
-
Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-extraction in the South Deep Section, Western Areas Gold MineBy S Z. Petho
The South Deep surface shaft system is being sunk to a final depth of 2750 m below surface and on completion will be the deepest single drop shaft in the world. The shafts will intersect the target re
Jan 1, 1998
-
Maximising Recovery at Silver Swan Nickel Mine using Cement StabilisationBy P R. Lock
The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas
Jan 1, 1998
-
Spot Imagery for the Detection of Anomalous and Stressed Vegetation Over Mineral Deposits in Semi Arid TerrainSPOT imagery acquired in May 1986 of the areas that include the Dugald River lead-zinc lode, northwest Queensland, Australia and the Ngwenalekau copper deposit, Botswana has been evaluated and comp
Jan 1, 1988
-
The Porphyry Gold Mine, W.A. From Prediction to ProductionThe Porphyry Gold Mine (150km NE of Kalgoorlie) was reopened in November 1983 with production commencing in April 1984. Original reserves quoted for the open pit were 822000 tonnes at 5.2 g/t Au based
Jan 1, 1986