Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    What do High Reliability Organisational principles look like in practice in Queensland mines?

    By M S. Tuohy

    Since the independent review of fatal accidents in the mining industry carried out by Dr Sean Brady (the ‘Brady Review’), High Reliability Organisations (HROs) and their operating principles have been

    May 5, 2022

  • AUSIMM
    Exploration advances – MinEx CRC’s mission

    By D Giles, A C. Bailey

    In the first 20 years of the 21st century, just over 20 per cent of Australian mineral exploration expenditure was dedicated to iron ore, totalling >A$8 billion and >30 million metres of drilling (Aus

    Nov 8, 2021

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Three-Dimensional Geometallurgical Data Integration for Predicting Concentrate Quality and Tailings Composition in a Massive Sulfide Deposit

    By R Knight

    The spatial variability of geometallurgical characteristics in a mineral deposit can have significant impact on financial and mine planning, mineral processing, concentrate quality and tailings compos

    Sep 5, 2011

  • AUSIMM
    Enabling Technologies – The Role of New Communications Technologies

    By C Fischer

    The introduction of digital communications technologies into the underground mining industry, in both coal and hard rock mining, has enabled high bandwidth applications to be applied in the mining ind

    Nov 22, 2011

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • AUSIMM
    The Status of Implementation of Proximity Detection Systems in Underground Mines

    By D Kent

    The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b

    Mar 21, 2011

  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • AUSIMM
    Mineralisation Styles and Geochemistry in the Paddy's Flat Gold District, Meekatharra, Western Australia

    By Kavanagh M. E, Henley R. W

    The Meekatharra mining district lies in the northern pan of the Murchison Province of the Archaean Ynlgam block of Western Australia. Since dis- covery of the Paddy's Flat belt in the district i

    Jan 1, 1991

  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    Incorporating Sustainability into Mining Plant and Infrastructure Design

    By A Murphy

    Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They

    Jul 16, 2014

  • AUSIMM
    Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open Pit

    The Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti

    Nov 25, 2010

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • AUSIMM
    Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow Tests

    Traditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel

    Jul 1, 2013

  • AUSIMM
    Comparison of heat, noise and ore handling capacity of battery-electric versus diesel LHD

    By C McGuire

    As mobile equipment electrification in underground mining continues to gain popularity, control ofheat and humidity in the workplace is becoming a key driver in sizing of ventilation and mine aircooli

    Oct 12, 2022