Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine

    By W F. Bawden, J T. Paynter

    This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxial

    Jan 1, 1998

  • AUSIMM
    Production of Zirconia from Zircon Sands

    By Sinha NH

    ICI Australia and CSIRO have developed a novel process for extraction of zirconia from zircon sands. The two stage process involves a high temperature step and a wet chemical processing step. A pilot

    Jan 1, 1986

  • AUSIMM
    Limited Recourse Financing for Major Mining Projects: A Financial and Technical Interface

    By Massy-Greene RB

    Limited recourse financing techniques reduce the financial exposure of equity holders to major mining projects by transfering some of the risks to the banks which provide loan funds for project de

    Jan 1, 1981

  • AUSIMM
    A Critical Review of the Objectives of Research in Extractive Metallurgy

    Recent research publications in extractive metallurgy were analysed for their stated and self-evident objectives. Over 100 different objectives (not specific to a metal or unit operation) were iden

    Jan 1, 1986

  • AUSIMM
    Towards a model-informed process control strategy for coal flotation in a Jameson Cell

    By A J. Morrison, M Yahyaei, J S. Siong, J Wang, K Runge

    The flotation cells used to upgrade ultrafine metallurgical coal (-250 µm) are usually poorly controlled leading to unnecessary loss of combustibles from the flotation system. This is mainly because c

    Aug 24, 2022

  • AUSIMM
    Planning and Design Considerations for Shay Gap Township Built by Goldsworthy Mining Limited

    By Ellson I. G

    Advantage has been taken of the need to build the new mining town of Shay Gap to incorporate a new standard of living in an isolated area, which suffers from climatic extremes. The various problems

    Jan 1, 1973

  • AUSIMM
    Application Of ICP Analysis To Geochemical Prospecting-2

    Systematic ICPES (Inductively coupled plasma emmission spectrometry) analysis of magnetic concentrates from drainage samples has been used to discriminate concentrates dominated by magnetite from

    Jan 1, 1987

  • AUSIMM
    An Investigation of Magnetite Consumption at the Blackwater Coal Preparation Plant of Utah Development Company

    By Tonkin D. A

    Poor performance in the several stages of the magnetite recovery circuit, coupled with poor desliming through inefficient and over- loaded desliming screens, led to excessive magnetite consumption.

    Jan 1, 1974

  • AUSIMM
    Commissioning the Liddell Colliery Longwall

    The Liddell longwall equipment consists of 118 four leg supports, a shearer and armoured face conveyor of 170mm length. The equipment was supplied to Coal & Allied Operations Pty Limited (Coal an

    Jan 1, 1986

  • AUSIMM
    Selective recovery of very fine particles-future prospects

    The processes most likely to be adopted for beneficiating ores or concentrator streams containing a large proportion of particles finer than 10 um are froth flotation, selective flocculation, wet magn

    Jan 1, 1986

  • AUSIMM
    Some Aspects of the Manufacture of Portland Cement

    Portland cement is a finely ground mineral powder obtained by intergrinding a mixture of 95 parts of clinker and five parts of gypsum. It is the generic name for hydraulic cement a man made product wh

    Jan 1, 1978

  • AUSIMM
    The Flash-Point Test for Lead

    IF lead be heated with concentrated sulphuric acid two distinct actions will usually be observed. In the first, bubbles begin to be evolved more or less rapidly from the lead, and in the second, which

    Jan 1, 1930

  • AUSIMM
    Fundamentals of Open Pit Planning and Scheduling

    Open pit planning and scheduling play a significant role in establishing, maintaining and improving the economics of open pit mining ventures.The development of an open pit plan and schedule involves

    Jan 1, 1992

  • AUSIMM
    Diversification Overseas - The CIS Experience

    By Chisholm J. M

    Why go to the CIS? The vast mineral potential of the Commonwealth of Independent States (CIS) has long been recognised, but it has taken the lowering of the iron curtain to open up the region to ser

    Jan 1, 1996

  • AUSIMM
    Mechanised Development At The Kambalda Declines

    This paper deals with the evolution of present mechanised declining and orebody development practices at Kambalda, since their inception in 1969. Eight separate decline accesses have been establis

    Jan 1, 1987

  • AUSIMM
    Exchange and Currency Controls and Regulations

    There is an established need for an inflow of foreign capital if New Zealand is to meet projected growth rates. The Government recognises this and encourages capital inflows especially where there a

    Jan 1, 1971

  • AUSIMM
    Sampling and Analysis Protocols and Their Role in Mineral Exploration and New Resource Development

    By T Smith

    The evaluation of a new mineral resource and its economic viability is critically dependant on the quality of the assay data as it is this data that defines the grade of the resource. However, all too

    Jan 1, 1998

  • AUSIMM
    Environmental Performance of Large Open Pits in Western Australia - A Perspective

    By Lindbeck K

    The mining industry in Western Australia is a large sector of the WA economy providing $12 billion (1993) of the export income for the State. Historically, mining in WA developed from traditional pr

    Jan 1, 1994

  • AUSIMM
    Victorian Brown Coal Mining - an Historical Overview

    This brief overview of the history of Brown Coal mining in Victoria is a luncheon presentation -I do not intend to make it indigestible with extensive listings of resources or production. There is

    Jan 1, 1989

  • AUSIMM
    Gold Mill Expansion at Kambalda

    The design, construction and operation of a 500,000 tonne per year Carbon-In-Pulp (C.I.P.) plant at Kambalda embracing the period from 1980 to 1982 has been previously discussed (Sceresini, 1982).Sinc

    Jan 1, 1984