Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimal ore blending given geological uncertainty

    By M Forbes, R Jeuken

    Brownfields geoscience measurement such as drilling and surface geophysics can be costly and it is often difficult to weigh the cost of data collection and processing against the value it unlocks at t

    Mar 22, 2022

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Ore recovery on a room and pillar zinc mine

    By J Santana, V Ferraz, G Pinto, G Cruzado

    Morro Agudo is an underground zinc and lead mine owned by Nexa Resources. The mine uses room and pillar as the main mining method. The recovery of pillars as well as the opening of new excavations usi

    Nov 29, 2022

  • AUSIMM
    Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave Mines

    By S Talu, E Savage, P Sturm, A van As

    It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety

    May 9, 2016

  • AUSIMM
    Enhancing Risk Management in Strategic Mine Planning through Uncertainty Analysis

    By C Fricke, R Wood, P Velletri

    "In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ

    Nov 24, 2014

  • AUSIMM
    Role of Environmental Ore Deposit Models in Resources Development

    By Y T. J Kwong

    With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource

    Aug 22, 2011

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore fines

    By T Walkemeyer, R Elliott, D Chang-Martin

    Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins

    Sep 18, 2023

  • AUSIMM
    Staurolite Product Development

    By S Benson

    Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is

    Jan 1, 2001

  • AUSIMM
    Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence

    "Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-

    Mar 8, 2016

  • AUSIMM
    The Merlin Zone – Rhenium Quality Assurance

    By D A. Sketchley

    The Merlin Zone, a 2008 high-grade Mo-Re discovery, is a part of the Mount Dore Deposit in the Eastern Succession of the Mount Isa Inlier in Queensland, Australia. Hosted by carbonaceous metapelites a

    Aug 22, 2011

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014

  • AUSIMM
    How to Prioritise Process Improvements

    By D J. Hill

    "Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr

    Sep 1, 2014

  • AUSIMM
    Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave Operations

    By G Chitombo, A Perryman, A D. Campbell, J White, B Hollis

    This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable

    May 9, 2016

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    Ground support rationalisation at Golden Grove

    By R Varden

    This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications

    Mar 29, 2023

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015

  • AUSIMM
    Whole of mine planning – Evolution Mount Rawdon case study

    By M L, G Maddocks, A Ferrier, ers, A Forbes

    Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr

    Aug 2, 2023

  • AUSIMM
    Moriarty was a Conglomerate – Experiences and Implications of Coal Mining under Massive Strata in the Newcastle Coalfield

    By M Creech

    During the 1990s, wider and more productive longwall panels were being introduced into the Newcastle Coalfield. The strata of the Newcastle Coalfield incorporate numerous massive sandstones and conglo

    Aug 18, 2014

  • AUSIMM
    Preventing unwanted events critical controls – success and failure in implementing the ICMM guidance

    By A P. Wilkinson

    This paper reports on the implementation of the critical control concept to manage material risks in the mining and metals industries. The critical control management (CCM) approach assumes it is bett

    Apr 16, 2024