Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Managing Risk at Rapu Rapu, the Philippines

    Lafayette Mining Limited, a listed Australian company, is developing a polymetallic Project on the island of Rapu Rapu, located to the east of southern Luzon in the Philippines. The Rapu Rapu Project

    Jan 1, 2003

  • AUSIMM
    Assessment of Ecotoxicology and Health Risk from Bioaccumulation in Fish of Heavy Metals and Metalloids from Historical Mine Practices in the Leichhardt River, Queensland, Australia

    By T Huynh, V Matanitobua, J Zheng, B N. Noller, J C. Ng, H H. Harris

    A risk assessment was undertaken of the aquatic ecosystem and bioaccumulation of metals and metalloids in fish at the Leichhardt River, Mount Isa, Queensland. Residual contamination of metals and meta

    Jul 16, 2014

  • AUSIMM
    Discovery Performance of the Western World Gold Industry Over the Period 1985 - 2003

    This paper summarises the performance of the gold exploration industry in the Western World since 1970, with particular emphasis on the period 1985 - 2003. It identifies the number and size of major (

    Jan 1, 2004

  • AUSIMM
    Mauritanian Investment Opportunities

    By Mackenzie W. R, Harding C. G

    The Islamic Republic of Mauritania is a large country of over 1 000 000 square kilometres situated on the Atlantic coast of north-west Africa. It is bounded to the north by Western Sahara and Alger

    Jan 1, 1996

  • AUSIMM
    Quantification of Opencast Potential Within the Waikato Coalfields Using Pit Optimisation Software

    Solid Energy New Zealand (SENZ) uses a 20+ year period for integrated planning of all its business activities. It has an ongoing program of coal resource assessment to optimise future mines within thi

    Jan 1, 2005

  • AUSIMM
    The Economic Life of a Rock Drill

    With the use of 86 rock drills of the jackhammer type at the West Lyell Open Cuts of the Mt. Lyell Mining & Hailway Co., it is of importance to determine the economic as well as the physical life

    Jan 1, 1942

  • AUSIMM
    China-New Zealand Relationships

    Mr Chairperson, respected leaders of the mining industry, ladies and gentlemen;   Good morning, Kiora, Nihao.   I am very honoured to give a speech to the 2005 New Zealand minerals conferenc

    Jan 1, 2005

  • AUSIMM
    The Application Of Polymeric Floculants In Underground Backfill At The Zinc Corporation, Limited And New Broken Hill Consolidated Limited

    The introduction of cement into underground backfilling at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited mines to improve mining efficiencies gave rise to several major pro

    Jan 1, 1973

  • AUSIMM
    The Iron Ores of Yampi Sound, Western Australia

    By Edwards A. B

    Yampi Sound is a small channel in the Buccaneer Archapelago (latitude 16° 10' S.; longitude 123° 40' E.), on the northern coast of Western Australia (Fig. 1), about 90 miles north

    Jan 1, 1938

  • AUSIMM
    Continuous Vacuum Treatments of Molten Metals and Alloys

    By Fitzgerald DE, Taverner MG

    The principles, fields of application and equipment design concepts of several new approaches to continuous vacuum treatments of molten metals and alloys are discussed. Partic- ular attention is pa

    Jan 1, 1972

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    The Reduction Of Iron Ore Pellet Beds With Gaseous Reductants

    The laboratory-scale reduction of fixed beds of iron ore pellets has been investigated over a range of experimental conditions. The effects of reduction temperatures, gas compos- itions and flowrate

    Jan 1, 1974

  • AUSIMM
    Grade Control at Phar Lap and Haveluck Mines Meekatharra: Techniques, Successes and Failures

    By Payne P, Beirne W, Geldard D, O&apos

    Whim Creek Consolidated N.L. has operated openpit mines at Meekatharra since 1980. Mining operations commenced with the Haveluck openpit and the Phar Lap openpit was started in 1 984. Grade control in

    Jan 1, 1986

  • AUSIMM
    Blind Shaft Drilling of the Agnew Mine No. 1 Ventilation Shaft

    The Agnew Mine No. 1 Ventilation Shaft is the largest diameter shaft blind drilled in a hard rock mining environment. The selection of this method of shaft development was based on achieving an a

    Jan 1, 1983

  • AUSIMM
    A Laboratory Study of the Effect of Burden and Spacing Parameters on Rock Fragmentation in Blasting

    By Vutukuri VS, Budavari S

    During recent years many investigators have suggested large spacing to burden ratios to improve the fragmentation obtained in blasting. In spite of these suggestions, most operators still use a conv

    Jan 1, 1975

  • AUSIMM
    Sulphide Oxidation in Pyritic Overburden a Controlled Leach Column Study

    By Bowdler RJ, Lowson RT, Sarbutt JV

    There have been few long-term studies of sulphide oxidation under controlled conditions. The object of this study was to investigate the oxidation and leaching characteristics of pyritic mine materi

    Jan 1, 1988

  • AUSIMM
    The Underutilized Role for Economic Geologists and Geochemists in Environmental Aspects of Mineral-Resource Development

    By Smith KS

    Mineral-deposit geology, geochemical processes, and biogeochemical processes are fundamental controls on the environmental conditions that exist naturally in mineralized areas prior to mining, and th

    Jan 1, 1995

  • AUSIMM
    Scheduling of Short Strike Length, Multiseam Dragline Operations

    By Carrucan M. J

    Costain Resources Limited operates two open cut coal mines in the Hunter Valley coalfields of New South Wales, Ravensworth Mine and Warkworth Mine. The location of the Ravensworth operation is shown i

    Jan 1, 1992

  • AUSIMM
    Overcoming the Problem of Instantaneous Outbursts of Coal and Gas in Australian Collieries

    In Australian collieries, solutions to the outburst problem must be implemented in a highly competitive environment which has a low tolerance on negative productivity effects. Solutions are only

    Jan 1, 1987

  • AUSIMM
    Intensification of the Slag Fuming Process at BHAS, Port Pirie

    By Lane D. P, Malone J. G

    The slag fuming furnaces are the major bottleneck in the BHAS zinc production flowsheet. Intensification of the fuming process could significantly reduce this production restriction. Oxygen enrichm

    Jan 1, 1989