Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Automated Multi-Drills in Rio TintoBy C McHugh, F Oppolzer, B Rogers, A Stokes
Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation has more to do with improving the accuracy and consistency of mining pr
Sep 18, 2012
-
Ore recovery on a room and pillar zinc mineBy J Santana, V Ferraz, G Pinto, G Cruzado
Morro Agudo is an underground zinc and lead mine owned by Nexa Resources. The mine uses room and pillar as the main mining method. The recovery of pillars as well as the opening of new excavations usi
Nov 29, 2022
-
The application of critical chain project management to sublevel open stoping at Olympic DamBy J Light
Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t
Mar 29, 2023
-
The Merlin Zone – Rhenium Quality AssuranceBy D A. Sketchley
The Merlin Zone, a 2008 high-grade Mo-Re discovery, is a part of the Mount Dore Deposit in the Eastern Succession of the Mount Isa Inlier in Queensland, Australia. Hosted by carbonaceous metapelites a
Aug 22, 2011
-
Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave MinesBy S Talu, E Savage, P Sturm, A van As
It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety
May 9, 2016
-
Enhancing Risk Management in Strategic Mine Planning through Uncertainty AnalysisBy C Fricke, R Wood, P Velletri
"In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ
Nov 24, 2014
-
An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and StructuresBy L Cain, C Every, S Mirlatifi, J Ashley
This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor
Sep 17, 2014
-
An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore finesBy T Walkemeyer, R Elliott, D Chang-Martin
Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins
Sep 18, 2023
-
Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence"Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-
Mar 8, 2016
-
Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?By M Berry
Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w
Aug 18, 2014
-
How to Prioritise Process ImprovementsBy D J. Hill
"Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr
Sep 1, 2014
-
Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave OperationsBy G Chitombo, A Perryman, A D. Campbell, J White, B Hollis
This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable
May 9, 2016
-
Local uncertainty benchmarking – a coal case studyBy R Saha, D Barry, C Mawdesley, O Bertoli
Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often
Sep 20, 2017
-
Moriarty was a Conglomerate – Experiences and Implications of Coal Mining under Massive Strata in the Newcastle CoalfieldBy M Creech
During the 1990s, wider and more productive longwall panels were being introduced into the Newcastle Coalfield. The strata of the Newcastle Coalfield incorporate numerous massive sandstones and conglo
Aug 18, 2014
-
Ground support rationalisation at Golden GroveBy R Varden
This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications
Mar 29, 2023
-
Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical TechniquesBy D J. Bradshaw, B Lottermoser, A Parbhakar-Fox
"Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency
Sep 29, 2013
-
Process and Engineering Improvements Increase Production at Hamersley Iron's Pellet PlantBy Lynch K. S, Street R. P
Hamersley Iron's pellet plant at Dampier involves ore drying, dry grind- ing in ball mills, disc balling and, indurating by use of the straight grate system. After five years of operation, the
Jan 1, 1973
-
PMAP – smart and sustainable in situ treatment of mine wastewater and critical metals recovery technologyBy M Barkh, F X. Spachtholz
The mining industry faces significant environmental challenges in managing tailing ponds and wastewater treatment, including the risk of contaminated water, breaches of tailing dams, and energy-intens
Sep 1, 2024
-
The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope DesignBy A Muhairini, M Eggers, J Smith, H Baxter
Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au
Jul 13, 2015
-
Whole of mine planning – Evolution Mount Rawdon case studyBy M L, G Maddocks, A Ferrier, ers, A Forbes
Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr
Aug 2, 2023