Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Digital geological mapping – pay-offs, pitfalls and pathways to successful mapping digitalisation

    By N Anderson

    The world-class Golden Mile gold deposit in the Eastern Goldfields of Western Australia is part of the Kalgoorlie Consolidated Gold Mines (KCGM) operation, which is wholly owned by Northern Star Resou

    Mar 22, 2022

  • AUSIMM
    Selection Sizing and Developing the Optimum Gravity Gold Circuit for Your Project

    Gravity gold recovery has been practiced for thousands of years, making it one of the oldest forms of mineral processing. Gold is 19 times heavier than water although the barren rock is generally only

    Aug 1, 2010

  • AUSIMM
    Probabilistic Slope Design and its Use in Iron Ore Pit Optimisations

    The current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v

    Jan 1, 2009

  • AUSIMM
    Full Cycle Tailings Management at Fosterville Gold Mine

    By L P. Gray

    "From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro

    Oct 10, 2016

  • AUSIMM
    Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24

    By S Dorrington, J Olsen, N Kinkaid

    Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often

    Nov 4, 2015

  • AUSIMM
    Exploring Optimised Delay Timing for Fragmentation

    By C K. McKenzie

    As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened

    Nov 8, 2011

  • AUSIMM
    Enhancing energy efficiency and reducing water consumption in TowerMill circuit through design and optimisation

    By H Ishikawa, S Palaniandy

    The gravity-induced stirred mill such as the TowerMill is an energy-efficient grinding solution used in secondary, tertiary, and regrinding duties in the mineral processing concentrator. The interest

    Aug 24, 2022

  • AUSIMM
    Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mine

    By R Strand, B Usher

    Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo

    Jul 16, 2014

  • AUSIMM
    Beneficiation of Nickel Laterites for HPAL Processing

    Nickel laterite HPAL circuits are known for their complexity and have presented a large number of challenges to process engineers worldwide. An attitude commonly encountered by the author is that the

    Jan 1, 2008

  • AUSIMM
    Staying in the Game – the Importance of Engineering-based Decisions

    By P J. Fairfield

    This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses

    Jun 22, 2016

  • AUSIMM
    Waterproof Detailing in Drained and Undrained Tunnels

    By J Palise

    As cities become more populated and the need for tunnelling increases, we continue to dig deeper urban tunnels in more challenging ground conditions. At the same time our expectations for durability a

    Mar 8, 2011

  • AUSIMM
    Coal Drift Construction by Tunnel Boring Machine

    By D Sibthorpe

    The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com

    Sep 17, 2014

  • AUSIMM
    Sustainable Development Reporting in the Australian Minerals Processing Industry

    By A Bossilkov

    Although environmental and sustainable development reporting has now become widespread in the Australian mining and minerals processing sector, there remains a great deal of diversity in reporting con

    Jan 1, 2004

  • AUSIMM
    Selection Criteria for Open Pit Production Equipment û Payload Distributions and the æ10/10/20Æ Policy

    By R J. Hardy

    The aim of this study is to examine the volumetric and mass movement characteristics of load and haul operations using statistical modelling of relatively large samples of bucket loads that are transp

    Sep 26, 2011

  • AUSIMM
    Pairing Magnetic and E-field through-the-Earth Communication Systems Based on Mine Site Conditions

    By S J. Schafrik, E S. Gilliland, E C. Jong, J Waynert, C W. Weiss

    Two commercially available through-the-Earth (TTE) communications systems were evaluated at an active underground longwall mine in West Virginia. One system utilises magnetic field (H-field) antennae

    Nov 4, 2015

  • AUSIMM
    A Geostatistical Contribution to Assess the Risk Embedded in Resource Classification Methods

    By J F. C L Costa, J C. Koppe

    It is recognised by the major international codes that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological and grade con

    Jan 1, 2009

  • AUSIMM
    Is Every Mine a Pilot?

    By G I. Lumley

    ‘Every mine is a pilot’ is an attitude which encourages the mining paradox of optimistic mine plans and equipment under performance; propped up by an environment lacking accountability. The premise th

    Jun 22, 2016

  • AUSIMM
    The Technical Analysis of Lead Blast Furnace Slag, as Practised at the Port Pirie Works of The Broken Hill Associated Smelters Pty. Ltd.

    THE slag from the blast furnaces having been granulated, a representative sample is taken to the sample mill. It is then dried, crushed through a 100-mesh screen, intimately mixed, and packeted for as

    Jan 1, 1922

  • AUSIMM
    Skarn-porphyry Transition – An Example from the Antamina Skarn, Peru

    By Z Chang, S A. Mrozek, S Windle

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. It is important to understand skarn-porphyry transitions in order to use exposed skarns to

    Mar 18, 2015