Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A case study in managing a high consequence geotechnical risk in a Queensland coalmineBy K Young, M Martin, D Payne
This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor
Nov 29, 2022
-
Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto WayBy G Danckert
The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat
Jul 11, 2011
-
Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI inputBy S K. Panda, M A. Van Ende, S Chatterjee
Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu
Jun 19, 2024
-
Implementing condition-based wear surface managementBy P Velletri, N Gaylard
The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi
Nov 8, 2021
-
Implications of the Carbon Price and Developing a Carbon StrategyBy P Holt, M Allen
On the first of July, 2012, the Australian GovernmentÆs Clean Energy Act commenced. From this point, a price of $23/t of CO2-e will apply to facilities that trip the liability threshold. This first pa
Nov 20, 2012
-
Influence of Cognitive Biases on Project EvaluationBy S Love, M Anderson, M Boland
"The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co
Mar 8, 2016
-
Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG MillBy R A. Pax, B Cornish
"Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly
Oct 10, 2016
-
An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western AustraliaBy C F. Stokes
The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)
Aug 22, 2011
-
Geometallurgy and Ore Processing of the Hibbing Taconite Lake Superior-Type Magnetite Taconite Deposit, Mesabi Iron Range, Minnesota, USABy J D. Lubben
Hibbing Taconite is a Lake Superior-type granular magnetite taconite deposit occurring within the Biwabik Iron Formation along Minnesota’s central Mesabi Iron Range. The deposit is situated on the nor
Jul 11, 2011
-
Ore Type – Everything to Someone but Nothing to AnyoneBy J Jackson, M F. Young
"Ore is the economic portion of a mineral deposit that can be extracted economically. Hence an ore type is a classification of the ore based on one or more dominant characteristics in order to enable
Jun 15, 2016
-
Towards the Implementation of Discrete Fracture Network Modelling as a Geotechnical Design Tool – Case Study of Callie Underground MineBy S F. Rogers, K Doumis, J H. Graaf, B J. Barsanti
Advances in technology now allow geotechnical practitioners to better describe the properties and variability of a rock mass through advances in surface and underground mapping, borehole technology an
Nov 5, 2014
-
Managing steep seam dips and floor shears related dragline bench and lowwall instabilitiesBy J Li, J Regan, D Payne
The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge
Nov 29, 2022
-
Engaging Society about a Potential Mining Future – Concerns and ExpectationsBy N Boughen
This paper synthesises the findings of five studies undertaken by the CSIRO Wealth from Oceans Flagship in 2009-10. This research explores the concerns, expectations, and information needs of a range
Nov 22, 2011
-
Implementation of Acoustic Arrays for Semi-autogenous Grinding Mill?OperationBy R Wynn, R A. Pax, S Mann, B Cornish
The semi-autogenous grinding (SAG) mill at the MMG Century operation has failing load cells that are essential to the control strategy used to stabilise the mill. Currently, mill-bearing pressure is u
Sep 1, 2014
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
Fine-Tuning Raise Bore Stability Assessments and RiskBy W A. Peck
Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug
Mar 21, 2011
-
Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining InvestmentBy J P. Sykes, C Gemell, A Trench
The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing
Jun 22, 2016
-
Leadership in Projects – A Recipe for SuccessBy A A. Roberts, R F. Dewhirst
"Extensive literature surveys, research in the project environment and personal experiences both within and consulting to project teams have revealed some consistent ‘people factors’ that contribute m
Mar 8, 2016
-
Defying Gravity – Brownfield Continuous ImprovementBy J Robinson, L D’Uva
"The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat
Oct 10, 2016
-
Investigations for Proposed Upgrade of the Homer Tunnel, New ZealandBy A D. Campbell
The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a
Mar 8, 2011