Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • AUSIMM
    Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine

    By S Graskoski

    The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont

    Oct 16, 2017

  • AUSIMM
    Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels

    By R Lau

    The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres

    Mar 8, 2011

  • AUSIMM
    Shifting Waters in the Pilbara’s Iron Ore Industry

    By I Brandes de Roos

    Water has played a key role in the Pilbara’s 60-year history of iron ore operations. In contrast to many of the current-day mining environments, iron ore mining was initially hosted by geological form

    Jul 13, 2015

  • AUSIMM
    Use of drone and LiDAR technology for mapping underground voids

    By D Woolmer

    Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and

    Mar 15, 2021

  • AUSIMM
    Five Years With Paste Fill ù Experience at Henty Gold Mine

    By T J. Grandfield

    Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to

    Jan 1, 2002

  • AUSIMM
    The Consequences for Pillar Stability of Zero Confining Stress Brought about by Forced or Natural Drainage

    By I Gray

    This paper examines the effects of the changes in stress that a coal may undergo as part of the drainage process. As a consequence of this, some coal seams will come to the situation that they have ze

    Nov 5, 2014

  • AUSIMM
    The production of green steel using Hismelt

    By N J. Goodman

    The HIsmelt technology was developed and proven in Western Australia (WA) after more than 30 years and several billion dollars of research and development. The HIsmelt technology was transferred to Ch

    Nov 8, 2021

  • AUSIMM
    Thickening at Karara – The Role of Test Work and Innovative Design

    By G Hart

    As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’

    Jul 11, 2011

  • AUSIMM
    Application of Alternative Lixiviants for Secondary Heap Leaching of Gold

    By N Stockton

    Some preliminary results on the secondary leaching of previously heap leached gold ore are presented. Alternative lixiviants for gold comprising chlorine, thiourea and thiosulphate were compared with

    Jan 1, 2000

  • AUSIMM
    Mine to Tunnel Scale Discontinuum Simulation of Repeated Dynamic Loading of Mine Excavations

    Underground excavations are subjected to complex stress changes caused by nearby mining, but may also be affected by repeated dynamic loading from blasting and seismic events. In some cases, the combi

    Nov 25, 2010

  • AUSIMM
    CHPP waste pumped co‐disposal – some myths and truths

    By S J. Henderson

    Pumped co-disposal of coal processing waste was promoted in the 1990-2000s as a low-cost highperformance alternative to tailings dams. In particular it would avoid high up-front capital for rejects tr

    Jul 1, 2021

  • AUSIMM
    An Investigation into the Effectiveness of Under Platform Exhaust Systems Based on Measurements from the Copenhagen Metro

    By S Ravn

    Under platform exhaust (UPE) systems are often designed into metro stations as a means of removing heat generated by trains as they come to a halt in the platform. These systems are designed to extrac

    Mar 8, 2011

  • AUSIMM
    Sulfur – the new geometallurgical grade in gold-sulfide deposits

    By S Juras

    To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘

    Sep 20, 2017

  • AUSIMM
    The role of steelmaking desulfurisation and EAF-smelter in hydrogenbased steelmaking route of low-grade iron ores

    By Q Fan

    The steelmaking desulfurisation plays an important role in coal-based steelmaking route of blast furnace and BOF converter within the flow sheet of BF-deS-BOF. With the advent of H2-based ironmaking a

    Sep 18, 2023

  • AUSIMM
    Examples of Groundwater Sustainability Issues in Mining

    For Australian mining projects, sustainable groundwater use is typically defined as a groundwater extraction regime, measured over a specified planning time frame, which allows acceptable levels of st

    Jan 1, 2006

  • AUSIMM
    The Cenozoic Detrital Iron Deposits of the Hamersley Province of Western Australia – A Tribute to Mal Kneeshaw

    By R C. Morris

    Two major types of economic secondary iron ores occur in the banded iron formation (BIF)-rich Hamersley Province of the Pilbara, Western Australia:dominant BIF-hosted bedded iron deposits (BID)detrita

    Jul 13, 2015

  • AUSIMM
    Geometallurgical Communication as a Distributed Information System

    By C Moorhead, J Jones

    A common problem in the mining industry is that company geologists can operate in relative isolation to the rest of the company (Jones and Moorhead, 2011). This may result in poor knowledge transfer a

    Sep 29, 2013

  • AUSIMM
    Do You Understand Your Legal Obligations in the Industry?

    Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest

    Jan 1, 2007

  • AUSIMM
    Estimating the Rock Mass Strength of Hawkesbury Sandstone

    By R Bertuzzi

    "This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa

    Nov 5, 2014